At least 19 records

An Analysis of the Second Project High Water Data

Early in 1962 NASA established "Project High Water" to investigate the sudden release of large quantities of water into the upper atmosphere. The primary objectives of these experiments were to obtain information on the behavior of liquids released in the ionosphere and the localized effects on the ionosphere produced by the injection of large quantities of water. The data obtained in the two (2) Project High Water experiments have yielded an extensive amount of information concerning the complex phenomena associated with the sudden release of liquids in the Ionosphere. The detailed analysis of data obtained during the second Project High Water experiment (i.e., the third Saturn I vehicle test or SA-3) presented in this report demonstrates that the objectives of the Project High Water were achieved. In addition, the Project High Water has provided essential information relevant to a number of problems vital to manned explorations of space.

Woodbridge, David D.↗

An analysis of project high water data

Optical and radio frequency electromagnetic observations of high water release in ionosphere and atmospheric turbulence following liquid release in space

HIGH WATER PROJECT↗

Proton-Conducting Ceramic Electrolyzers for High-Temperature Water Splitting

This project is centered on an exciting new class of proton-conducting ceramic materials that are emerging from the laboratory to play important roles in the commercial sector. While proton-conducting ceramics have been studied since the early 1980s, the unique properties of these materials are only now being harnessed to address societal challenges. The objective of this project is to develop advanced high-temperature water splitting (HTWS) systems for production of hydrogen at a cost less than $2 / kg H2. The specific objectives include development of efficient and durable electrolytic cells and stacks using innovative proton-conducting ceramic materials and operating at a temperature ≥ 500°C. The technical performance targets for the electrolysis stack include: specific resistance of ≤ 0.30 Ω cm 2 , stack electrical efficiency > 95% LHV H2 with current density > 1 A / cm 2 , and a projected stack lifetime of ≥ 7 years. In this program, FuelCell Energy (FCE) teamed with Colorado School of Mines (CSM) to deliver a novel protonic-ceramic electrolysis cell (PCEC) stack capable of producing over 1 kg H2 / day. These targets were demonstrated in an HTWS stack with a capacity for producing ≥1 kg H2 / day.

08 HYDROGEN↗

HydroGEN Seedling: Monolithically Integrated Thin Film/Silicon Tandem Photoelectrodes for High-Efficiency and Stable Photoelectrochemical Water Splitting

In this project, we propose to develop monolithically integrated Si-based tandem photoelectrodes to achieve both high solar-to-hydrogen (STH) efficiency (>15%) and long-term stability (>1,000 hours) in spontaneous water splitting systems. The proposed tandem devices consist of a Ta 3 N 5 , BCTSSe, or In 0.5 Ga 0.5 N top junction, which has a bandgap of ~1.7-2.0 eV and can split the solar spectrum with the Si bottom junction. Ta 3 N 5 , BCTSSe, and InGaN will be grown/deposited on a low-resistivity nanowire tunnel junction on Si substrates using atomic layer deposition (ALD), sputtering, and molecular beam epitaxy (MBE), respectively. Both n and p-type Si solar wafers will be utilized, which can serve as the photoanode or photocathode, respectively. We will use N-rich GaN ultrathin passivation layers to protect photoelectrodes from corrosion and oxidation.

08 HYDROGEN↗

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) is a type of energy storage that uses the pumping and release of water between two reservoirs at different elevations to store water and generate electricity (Figure ES-1). When demand for electricity is low, a PSH project can use low cost energy to pump water from the lower reservoir to the upper reservoir for storage. When demand for electricity is high, a PSH project can release water from the upper reservoir through a powerhouse to generate electricity. Traditionally, this meant that PSH plants generated power during the day and pumped at night, with modest diurnal or seasonal variation.

13 HYDRO ENERGY↗

Ultra-high resolution water window x ray microscope optics design and analysis

This project has been focused on the design and analysis of an ultra-high resolution water window soft-x-ray microscope. These activities have been accomplished by completing two tasks contained in the statement of work of this contract. The new results from this work confirm: (1) that in order to achieve resolutions greater than three times the wavelength of the incident radiation, it will be necessary to use spherical mirror surfaces and to use graded multilayer coatings on the secondary in order to accommodate the large variations of the angle of incidence over the secondary when operating the microscope at numerical apertures of 0.35 or greater; (2) that surface contour errors will have a significant effect on the optical performance of the microscope and must be controlled to a peak-to-valley variation of 50-100 A and a frequency of 8 periods over the surface of a mirror; and (3) that tolerance analysis of the spherical Schwarzschild microscope has been shown that the water window operations will require 2-3 times tighter tolerances to achieve a similar performance of operations with 130 A radiation. These results have been included in a manuscript included in the appendix.

Shealy, David L.↗

Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory facility (Project) located at Sandia National Laboratories, 7011 East Avenue, CA. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC. The project proposes converting an asphalt parking lot into a new high bay machine shop building and a low bay office building. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area of 1.6 acres exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

54 ENVIRONMENTAL SCIENCES↗

Enabling Efficient Water Splitting with Advanced Materials Designed for High pH Membrane Interface

This project was focused on developing the durable, high-performance materials and interfaces for advanced water splitting, enabling a clear pathway for achieving <$2/Kg H2 (on scale) with efficiency of 43 kWh/kg H 2 via anion exchange membrane (AEM)-based electrolysis. We aimed to advance these final goals via an improved fundamental understanding of both hydrogen and oxygen evolution reactions (HER/OER) leading to novel platinum group metal (PGM)-free catalyst materials in conjunction with critical improvements in membrane and ionomers and gas evolution electrodes with corresponding characterization and testing. Northeastern University (NU) lead this effort focusing on catalyst development and characterization (both in situ and ex situ) while project partners lead improvements in ionomer and membrane materials and will aid in the development of specialized electrode and membrane electrode assemblies. In addition, close collaboration occured with the HydroGEN Energy Materials Network (EMN) National Laboratory consortium including efforts related to use of advanced ionomers, durability protocols and validation of electrolyzer materials (e.g. NREL), multiscale modeling and computation (e.g. LBNL), and molecular dynamics (MD) simulations of the membrane catalyst interface (e.g. SNL). The interactions with HydroGEN included exchange of data and materials as needed to facilitate project success.

08 HYDROGEN↗

Fatigue Test Result for High Burnup Pressurized Water Reactor Rods

The High Burnup Spent Fuel Data Project, sponsored by DOE-NE, is focused on understanding the effects of long-term storage and transportation on high burnup (HBU) (>45 gigawatt days per metric ton uranium) light water reactor fuel. The experiment includes 32 HBU spent nuclear fuel (SNF) assemblies that will be stored in a typical Independent Spent Fuel Storage Installation (ISFSI) and 25 sister rods - nine SNF rods that were removed from the fuel assemblies prior to insertion to the ISFSI and 16 SNF rods removed from similar HBU assemblies. The sister rods provide a baseline of the condition of the HBU rods prior to loading, drying, and long-term dry storage. Destructive examinations of the sister rods are focused on understanding overall SNF rod strength and durability. Both composite fuel and empty cladding will be tested to derive material properties. While the data generated can be used for multiple purposes, a primary goal of the sister rod PIE data and associated measured mechanical properties is to support existing fuel storage licensing and relicensing activities by addressing identified knowledge gaps, and enhance the technical basis for post-storage transportation, handling, and consolidation activities. Fatigue tests of HBU M5-clad, ZIRLO-clad, Zircaloy-4, and low tin Zircaloy-4 segments have been completed using ORNL’s Cyclic Integral Reversible Fatigue Tester (CIRFT). This is the first time ZIRLO-clad rods have been tested. Some of the segments were heat-treated to understand the effects of thermal transients such as those encountered during dry storage vacuum drying on the fatigue lifetime. This paper presents results of the fatigue tests obtained to date and discusses planned future tests.

Montgomery, Rose↗

Benchmarking Advanced Water Splitting Technologies: Best Practices in Materials Characterization

The high-level project goal is to create a comprehensive Best Practices benchmarking framework at the materials, component, device and systems levels for advanced water splitting technologies. All advanced water splitting pathways covered under the HydroGEN Energy Materials Network (EMN) Consortium, which include advanced high and low temperature electrolysis of water, photoelectrochemical (PEC) water splitting and solar thermochemical hydrogen (STCH) need these best practices to advance materials discovery. These practices will also aid the H2@Scale DOE initiative to accomplish their goals of large-scale H2 production.

08 HYDROGEN↗

Stormwater Pollution Prevention Plan (SWPPP) for Site Wide Landscaping Project

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the SNL/CA Site Landscaping Project at Sandia National Laboratories/California (SNL/CA), 7011 East Avenue, Livermore, California (SNL/CA). The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia (NTESS), LLC. The project proposes landscape improvements throughout SNL/CA. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ADVANCED TECHNIQUES FOR ENERGY INPUT REDUCTION IN GYPSUM WALLBOARD DRYING

Gypsum has been used for thousands of years in building and construction applications, starting with the pyramids in ancient Egypt, to “Plaster of Paris” in the midcenturies, and to the now-ubiquitous drywall in modern-day houses. Production of gypsum drywall boards takes several steps with high energy and water consumption. The current state of the art in industry is a process that begins by mining gypsum and reducing its particle size by milling. These gypsum particles undergo calcination to convert the gypsum (calcium sulfate dihydrate) into stucco (calcium sulfate hemihydrate). The stucco is mixed with additives and enough water to form a slurry that can be poured onto a conveyor belt and molded into the desired geometry. The stucco reacts with the water, converting back into gypsum. The remaining water is then dried from the board to form the final product. While only ~20 wt. % of water is needed for the conversion of stucco to gypsum, significant excess water is needed to ensure sufficient fluidity of the slurry for processibility. This is due to the low quality of the stucco particles produced in high throughput calcination units, which disintegrate upon mixing with water, thereby reducing the fluidity and processability of the slurry. This project aims to produce high-quality stucco particles by dielectric calcination. In doing so, particle integrity can be maintained through the slurry formulation step, and particle size distribution of the stucco can be adjusted to increase fluidity with less excess water. With less water remaining unreacted in the board, significant energy can be saved in drying the product. The project aims to 1) develop a dielectric calcination method to TRL 3, 2) determine optimal and practical particle size distributions to minimize excess water in the slurry, and 3) reduce the energy consumption of the drying process.

Conforti, Kameron↗

Final Report on Aerosol Pretreatment Technology Performance and Benchmarking

Solvent-based post-combustion CO 2 capture (PCC) technology remains one of the leading methods to combat global CO 2 emissions produced from large-scale coal-fired power production. Advanced solventbased PCC technology has made significant improvements in design and performance that reduce capital and operating costs to enable its commercial use. Key to low cost, manageable logistics, and environmentally safe operation of solvent-based PCC technology are minimal solvent losses from the process through the treated gas stream exiting PCC plant absorbers. High flue gas aerosol particle concentrations (>10 5 particles/cm 3 ) for particles in the range of 70-200 nm have been shown to cause significant amine solvent losses for solvent-based PCC processes through several mechanisms including absorption of solvent and water into growing aerosol particles. Flue gas aerosol pretreatment technology is the only realistic and economically attractive method to reduce very high aerosol particle concentrations (>10 7 particles/cm 3 ) to enable solvent-based PCC for existing power plants lacking sufficient particle removal systems, such as baghouses. The overall goal of this project was to design, construct, independently test, and evaluate three flue gas aerosol pretreatment technologies identified to significantly reduce high aerosol particle concentrations (>10 7 particles/cm 3 ) in the 70-200 nm particle size range: (1) a novel, high-velocity water injection spray concept developed by RWE and tested by Linde, (2) an innovative electrostatic precipitator (ESP) device with optimized operating conditions developed by Washington University in St. Louis (WUSTL), and (3) a non-regenerative sorbent-based filter technology developed by InnoSepra for SO x and NO x removal from coal-fired power plant flue gas. Each technology has been validated with tests on 500-1000 scfm of actual coal-fired flue gas and evaluated in terms of particle removal efficiency (%), cost competitiveness, and environmental impact. Aerosol measurements were performed upstream and downstream of each aerosol reduction unit during independent testing of each technology using advanced instrumentation and analytical methods provided by WUSTL. To perform aerosol measurements, isokinetic probes were inserted into flanged pipes attached to the flue gas piping, and a small suction pump was used to sample gas containing aerosol particles. Aerosol particle number concentrations (# particles/cm 3 ) and size distributions were then measured using a scanning mobility particle sizer (SMPS, TSI Inc.) for very fine particles (<1,000 nm) and a particle counter manufactured by GRIMM for particles larger than 1,000 nm. This report summarizes the aerosol removal performance results from pilot scale testing of each technology. Performance results have been benchmarked against pre-defined targets and other flue gas aerosol pretreatment technologies with documented performance. Linde Gas North America LLC has been the prime contractor to DOE responsible for overall project management and provided the design for the high-velocity water spray-based aerosol removal technology based on a design concept developed by the German utility company RWE.

20 FOSSIL-FUELED POWER PLANTS↗