Search NASA⌕ Search

SEARCH · Search NASA

Results for “HIGH WATER PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Proton-Conducting Ceramic Electrolyzers for High-Temperature Water Splitting

This project is centered on an exciting new class of proton-conducting ceramic materials that are emerging from the laboratory to play important roles in the commercial sector. While proton-conducting ceramics have been studied since the early 1980s, the unique properties of these materials are only now being harnessed to address societal challenges. The objective of this project is to develop advanced high-temperature water splitting (HTWS) systems for production of hydrogen at a cost less than $2 / kg H2. The specific objectives include development of efficient and durable electrolytic cells and stacks using innovative proton-conducting ceramic materials and operating at a temperature ≥ 500°C. The technical performance targets for the electrolysis stack include: specific resistance of ≤ 0.30 Ω cm 2 , stack electrical efficiency > 95% LHV H2 with current density > 1 A / cm 2 , and a projected stack lifetime of ≥ 7 years. In this program, FuelCell Energy (FCE) teamed with Colorado School of Mines (CSM) to deliver a novel protonic-ceramic electrolysis cell (PCEC) stack capable of producing over 1 kg H2 / day. These targets were demonstrated in an HTWS stack with a capacity for producing ≥1 kg H2 / day.

08 HYDROGEN↗

HydroGEN Seedling: Monolithically Integrated Thin Film/Silicon Tandem Photoelectrodes for High-Efficiency and Stable Photoelectrochemical Water Splitting

In this project, we propose to develop monolithically integrated Si-based tandem photoelectrodes to achieve both high solar-to-hydrogen (STH) efficiency (>15%) and long-term stability (>1,000 hours) in spontaneous water splitting systems. The proposed tandem devices consist of a Ta 3 N 5 , BCTSSe, or In 0.5 Ga 0.5 N top junction, which has a bandgap of ~1.7-2.0 eV and can split the solar spectrum with the Si bottom junction. Ta 3 N 5 , BCTSSe, and InGaN will be grown/deposited on a low-resistivity nanowire tunnel junction on Si substrates using atomic layer deposition (ALD), sputtering, and molecular beam epitaxy (MBE), respectively. Both n and p-type Si solar wafers will be utilized, which can serve as the photoanode or photocathode, respectively. We will use N-rich GaN ultrathin passivation layers to protect photoelectrodes from corrosion and oxidation.

08 HYDROGEN↗

A Comparison of the Environmental Effects of Open-Loop and Closed-Loop Pumped Storage Hydropower

Pumped storage hydropower (PSH) is a type of energy storage that uses the pumping and release of water between two reservoirs at different elevations to store water and generate electricity (Figure ES-1). When demand for electricity is low, a PSH project can use low cost energy to pump water from the lower reservoir to the upper reservoir for storage. When demand for electricity is high, a PSH project can release water from the upper reservoir through a powerhouse to generate electricity. Traditionally, this meant that PSH plants generated power during the day and pumped at night, with modest diurnal or seasonal variation.

13 HYDRO ENERGY↗

Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory facility (Project) located at Sandia National Laboratories, 7011 East Avenue, CA. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC. The project proposes converting an asphalt parking lot into a new high bay machine shop building and a low bay office building. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area of 1.6 acres exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

54 ENVIRONMENTAL SCIENCES↗

Enabling Efficient Water Splitting with Advanced Materials Designed for High pH Membrane Interface

This project was focused on developing the durable, high-performance materials and interfaces for advanced water splitting, enabling a clear pathway for achieving <$2/Kg H2 (on scale) with efficiency of 43 kWh/kg H 2 via anion exchange membrane (AEM)-based electrolysis. We aimed to advance these final goals via an improved fundamental understanding of both hydrogen and oxygen evolution reactions (HER/OER) leading to novel platinum group metal (PGM)-free catalyst materials in conjunction with critical improvements in membrane and ionomers and gas evolution electrodes with corresponding characterization and testing. Northeastern University (NU) lead this effort focusing on catalyst development and characterization (both in situ and ex situ) while project partners lead improvements in ionomer and membrane materials and will aid in the development of specialized electrode and membrane electrode assemblies. In addition, close collaboration occured with the HydroGEN Energy Materials Network (EMN) National Laboratory consortium including efforts related to use of advanced ionomers, durability protocols and validation of electrolyzer materials (e.g. NREL), multiscale modeling and computation (e.g. LBNL), and molecular dynamics (MD) simulations of the membrane catalyst interface (e.g. SNL). The interactions with HydroGEN included exchange of data and materials as needed to facilitate project success.

08 HYDROGEN↗

Fatigue Test Result for High Burnup Pressurized Water Reactor Rods

The High Burnup Spent Fuel Data Project, sponsored by DOE-NE, is focused on understanding the effects of long-term storage and transportation on high burnup (HBU) (>45 gigawatt days per metric ton uranium) light water reactor fuel. The experiment includes 32 HBU spent nuclear fuel (SNF) assemblies that will be stored in a typical Independent Spent Fuel Storage Installation (ISFSI) and 25 sister rods - nine SNF rods that were removed from the fuel assemblies prior to insertion to the ISFSI and 16 SNF rods removed from similar HBU assemblies. The sister rods provide a baseline of the condition of the HBU rods prior to loading, drying, and long-term dry storage. Destructive examinations of the sister rods are focused on understanding overall SNF rod strength and durability. Both composite fuel and empty cladding will be tested to derive material properties. While the data generated can be used for multiple purposes, a primary goal of the sister rod PIE data and associated measured mechanical properties is to support existing fuel storage licensing and relicensing activities by addressing identified knowledge gaps, and enhance the technical basis for post-storage transportation, handling, and consolidation activities. Fatigue tests of HBU M5-clad, ZIRLO-clad, Zircaloy-4, and low tin Zircaloy-4 segments have been completed using ORNL’s Cyclic Integral Reversible Fatigue Tester (CIRFT). This is the first time ZIRLO-clad rods have been tested. Some of the segments were heat-treated to understand the effects of thermal transients such as those encountered during dry storage vacuum drying on the fatigue lifetime. This paper presents results of the fatigue tests obtained to date and discusses planned future tests.

Montgomery, Rose↗

Benchmarking Advanced Water Splitting Technologies: Best Practices in Materials Characterization

The high-level project goal is to create a comprehensive Best Practices benchmarking framework at the materials, component, device and systems levels for advanced water splitting technologies. All advanced water splitting pathways covered under the HydroGEN Energy Materials Network (EMN) Consortium, which include advanced high and low temperature electrolysis of water, photoelectrochemical (PEC) water splitting and solar thermochemical hydrogen (STCH) need these best practices to advance materials discovery. These practices will also aid the H2@Scale DOE initiative to accomplish their goals of large-scale H2 production.

08 HYDROGEN↗

Stormwater Pollution Prevention Plan (SWPPP) for Site Wide Landscaping Project

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the SNL/CA Site Landscaping Project at Sandia National Laboratories/California (SNL/CA), 7011 East Avenue, Livermore, California (SNL/CA). The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia (NTESS), LLC. The project proposes landscape improvements throughout SNL/CA. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ADVANCED TECHNIQUES FOR ENERGY INPUT REDUCTION IN GYPSUM WALLBOARD DRYING

Gypsum has been used for thousands of years in building and construction applications, starting with the pyramids in ancient Egypt, to “Plaster of Paris” in the midcenturies, and to the now-ubiquitous drywall in modern-day houses. Production of gypsum drywall boards takes several steps with high energy and water consumption. The current state of the art in industry is a process that begins by mining gypsum and reducing its particle size by milling. These gypsum particles undergo calcination to convert the gypsum (calcium sulfate dihydrate) into stucco (calcium sulfate hemihydrate). The stucco is mixed with additives and enough water to form a slurry that can be poured onto a conveyor belt and molded into the desired geometry. The stucco reacts with the water, converting back into gypsum. The remaining water is then dried from the board to form the final product. While only ~20 wt. % of water is needed for the conversion of stucco to gypsum, significant excess water is needed to ensure sufficient fluidity of the slurry for processibility. This is due to the low quality of the stucco particles produced in high throughput calcination units, which disintegrate upon mixing with water, thereby reducing the fluidity and processability of the slurry. This project aims to produce high-quality stucco particles by dielectric calcination. In doing so, particle integrity can be maintained through the slurry formulation step, and particle size distribution of the stucco can be adjusted to increase fluidity with less excess water. With less water remaining unreacted in the board, significant energy can be saved in drying the product. The project aims to 1) develop a dielectric calcination method to TRL 3, 2) determine optimal and practical particle size distributions to minimize excess water in the slurry, and 3) reduce the energy consumption of the drying process.

Conforti, Kameron↗

Final Report on Aerosol Pretreatment Technology Performance and Benchmarking

Solvent-based post-combustion CO 2 capture (PCC) technology remains one of the leading methods to combat global CO 2 emissions produced from large-scale coal-fired power production. Advanced solventbased PCC technology has made significant improvements in design and performance that reduce capital and operating costs to enable its commercial use. Key to low cost, manageable logistics, and environmentally safe operation of solvent-based PCC technology are minimal solvent losses from the process through the treated gas stream exiting PCC plant absorbers. High flue gas aerosol particle concentrations (>10 5 particles/cm 3 ) for particles in the range of 70-200 nm have been shown to cause significant amine solvent losses for solvent-based PCC processes through several mechanisms including absorption of solvent and water into growing aerosol particles. Flue gas aerosol pretreatment technology is the only realistic and economically attractive method to reduce very high aerosol particle concentrations (>10 7 particles/cm 3 ) to enable solvent-based PCC for existing power plants lacking sufficient particle removal systems, such as baghouses. The overall goal of this project was to design, construct, independently test, and evaluate three flue gas aerosol pretreatment technologies identified to significantly reduce high aerosol particle concentrations (>10 7 particles/cm 3 ) in the 70-200 nm particle size range: (1) a novel, high-velocity water injection spray concept developed by RWE and tested by Linde, (2) an innovative electrostatic precipitator (ESP) device with optimized operating conditions developed by Washington University in St. Louis (WUSTL), and (3) a non-regenerative sorbent-based filter technology developed by InnoSepra for SO x and NO x removal from coal-fired power plant flue gas. Each technology has been validated with tests on 500-1000 scfm of actual coal-fired flue gas and evaluated in terms of particle removal efficiency (%), cost competitiveness, and environmental impact. Aerosol measurements were performed upstream and downstream of each aerosol reduction unit during independent testing of each technology using advanced instrumentation and analytical methods provided by WUSTL. To perform aerosol measurements, isokinetic probes were inserted into flanged pipes attached to the flue gas piping, and a small suction pump was used to sample gas containing aerosol particles. Aerosol particle number concentrations (# particles/cm 3 ) and size distributions were then measured using a scanning mobility particle sizer (SMPS, TSI Inc.) for very fine particles (<1,000 nm) and a particle counter manufactured by GRIMM for particles larger than 1,000 nm. This report summarizes the aerosol removal performance results from pilot scale testing of each technology. Performance results have been benchmarked against pre-defined targets and other flue gas aerosol pretreatment technologies with documented performance. Linde Gas North America LLC has been the prime contractor to DOE responsible for overall project management and provided the design for the high-velocity water spray-based aerosol removal technology based on a design concept developed by the German utility company RWE.

20 FOSSIL-FUELED POWER PLANTS↗

Effects of Residual Water on Storage Canister Internal Components

This report describes an evaluation of the spent nuclear fuel cladding and canister internal materials’ corrosion/oxidation due to (inadvertent) residual free water inside a dry storage canister post-dryout. Drying of spent nuclear fuel (SNF) and the impact of (inadvertent) residual water in a SNF canister is being addressed under the DOE-NE Spent Fuel and Waste Science and Technology (SFWST) program to ensure the safe extended dry storage and transportation of commercial SNF. A long-standing understanding has been that the amount of residual water in a storage canister after vacuum drying is not expected to be much more than trace amounts of 0.43 gram mole. However, recent findings from the High Burnup Demonstration project, and an Integrated Research Project show that residual free water well above the amount of approximately 0.43 gm-moles that had been assumed for a 3 torr rebound pressure, may remain within an SNF canister following prototypic drying. In fact, an NRC-NMSS sponsored study considered residual water amount as high as 55 moles. Considering the recent findings and the NRC-sponsored work, this present work was conducted to study the effects of unspecified amount of residual water on oxidation and corrosion of canister internals, i.e., it was assumed that the residual water amount is not limiting. It was assumed that the spent nuclear fuel content in the canister is not exposed to the internal environment, i.e., the packaged canister does not contain any damaged (breached) fuel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Temperature Alkaline Water Electrolysis

Hydrogen production for mobile and energy storage applications from water electrolysis is attractive due to its high efficiency, fast ramp rates, and potential for the clean energy economy. However, current hydrogen production from electrolysis comprises only a small fraction of the global hydrogen market due to the high cost associated with expensive stack materials (membrane, catalyst, and bipolar plates) and electricity consumption of the commercial electrolysis systems. In this project, we aimed to develop a high temperature alkaline water electrolyzer (HTAWE) that can simultaneously reduce the electrolyzer cost (by adopting cheap material) and improve energy efficiency (by enabling high-temperature operation).

08 HYDROGEN↗

SOLAr Critical Infrastructure Energization (SOLACE): Leveraging Distributed Energy Resources to Provide Local Power

This document is a technical report based on a large-scale DOE-funded project conducted between 2019 and 2022. The project, called SOLAr Critical infrastructure Energization (SOLACE), is aimed at leveraging distributed energy resources (DERs) to provide local power to communities, feeders, or other regions. The project included a particular focus on high-value critical loads such as municipal water supply, telecommunication hubs, and disaster shelters. The key developments of the project were: (1) A comprehensive pre-event power system analysis methodology that identifies and characterizes the viable local power options. (2) A DMS-based example control system for activating and operating the local power solution during a time of crisis. (3) Grid-forming inverter technology to enable isolated local power operation and black-starting. (4) Cyber-security considerations for isolated systems when wider-area communication may be offline. This report describes the overall process that identifies and assesses the viable DER-based local power solutions for a given facility, region, or community. The report documents the process, including the key analysis steps, tools required, data requirements, and recommended pass/fail criteria for each step. It also provides a sample implementation of this process through a test case. Finally, it provides details of how a viable pre-event plan can be selected and activated at go-time when an event has occurred.

14 SOLAR ENERGY↗

Low-Cost, High Performance Catalyst Coated Membranes for PEM Water Electrolyzers (Final Technical Report)

In this project, the objective was to develop reduced-cost manufacturing techniques capable of producing proton exchange membrane water electrolyzer (PEMWE) catalyst coated membranes (CCMs) with further improved performance relative to then-current 3M CCM technology. Processes to be developed would enable 1) production of 0.5 m wide CCMs (approximately 2x wider than produced by the current laboratory/pilot-scale processes) and 2) 3x higher net-effective linear rates (lineal-meters of CCM produced per cumulative process time) than the baseline CCM process. In combination, the wider width CCM and increased net-effective linear rates would result in a 6-fold decrease in CCM manufacturing cost (defined as cumulative machine and labor time) per m 2 of CCM produced. PEMWE CCMs produced with these optimized processes were targeted to produce 1) 0.25 A/cm 2 or greater at 1.5 V, 2) 2.0 A/cm 2 or greater at 1.75 V and 3) 4 A/cm 2 or greater at 1.95V, 4) with total catalyst platinum-group metal (PGM) loadings of ≤ 0.50 mg/cm 2 , measured in a cell with 50 cm 2 active area (or larger) at 80°C cell temperature and ambient outlet pressures.

08 HYDROGEN↗

High Efficiency PEM Water Electrolysis Enabled by Advanced Catalysts, Membranes and Processes

In this project, advanced membranes and catalysts were integrated into membrane electrode assembles (porous transport electrodes (PTE) or catalyst coated membranes (CCM)) leveraging precision coating methods to enable control of electrode structures and demonstration of the best component performance possible with these materials. Partner collaborations allowed for advanced characterization of the formed interfaces and degradation mechanisms. New methods of forming hydrogen recombination layers were also developed, to move away from wet chemistry processes that would have limited realization and implementation of the optimized electrode configurations in a commercial environment.

08 HYDROGEN↗

Evaluating an Earth system model from a water manager perspective

Abstract. The large spatial scale of global Earth system models (ESMs) is often cited as an obstacle to using the output by water resource managers in localized decisions. Recent advances in computing have improved the fidelity of hydrological responses in ESMs through increased connectivity between model components. However, the models are seldom evaluated for their ability to reproduce metrics that are important for and resonate with practitioners or that allow practitioners to situate higher-resolution model outputs within a cascade of uncertainty stemming from different models and scenarios. We draw on the combined experience of the author team and water manager workshop participants to identify salient water management metrics and evaluate whether they are credibly reproduced over the conterminous USA by the Community Earth System Model v2 (CESM2) Large Ensemble. We find that, while the exact values may not match the observations, aspects such as interannual variability can be reproduced by CESM2 for the mean wet day precipitation and length of dry spells. CESM2 also captures the proportion of total annual precipitation that derives from the heaviest rain days in watersheds that are not snow-dominated. Aggregating the 7 d mean daily runoff to two-digit Hydrological Unit Code (HUC2) watersheds also shows that rain-dominated regions capture the timing and interannual variability of annual maximum and minimum flows. We conclude that there is potential for far greater use of large-ensemble ESMs, such as CESM2, in long-range water management decisions to supplement high-resolution regional projections.

Tye, Mari R. (ORCID:0000000324911020)↗