Physical and Operational Status of the Photovoltaic Systems in the Municipality of Pinotepa de Don Luis, Oaxaca, One Year after Their Installation [Estado fisico y operativo de los sistemas fotovoltaicos en el municipio de Pinotepa de Don Luis, Oaxaca un ano despues de su instalacion]

In November 1990, an inspection visit was made to the residential lighting photovoltaic systems that had been installed approximately one year before in the rural communities of the Municipality of Pinotepa de Don Luis, in the State of Oaxaca. The main purpose of the visit was to evaluate the physical and operational status of these systems. The systems typically consist of a photovoltaic module with a capacity of 30 or 35 Watts, an automotive type battery, an indicator of the status of charge of the battery, 3 fluorescent lamps and the corresponding installation, including cables, connection or outlet box and switches. It can be seen that the systems are in good physical condition and do not show any signs of intentionally caused damage. However, the incidence of failures is higher than what had been expected; therefore the operational status of these systems is considered to be below a level that could be accepted, with a tendency to getting worse. The main problem that has been detected is the lack of automatic charge controllers. This problem has caused other important failures. Serious deficiencies were appreciated in the installations, which show evidence of the poor workmanship of the installers. The lack of system standardization is evident, both regarding the components and the installation. As a consequence, there are technical factors which indicate that the installed systems will keep deteriorating at a rate faster than normal, and will stop operating in a short time unless urgent preventive and corrective measures are taken. The attitude of the users with respect to the systems is generally positive. However, there are elements that make the correct operation and maintenance of these systems a very difficult task. The users did not receive any training regarding the best way to operate and take care of their systems, nor any other information in relation to their technical limitations.

14 SOLAR ENERGY

Calculating a minimum overlap period for successful intercalibration of soil moisture sensors

Abstract Long‐term in situ soil moisture monitoring inevitably requires sensors to be replaced. Ensuing discontinuities in the data record can be mitigated by intercalibration, however it is unclear how long the existing sensor needs to remain alongside the newly installed before there is enough overlapping data to generate a robust intercalibration. We used 154 pairs of established and newly installed sensors within the Marena, Oklahoma, In Situ Sensor Testbed to determine if there is a minimum overlap time that should be considered when planning upcoming replacements. Hourly observations of the existing sensor were linearly calibrated to those of the newly installed sensor with coefficients determined from overlap periods incremented by 30 days until a reference period of 2 years was reached. The resulting bias, root‐mean‐square error, and correlation coefficient for sensor pairs indicate that a minimum of 6 to 9 months of overlapping data are required to generate a successful intercalibration. Extending that to a full year before decommissioning the old sensor results in a stable intercalibration with higher confidence.

Agriculture

Solar Training and Education Partnership for Underserved Populations

Solar Landscape’s STEP-UP program provided high quality solar installation training in partnership with community-based organizations (CBOs) in various regions within the U.S. Solar Landscape leveraged internal subject matter experts (SME’s) industry guidance and regional training assessments to provide customized training designed to support the growing solar and broader energy sector. Upon completion of the program, the team assisted trainees and nonprofit partners with connections to Solar Landscape contractors as well as local and National residential solar installation companies to facilitate placement into careers and apprenticeships.

14 SOLAR ENERGY

Recommendations for Establishing Local Rural Electrification Programs Using Photovoltaic Systems [Recomendaciones Para la Implantacidn de Programas Locales de Electrificacidn Rural con Sistemas Fotovoltaicos]

Photovoltaic (PV) technology is becoming one the best options for supplying electricity to rural communities far from electrical networks and which have a small and disperse demand for electricity. As the cost of the technology goes down and its development advances, opportunities for applying it continue to grow. As a result, in the near future we will probably see an increase in massive application programs of this technology in rural Mexico. This document presents some of the most relevant problems needing immediate solution to increase the possibility of success in establishing photovoltaic programs for rural electrification in Mexico. These problems are influenced by economic, technological, engineering, infrastructural, social and political issues. The paper presents the requirements for an industrial center based on PV technology, the accessibility of replacement parts and maintenance service, development of financial solutions, training of the users and introducing norms and technical regulations. The document summarizes the issue of rural electrification in Mexico, emphasizing the low population density in these areas. A brief description is given of photovoltaics showing different configurations that can be utilized for supplying electricity to the rural areas. The issues involved and recommendations for introducing PV systems to the rural area are described.

14 SOLAR ENERGY

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS

Lessons learned from the development and implementation of a workforce training curriculum for advanced controls for high performance HVAC systems

Over the past decade, academic research on advanced controls has slowly transitioned into new software platforms, giving rise to various companies developing and deploying these innovative products, including solutions for light commercial HVAC systems. However, the current workforce remains widely unprepared to install, maintain and operate these systems, particularly complex software-based control platforms, as most workforce training programs still focus on traditional building automation for large commercial buildings. This paper presents the development and piloting of curriculum for three key types of professionals: ● Technicians (trade-level): installing and maintaining modern high-performance HVAC systems and controls ● Programmers (undergrad-level): developing and implementing advanced controls ● Engineers and energy professionals (undergrad/grad-level): managing and evaluating system performance We share details of the material developed including training videos, open-source software, instruction manuals. We also present the results of a pilot implementation of the training materials with real students.

Casillas, Armando

Forge Internship at FAST-IOTA

Assisted FAST facility personal with various upgrades and system installation activities during the summer 2026 FAST-IOTA shutdown as a part of the FORGE internship program. Herein is a summary of my involvement in and the results of that experience.

DeCraene, Ryan [Unlisted, US, IL]

CIEPAT for Photovoltaic System Resilience

The Cyber-Informed Engineering Photovoltaic Analysis Tool (CIEPAT) was developed in collaboration with the U.S. Department of Energy's Office of Cybersecurity, Energy Security, and Emergency Response (CESER). This tool is an energy source subcomponent integrated into the CIEMAT ecosystem and is developed to enhance the security and resilience of Photovoltaic installations by incorporating Cyber-Informed Engineering (CIE) principles into the deployment of PV systems.

14 SOLAR ENERGY

Molecules to Masterpieces: Bridging Materials Science and the Arts

Art and materials innovation have always been intertwined, dating back to the earliest human creations. In modern times, however, the increasing specialization of materials science often restricts artists' access to cutting-edge materials. Here, the materials science aspects of an art-science collaboration between artist Kimsooja and the Wiesner Lab at Cornell University, are detailed. The project involves the development of a custom-made iridescent block copolymer coating by means of self-assembly, originally applied to transparent window panels of a façade for the ≈14 m tall art installation: A Needle Woman: Galaxy Is a Memory, Earth is a Souvenir by artist Kimsooja. After several exhibitions in the US and Europe, the installation is now part of the permanent museum collection at Yorkshire Sculpture Park in Wakefield, UK. Full characterization of the solution blade-cast coatings show shear aligned, standing up lamellar morphologies that behave as volume-phase gratings with periodicities between 300 and 400 nm. Coatings are also applied to foldable (origami) paper and converted into iridescent porous ceramic materials. Furthermore, it is hoped this work inspires and informs communities across materials science, the arts, and architecture.

Architectural nanomaterials

Electrocatalytic grafting of polyvinyl chloride plastics

Polyvinyl chloride (PVC) plastics require high loadings of plasticizers and stabilizers to achieve commercially useful bulk properties. However, these non-covalent additives leach from PVC over time, resulting in the loss of their tailored functionality. This work details the electrocatalytic functionalization of PVC to covalently graft plasticizing additives directly onto the polymer backbone. Here, mechanistic insights guided the design of electrocatalysts capable of modifying C–Cl bonds of PVC under mild conditions with high selectivity while suppressing side reactions such as elimination and chain scission. Functional groups that mimic PVC plasticizers are covalently installed into the backbone of PVC to create new materials with distinct bulk properties from the original polymer. The degree of polymer grafting is easily controlled by simply changing the redox capacity that is passed during electrolysis. This strategy is employed to create chemically- and leach-resistant PVC materials by directly electrolyzing mixtures of consumer PVC products

Zackasee, Jordan L.S.

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

Wetter, Michael [Lawrence Berkeley National Labora

Socio-Techno-Economic Feasibility of Deep Geothermal with EGS for Residential District Heating in the Northeastern United States

In this paper, we present socio-techno-economic simulation results for enhanced geothermal system (EGS) district heating systems in the northeastern United States. We applied the geospatial Distributed Geothermal Market Demand (dGeo) tool coupled with GEOPHIRES to evaluate the feasibility of geothermal deep direct-use, utilizing EGS reservoirs for providing residential heating with district heating systems. The results were combined with JEDI results to assess social impacts. Simulation results assuming doublet EGS reservoirs with target production temperature of 80 degrees C and newly constructed district heating systems indicate a wide range in system levelized cost of heat (LCOH) values ranging from ~$15/MMBtu to over $1,000/MMBtu, with most the attractive regions urban areas with high total thermal demand and high thermal demand density. We estimate about 60 GWth in potential installed capacity with LCOH values under $50/MMBtu and 100 GWth in potential capacity with LCOH values under $100/MMBtu, respectively.

15 GEOTHERMAL ENERGY

Adapting High-Resolution X-Ray Microcalorimeter Spectrometers to Transform MFE Plasma Diagnostics

The aim of this project was to begin the transformation of magnetic fusion energy (MFE) X-ray diagnostics by applying detector technology developed over the past several decades by the astrophysics community. We installed and operated an X-ray microcalorimeter detector system under fusion-relevant plasma conditions at the Madison Symmetric Torus (MST). X-ray microcalorimeter spectrometers combine the best characteristics of instrumentation currently available on fusion devices: the high spectral resolution of crystal spectrometers (2 eV) and broadband coverage provided by pulse-height analysis systems. These spectrometers have small port-access requirements, a key advantage for future MFE experiments. This new plasma diagnostic technique will satisfy the need for multispecies impurity ion data by providing absolute measurements of impurity core accumulation, and it will provide the core impurity ion temperature. This project was a joint effort between Lawrence Livermore National Laboratory (LLNL) and researchers at the Wisconsin Plasma Physics Laboratory (WiPPl) at the University of Wisconsin–Madison (UW–Madison). Megan E. Eckart is the principal investigator at LLNL, which is funded separately from UW–Madison. This final report fulfills the reporting obligation of the UW–Madison effort.

Den Hartog, Daniel J. [Department of Physics, Univ

The Future Polarized Target Program at Jefferson Lab

Polarized targets have played a crucial role in Jefferson Lab's exploration of nuclear structure over the past four decades. The three original experimental halls have seen 19 separate installations of polarized solid or gas targets for use in the particle physics scattering experiments, and this trend will continue in the next decade. Five polarized target systems are in preparation for use at JLab in the coming years. Hall B will see the use of two solid polarized targets, one longitudinally polarized to the beam, the other transversely, as well as a novel 3He gas polarized target. In Hall C, new experiments will augment the tensor polarization in dynamically polarized solids. Plans are under development to bring a polarized solid target to Jefferson Lab's photon beam hall, Hall D, for the first time. To support these efforts, the JLab polarized target group is building a test laboratory to develop dynamic nuclear polarization techniques, as well as an apparatus to irradiate target material using electrons from JLab's injector test facility. In this talk, we will explore the development progress and plans for each of these efforts.

Maxwell, James [Thomas Jefferson National Accelera

The CP-PAW Code Package for First-Principles Calculations from a User’s Perspective

CP-PAW is a combined electronic structure and ab initio molecular dynamics code to perform mixed quantum and classical simulations of atomistic condensed phase systems, such as solids, liquids, and molecular systems. As the name suggests, the CP-PAW code unifies the all-electron projector augmented-wave (PAW) method with the Car–Parrinello (CP) approach to determine not only the electronic and nuclear ground states of condensed matter but also to study their properties and dynamics. In addition to briefly outlining the underlying theory, the focus will be on the unique aspects of CP-PAW and how to correctly employ them as a user. How to install CP-PAW using the new build system will also be briefly mentioned.

Blöchl, Peter E [Institute for Theoretical Physic

Evaluating technology upgrades as a complement to traditional bill assistance programs

State programs to improve energy affordability and reduce energy burden (the share of income spent on energy) could mitigate concerns about rising electricity prices. Many states offer bill assistance and rebates for weatherization and rooftop solar to income-qualifying households. Here, we analyse how these approaches may complement one another to improve energy affordability. Results illustrate trade offs between program costs and energy burden reduction, as well as between a program’s upfront and ongoing costs. Generally, the three strategies complement one another to improve energy affordability at lower net present cost than bill assistance alone, with varying effects across regions. Weatherization can reduce the solar installation capacity needed, and both together can reduce or eliminate ongoing reliance on bill assistance. Under full uptake among cost-effective households, fully rebated weatherization and solar rebated at $0.48/Watt, combined with bill assistance, yield the same modelled net present cost as bill assistance alone while reducing the share of low-income owner-occupied households with high energy burdens from 66% to 19%, compared with 34% under bill assistance alone. Absent tax credits, weatherization still reduces energy burden and bill assistance program costs, whereas solar may not be cost-competitive.

Forrester, Sydney P

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION