Process Improvement For Pu-238 Production at Idaho National Laboratory
Idaho National Laboratory (INL) has supported the production of Pu-238 for future NASA deep space missions since 2017. Over this time, INL has worked to improve the qualification process of Pu-238 production targets as well as improve processes related to the shipping, storage, irradiation, and storage of Pu-238 production targets. Qualification of Pu-238 production targets began with flux measurements and scoping analysis to provide fundamental data to confirm the impacts on the operation of the Advanced Test Reactor (ATR), Fig1. Later, initial production targets were irradiated in ATR’s I-7 position, and then the South Flux Trap (SFT). A modified target design was then implemented which would use the full length of the ATR core and increase Pu-238 production. While working to improve and streamline the qualification of the Pu-238 production targets, INL worked to improve multiple operational aspects of the Pu-238 production process. These changes include updating procedures to streamline operations, supporting modification of shipping containers to contain five rather than one production target, reviewing target receipt procedures and changing work flow to provide flexibility in target receipt, and designing and fabricating support equipment for the storage and internal transfer of production targets