Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Guide”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

NASA Handbook for Models and Simulations: An Implementation Guide for NASA-STD-7009

The purpose of this Handbook is to provide technical information, clarification, examples, processes, and techniques to help institute good modeling and simulation practices in the National Aeronautics and Space Administration (NASA). As a companion guide to NASA-STD- 7009, Standard for Models and Simulations, this Handbook provides a broader scope of information than may be included in a Standard and promotes good practices in the production, use, and consumption of NASA modeling and simulation products. NASA-STD-7009 specifies what a modeling and simulation activity shall or should do (in the requirements) but does not prescribe how the requirements are to be met, which varies with the specific engineering discipline, or who is responsible for complying with the requirements, which depends on the size and type of project. A guidance document, which is not constrained by the requirements of a Standard, is better suited to address these additional aspects and provide necessary clarification. This Handbook stems from the Space Shuttle Columbia Accident Investigation (2003), which called for Agency-wide improvements in the "development, documentation, and operation of models and simulations"' that subsequently elicited additional guidance from the NASA Office of the Chief Engineer to include "a standard method to assess the credibility of the models and simulations."2 General methods applicable across the broad spectrum of model and simulation (M&S) disciplines were sought to help guide the modeling and simulation processes within NASA and to provide for consistent reporting ofM&S activities and analysis results. From this, the standardized process for the M&S activity was developed. The major contents of this Handbook are the implementation details of the general M&S requirements ofNASA-STD-7009, including explanations, examples, and suggestions for improving the credibility assessment of an M&S-based analysis.

Steele, Martin J.↗

Teamwork for Oversight of Processes and Systems (TOPS). Implementation guide for TOPS version 2.0, 10 August 1992

As the nation redefines priorities to deal with a rapidly changing world order, both government and industry require new approaches for oversight of management systems, particularly for high technology products. Declining defense budgets will lead to significant reductions in government contract management personnel. Concurrently, defense contractors are reducing administrative and overhead staffing to control costs. These combined pressures require bold approaches for the oversight of management systems. In the Spring of 1991, the DPRO and TRW created a Process Action Team (PAT) to jointly prepare a Performance Based Management (PBM) system titled Teamwork for Oversight of Processes and Systems (TOPS). The primary goal is implementation of a performance based management system based on objective data to review critical TRW processes with an emphasis on continuous improvement. The processes are: Finance and Business Systems, Engineering and Manufacturing Systems, Quality Assurance, and Software Systems. The team established a number of goals: delivery of quality products to contractual terms and conditions; ensure that TRW management systems meet government guidance and good business practices; use of objective data to measure critical processes; elimination of wasteful/duplicative reviews and audits; emphasis on teamwork--all efforts must be perceived to add value by both sides and decisions are made by consensus; and synergy and the creation of a strong working trust between TRW and the DPRO. TOPS permits the adjustment of oversight resources when conditions change or when TRW systems performance indicate either an increase or decrease in surveillance is appropriate. Monthly Contractor Performance Assessments (CPA) are derived from a summary of supporting system level and process-level ratings obtained from objective process-level data. Tiered, objective, data-driven metrics are highly successful in achieving a cooperative and effective method of measuring performance. The teamwork-based culture developed by TOPS proved an unequaled success in removing adversarial relationships and creating an atmosphere of continuous improvement in quality processes at TRW. The new working relationship does not decrease the responsibility or authority of the DPRO to ensure contract compliance and it permits both parties to work more effectively to improve total quality and reduce cost. By emphasizing teamwork in developing a stronger approach to efficient management of the defense industrial base TOPS is a singular success.

Strand, Albert A.↗

Simplifying applications software for vision guided robot implementation

A simple approach to robot applications software is described. The idea is to use commercially available software and hardware wherever possible to minimize system costs, schedules and risks. The U.S. has been slow in the adaptation of robots and flexible automation compared to the fluorishing growth of robot implementation in Japan. The U.S. can benefit from this approach because of a more flexible array of vision guided robot technologies.

Duncheon, Charlie↗

Environmental projects. Volume 5, part 1: Study of subsurface contamination. Part 2: Guide to implement environmental compliance programs

In support of the national goal for the preservation of the environment and the protection of human health and safety, NASA, the Jet Propulsion Laboratory, and the Goldstone Deep Space Communications Complex have adopted the position that their operating installations shall maintain a high level of compliance in regard to regulations concerning environmental hazards. An investigation carried out by Engineering Science, Inc. focused on possible underground contamination that may have resulted from leaks and/or spills from storage facilities at the Goldstone Communications Complex. It also involved the cleanup of a non-hazardous waste dumpsite at the Mojave Base Site at the Goldstone complex. The report also includes details of the management duties and responsibilities needed to maintain compliance with environmental laws and regulations.

Bengelsdorf, I.↗

Creation and Implementation of a Workforce Development Pipeline Program at MSFC

Within the context of NASA's Education Programs, this Workforce Development Pipeline guide describes the goals and objectives of MSFC's Workforce Development Pipeline Program as well as the principles and strategies for guiding implementation. It is designed to support the initiatives described in the NASA Implementation Plan for Education, 1999-2003 (EP-1998-12-383-HQ) and represents the vision of the members of the Education Programs office at MSFC. This document: 1) Outlines NASA s Contribution to National Priorities; 2) Sets the context for the Workforce Development Pipeline Program; 3) Describes Workforce Development Pipeline Program Strategies; 4) Articulates the Workforce Development Pipeline Program Goals and Aims; 5) List the actions to build a unified approach; 6) Outlines the Workforce Development Pipeline Programs guiding Principles; and 7) The results of implementation.

Hix, Billy↗

Science Data Preservation: Implementation and Why It Is Important

Remote Sensing data generation by NASA to study Earth s geophysical processes was initiated in 1960 with the launch of the first Television Infrared Observation Satellite Program (TIROS), to develop a meteorological satellite information system. What would be deemed as a primitive data set by today s standards, early Earth science missions were the foundation upon which today s remote sensing instruments have built their scientific success, and tomorrow s instruments will yield science not yet imagined. NASA Scientific Data Stewardship requirements have been documented to ensure the long term preservation and usability of remote sensing science data. In recent years, the Federation of Earth Science Information Partners and NASA s Earth Science Data System Working Groups have organized committees that specifically examine standards, processes, and ontologies that can best be employed for the preservation of remote sensing data, supporting documentation, and data provenance information. This presentation describes the activities, issues, and implementations, guided by the NASA Earth Science Data Preservation Content Specification (423-SPEC-001), for preserving instrument characteristics, and data processing and science information generated for 20 Earth science instruments, spanning 40 years of geophysical measurements, at the NASA s Goddard Earth Sciences Data and Information Services Center (GES DISC). In addition, unanticipated preservation/implementation questions and issues in the implementation process are presented.

Kempler, Steven J.↗

IS0 9000 Implementation and Assessment: A Guide to Developing and Evaluating Quality Management Systems

The agency has developed this reference publication to aid NASA organizations and their suppliers in the transition to IS0 9000. This guide focuses on the standard s intent, clarifies its requirements, offers implementation examples and highlights interrelated areas. It can assist anyone developing or evaluating NASA or supplier quality management systems. The IS0 9000 standards contain the basic elements for managing those processes that affect an organization's ability to consistently meet customer requirements. IS0 9000 was developed through the International Organization for Standardization and has been adopted as the US. national standard. These standards define a flexible foundation for customer focused process measurement, management and improvement that is the hallmark of world class enterprises.

Navarro, Robert J.↗

Systems cost/performance analysis; study 2.3. Volume 3: Programmer's manual and user's guide

The implementation of the entire systems cost/performance model as a digital computer program was studied. A discussion of the operating environment in which the program was written and checked, the program specifications such as discussions of logic and computational flow, the different subsystem models involved in the design of the spacecraft, and routines involved in the nondesign area such as costing and scheduling of the design were covered. Preliminary results for the DSCS-2 design are also included.

Source record↗

Diagnostic emulation: Implementation and user's guide

The Diagnostic Emulation Technique was developed within the System Validation Methods Branch as a part of the development of methods for the analysis of the reliability of highly reliable, fault tolerant digital avionics systems. This is a general technique which allows for the emulation of a digital hardware system. The technique is general in the sense that it is completely independent of the particular target hardware which is being emulated. Parts of the system are described and emulated at the logic or gate level, while other parts of the system are described and emulated at the functional level. This algorithm allows for the insertion of faults into the system, and for the observation of the response of the system to these faults. This allows for controlled and accelerated testing of system reaction to hardware failures in the target machine. This document describes in detail how the algorithm was implemented at NASA Langley Research Center and gives instructions for using the system.

Becher, Bernice↗

Software Implemented Fault-Tolerant (SIFT) user's guide

Program development for a Software Implemented Fault Tolerant (SIFT) computer system is accomplished in the NASA LaRC AIRLAB facility using a DEC VAX-11 to interface with eight Bendix BDX 930 flight control processors. The interface software which provides this SIFT program development capability was developed by AIRLAB personnel. This technical memorandum describes the application and design of this software in detail, and is intended to assist both the user in performance of SIFT research and the systems programmer responsible for maintaining and/or upgrading the SIFT programming environment.

Green, D. F., Jr.↗

Development and Preliminary Testing of a High Precision Long Stroke Slit Change Mechanism for the SPICE Instrument

In the frame of ESA's Solar Orbiter scientific mission, Almatech has been selected to design, develop and test the Slit Change Mechanism of the SPICE (SPectral Imaging of the Coronal Environment) instrument. In order to guaranty optical cleanliness level while fulfilling stringent positioning accuracies and repeatability requirements for slit positioning in the optical path of the instrument, a linear guiding system based on a double flexible blade arrangement has been selected. The four different slits to be used for the SPICE instrument resulted in a total stroke of 16.5 mm in this linear slit changer arrangement. The combination of long stroke and high precision positioning requirements has been identified as the main design challenge to be validated through breadboard models testing. This paper presents the development of SPICE's Slit Change Mechanism (SCM) and the two-step validation tests successfully performed on breadboard models of its flexible blade support system. The validation test results have demonstrated the full adequacy of the flexible blade guiding system implemented in SPICE's Slit Change Mechanism in a stand-alone configuration. Further breadboard test results, studying the influence of the compliant connection to the SCM linear actuator on an enhanced flexible guiding system design have shown significant enhancements in the positioning accuracy and repeatability of the selected flexible guiding system. Preliminary evaluation of the linear actuator design, including a detailed tolerance analyses, has shown the suitability of this satellite roller screw based mechanism for the actuation of the tested flexible guiding system and compliant connection. The presented development and preliminary testing of the high-precision long-stroke Slit Change Mechanism for the SPICE Instrument are considered fully successful such that future tests considering the full Slit Change Mechanism can be performed, with the gained confidence, directly on a Qualification Model. The selected linear Slit Change Mechanism design concept, consisting of a flexible guiding system driven by a hermetically sealed linear drive mechanism, is considered validated for the specific application of the SPICE instrument, with great potential for other special applications where contamination and high precision positioning are dominant design drivers.

Paciotti, Gabriel↗

SAMPEX payload operation control center implementation

The Solar Anomolous and Magnetospheric Explorer (SAMPEX) satellite was launched in July 1992. It was the first in the NASA Small Explorer (SMEX) series. In building the real-time control center facility, several new mission support challenges had to be met: CCSDS telemetry and command format, 900 Kbps telemetry data, and shorter turn-around time for control center development than previous missions. The SAMPEX Payload Operations Control Ccnter (POCC) was also the first control center for a new satellite to be based on the Transportable Payload Operations Control Center (TPOCC) system architecture and methodology. This approach has both guided the implementation of the SAMPEX control center and provided some of the building blocks. By using the TPOCC architecture to build the SAMPEX POCC, the real-time operations area was miniaturized into one room, whereas previous missions needed multiple large rooms. The development cost of the SAMPEX POCC was reduced from previous missions and will provide for further cost savings in the future SMEX satellites. This paper describes the system as built and some of the enhancements in progress to create this teleoperations environment.

Mandl, Daniel↗

Mars Pathfinder mission operations concepts

The Mars Pathfinder Project plans a December 1996 launch of a single spacecraft. After jettisoning a cruise stage, an entry body containing a lander and microrover will directly enter the Mars atmosphere and parachute to a hard landing near the sub-solar latitude of 15 degrees North in July 1997. Primary surface operations last for 30 days. Cost estimates for Pathfinder ground systems development and operations are not only lower in absolute dollars, but also are a lower percentage of total project costs than in past planetary missions. Operations teams will be smaller and fewer than typical flight projects. Operations scenarios have been developed early in the project and are being used to guide operations implementation and flight system design. Recovery of key engineering data from entry, descent, and landing is a top mission priority. These data will be recorded for playback after landing. Real-time tracking of a modified carrier signal through this phase can provide important insight into the spacecraft performance during entry, descent, and landing in the event recorded data is never recovered. Surface scenarios are dominated by microrover activity and lander imaging during 7 hours of the Mars day from 0700 to 1400 local solar time. Efficient uplink and downlink processes have been designed to command the lander and microrover each Mars day.

Sturms, Francis M., Jr.↗

Assume-Guarantee Verification of Source Code with Design-Level Assumptions

Model checking is an automated technique that can be used to determine whether a system satisfies certain required properties. To address the 'state explosion' problem associated with this technique, we propose to integrate assume-guarantee verification at different phases of system development. During design, developers build abstract behavioral models of the system components and use them to establish key properties of the system. To increase the scalability of model checking at this level, we have developed techniques that automatically decompose the verification task by generating component assumptions for the properties to hold. The design-level artifacts are subsequently used to guide the implementation of the system, but also to enable more efficient reasoning at the source code-level. In particular we propose to use design-level assumptions to similarly decompose the verification of the actual system implementation. We demonstrate our approach on a significant NASA application, where design-level models were used to identify; and correct a safety property violation, and design-level assumptions allowed us to check successfully that the property was presented by the implementation.

Giannakopoulou, Dimitra↗

Bioastronautics Roadmap: A Risk Reduction Strategy for Human Space Exploration

The Bioastronautics Critical Path Roadmap is the framework used to identify and assess the risks to crews exposed to the hazardous environments of space. It guides the implementation of research strategies to prevent or reduce those risks. Although the BCPR identifies steps that must be taken to reduce the risks to health and performance that are associated with human space flight, the BCPR is not a "critical path" analysis in the strict engineering sense. The BCPR will evolve to accommodate new information and technology development and will enable NASA to conduct a formal critical path analysis in the future. As a management tool, the BCPR provides information for making informed decisions about research priorities and resource allocation. The outcome-driven nature of the BCPR makes it amenable for assessing the focus, progress and success of the Bioastronautics research and technology program. The BCPR is also a tool for communicating program priorities and progress to the research community and NASA management.

Source record↗

A Parametric Study on Using Active Debris Removal to Stabilize the Future LEO Debris Environment

Recent analyses of the instability of the orbital debris population in the low Earth orbit (LEO) region and the collision between Iridium 33 and Cosmos 2251 have reignited the interest in using active debris removal (ADR) to remediate the environment. There are; however, monumental technical, resources, operational, legal, and political challenges in making economically viable ADR a reality. Before a consensus on the need for ADR can be reached, a careful analysis of the effectiveness of ADR must be conducted. The goal is to demonstrate the feasibility of using ADR to preserve the future environment and to guide its implementation to maximize the benefit-cost ratio. This paper describes a comprehensive sensitivity study on using ADR to stabilize the future LEO debris environment. The NASA long-term, orbital debris evolutionary model, LEGEND, is used to quantify the effects of many key parameters. These parameters include (1) the starting epoch of ADR implementation, (2) various target selection criteria, (3) the benefits of collision avoidance maneuvers, (4) the consequence of targeting specific inclination or altitude regimes, (5) the consequence of targeting specific classes of vehicles, and (6) the timescale of removal. Additional analyses on the importance of postmission disposal and how future launches might affect the requirements to stabilize the environment are also included.

Liou, J.C.↗

A Parametric Study on Using Active Debris Removal for LEO Environment Remediation

Recent analyses on the instability of the orbital debris population in the low Earth orbit (LEO) region and the collision between Iridium 33 and Cosmos 2251 have reignited the interest in using active debris removal (ADR) to remediate the environment. There are; however, monumental technical, resource, operational, legal, and political challenges in making economically viable ADR a reality. Before a consensus on the need for ADR can be reached, a careful analysis of its effectiveness must be conducted. The goal is to demonstrate the need and feasibility of using ADR to better preserve the future environment and to guide its implementation to maximize the benefit-to-cost ratio. This paper describes a new sensitivity study on using ADR to stabilize the future LEO debris environment. The NASA long-term orbital debris evolutionary model, LEGEND, is used to quantify the effects of several key parameters, including target selection criteria/constraints and the starting epoch of ADR implementation. Additional analyses on potential ADR targets among the currently existing satellites and the benefits of collision avoidance maneuvers are also included.

Source record↗