At least 19 records

DRAFT: Accident Tolerant Fuels Draft Implementation Plan

The ATF Implementation Plan integrates DOE’s objectives and goals with the national laboratory’s expertise and infrastructure in support of the technology development by three industry partners. DOE’s plan is to develop advanced LWR fuels with enhanced accident tolerance in response to the Congressional request and to install a lead fuel assembly containing accident tolerant fuel technology in a U.S. commercial nuclear power plant by 2022. DOE has three contracts in place with each of the principle US commercial nuclear fuel vendors in support of ATF research and development, AREVA Services LLC, General Electric, and Westinghouse LLC. The purpose of the ATF Implementation Plan is to describe the technology development and progress required to insert one (or possible two) concepts as a LFR or LFA in a commercial LWR by 2022. In particular, this document shows the integration between the functional documents guiding ATF development and provides a rough order of magnitude estimate of the required budget from FY2016 through FY2022. It is expected that after FY2022, the needed budget request would significantly decrease as works transitions from Phase 2 to Phase 3, corresponding to a decrease in DOE project responsibility and an increase in industry responsibility and associated funding support.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Adaptive Transmission Planning: Implementing a New Paradigm for Managing Economic Risks in Grid Expansion

The problem of whether, where, when, and what type of transmission facilities to build in terms of minimizing costs and maximizing net economic benefits has been a challenge for the power industry from the beginning-ever since Thomas Edison debated whether to create longer dc distribution lines (with their high losses) or build new power stations in expanding his urban markets. Today's planning decisions are far more complex, as grids cover the continent and new transmission, generation, and demand-side technologies are emerging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FIELD IMPLEMENTATION PLAN FOR A WILLISTON BASIN BRINE EXTRACTION AND STORAGE TEST

The Energy & Environmental Research Center (EERC) successfully completed all technical work of Phase I, including development of a field implementation plan (FIP) for a brine extraction and storage test (BEST) in the North Dakota portion of the Williston Basin. This implementation plan was commissioned by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) as a proxy for managing formation pressure plumes and measuring/monitoring the movement of differential pressure and CO2 plumes in the subsurface for future saline CO2 storage projects. BEST comprises the demonstration and validation of active reservoir management (ARM) strategies and extracted brine treatment technologies. Two prospective commercial brine injection sites were evaluated for BEST to satisfy DOE’s goals. Ultimately, an active saltwater disposal (SWD) site, Johnsons Corner, was selected because it possesses an ideal combination of key factors making it uniquely suited to host BEST. This site is located in western North Dakota and operated by Nuverra Environmental Solutions (Nuverra), a national leader in brine handling, treatment, and injection. An integrated management approach was used to incorporate local and regional geologic characterization activities with geologic and simulation models, inform a monitoring, verification, and accounting (MVA) plan, and to conduct a risk assessment. This approach was used to design a FIP for an ARM schema and an extracted brine treatment technology test bed facility. The FIP leverages an existing pressure plume generated by two commercial SWD wells. These wells, in conjunction with a new brine extraction well, will be used to conduct the ARM schema. Results of these tests will be quantified based on their impact on the performance of the existing SWD wells and the surrounding reservoir system. Extracted brine will be injected into an underlying deep saline formation through a new injection well. The locations of proposed extraction and injection wells were selected during the Phase I efforts. These wells will be permitted as North Dakota Administrative Code Underground Injection Control Class II wells and will yield additional characterization data which will further refine the FIP in Phase II. An array of surface and downhole monitoring techniques will validate ARM performance against predictive simulation results. Infrastructure will be constructed to manage extracted fluids at the surface and provide brine to a treatment test bed facility. Treatment of extracted brine can provide a means of reducing extracted brine disposal volumes, an alternate source of water, and/or salable products for beneficial use. A test bed facility will be constructed to provide a means of demonstrating these technologies on a wide range of brine concentrations. Screening criteria based on a techno-economic and life cycle assessment were developed to select high-salinity brine treatment technologies for extended duration treatment (30–60 days) in Phase II. A detailed cost assessment determined total implementation costs for BEST of $19,901,065 million (DOE share $15,680,505). These costs are inclusive of all necessary equipment, infrastructure construction, operations and project closeout costs required to implement BEST. An ideal combination of key factors makes the Johnsons Corner site uniquely suited to be the BEST demonstration.

10 SYNTHETIC FUELS↗

Technology Implementation Plan: Irradiation Testing and Qualification for Nuclear Thermal Propulsion Fuel

This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examination facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Department of Energy Savannah River Operations Office Savannah River National Laboratory Unmanned Aircraft System Aviation Implementation Plan

The Department of Energy Savannah River Operations Office Savannah River National Laboratory Unmanned Aircraft System Aviation Implementation Plan was written to provide guidance for the safe, efficient, and lawful operation of the SRNL small Unmanned Aircraft System (sUAS) Program. It shall be the intent of every sUAS remote pilot in command to make reasonable effort not to invade a person's reasonable expectation of privacy when operating the sUAS. SRS sUAS operations will be conducted in accordance all applicable Federal Aviation Administration (FAA), Department of Energy (DOE), and DOE-Savannah River Operations Office (DOE-SR) regulations, policies and procedures. All sUAS operations will be conducted in accordance with the applicable FAA issued DOE Certificate of Authorization (COA) and be approved by the applicable DOE-SR Flight Readiness Review Board (FRRB). The scope of this document is limited to remote pilots in command of sUAS's in support of the DOE, DOE-SR, or SRS missions, research & development (R&D) and national security strategic initiatives supported by SRNL, and other approved missions as required in the US National Airspace (NAS) as defined by the FAA.

99 GENERAL AND MISCELLANEOUS↗

DC Solar for All: Implementation Plan to Scale Low- and Moderate- Income Community Solar + Storage Resilience Hubs in the District of Columbia

This implementation plan discusses the District of Columbia's strategy to combine low-income community solar projects with resilience technologies. Through the technical and financial support offered by the Inclusive Shared Solar Initiative and building on extensive stakeholder engagement in LMI neighborhoods around the District, the District of Columbia team expects to reduce energy burdens for LMI residents, address barriers to and streamline SfA program enrollment, and support the development of innovative benefit delivery models, including a community solar-supported climate resilience center.

14 SOLAR ENERGY↗

Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-V Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.

54 ENVIRONMENTAL SCIENCES↗

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: “Centralia Nuclear Security Support Centre Strategy Implementation Plan”

[This is part of a hypothetical scenario-based exercise for workshop participants, based on the fictitious country "Centralia."] In prior years, as a part of efforts to strengthen and better sustain nuclear security within the State, Centralia requested through the Integrated Nuclear Security Support Plan (INSSP) framework that the International Atomic Energy Agency (IAEA) conduct an expert mission on establishing and operating a national nuclear security support centre (NSSC). After the IAEA conducted the NSSC expert mission, members of the Centralia Committee on Nuclear Security (CNS) agreed to initiate the feasibility determination phase of establishing an NSSC, in line with the systematic process recommended by the IAEA. Centralia Nuclear Regulatory Authority (CNRA), as the designated lead organization for coordinating the feasibility determination process, prepared a Feasibility Report in collaboration with members of the CNS and based on input gathered among relevant national stakeholders. The report was presented to the National Security Advisor (NSA), who reviewed and approved the proposal for Centralia to proceed with establishing an NSSC. After Centralia moved into the planning phase for the Centralia Nuclear Security Support Centre (CNSSC), per REF, the primary stakeholders of the centre jointly developed this strategy implementation plan, which provides an outline of the organizational structure, needs analysis, programme objectives, financial and project management, risk management, and other key aspects of the centre. This document will be reviewed and updated as necessary on a semi-annual basis during the project implementation period of establishing CNSSC.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Material Protection, Accounting and Control Technologies (MPACT) Implementation Plan: Lab-Scale Demonstration of Advanced Safeguard and Security Systems

The Materials Protection, Accounting, and Control Technologies (MPACT) campaign is working towards the goal of developing and demonstrating the next generation of nuclear materials management for the peaceful use of civilian nuclear energy. A major milestone of the campaign is the “Lab-scale demonstration of an advanced safeguards and security system,” due in 2020. This implementation plan describes how tools developed in the MPACT campaign will be used to meet this milestone. These tools consist of instrumentation and devices as well as computer software for modelling, simulation and integration of data and information for safeguard and security analysis. The plan is focused on demonstrating an advanced safeguard and security systems for electrochemical processing plants, but also identifies activities needed to address advanced reactor, aqueous processing and other advanced fuel cycle facilities. A key component to achieving the 2020 milestone is the development of a virtual distributed test bed that incorporates the instruments, data, analysis tools, and models currently under development and provides a framework to link and normalize the data in a way that simulates a facility, including uncertainty quantification. This virtual distributed test bed will integrate computer simulated facilities that make up a fuel cycle of interest, with distributed test beds located in actual operating facilities and laboratories. The MPACT campaign recently issued roadmaps for both Modelling & Simulation and Advanced Integration which address this component, and activities necessary to achieve the 2020 milestone. Research, development and testing of specific technologies have been supported by the MPACT campaign in coordination with other DOE-NE and DOE-NNSA programs. These technologies provide the essential data needed by the safeguard and security systems, and feed into the data analysis and facility models. This plan will identify these technologies, their current status and activities needed to demonstrate the technologies at the laboratory scale. Wherever possible, test of technologies in field conditions using suitable nuclear materials will be used to define performance. Where necessary, surrogate materials and/or simulation will be used to provide useful information for the demonstration. When completed, the 2020 milestone will provide a demonstration of advanced safeguard and security technologies, including advanced modelling, simulation and analysis approaches, applied to electrochemical processing. It will also identify applications of the technology and approaches in other advanced fuel cycle and reactor concepts.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Advanced Simulation and Computing FY18 Implementation Plan, Rev. 0

The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY18. The Initial IP effective October 1, 2017, should be consistent with: 1) the Department’s Base Table when operating under a Continuing Resolution (CR); and 2) the final signed appropriation or full-year CR once enacted.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing FY19 Implementation Plan, Rev. 1

The capabilities that the ASC Program provides at the national laboratories play a vital role in the Nuclear Security Enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY19. The Initial IP, effective August 8, 2018, should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective date TBD, is consistent with the final, enacted appropriation.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing FY18 Implementation Plan, Rev. 1

The capabilities that the ASC Program provides at the national laboratories play a vital role in the Nuclear Security Enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY18. The Initial IP effective October 1, 2017, should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective March 24, 2018, is consistent with the final, enacted appropriation.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing FY19 Implementation Plan, Rev. 0

The ASC Program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Directed Stockpile Work (DSW) and major modernization programs also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these lifetime extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY19. The Initial IP, effective August 8, 2018, should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective date TBD, is consistent with the final, enacted appropriation.

97 MATHEMATICS AND COMPUTING↗

Advanced Simulation and Computing (FY22 Implementation Plan Rev 0)

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) Program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent. Specific work activities and scope contained in this Implementation Plan (IP) represent the full-year annual operating plan for FY22. The Initial IP, effective , should be consistent with the Department’s Base Table when operating under a Continuing Resolution (CR). The final IP, effective date TBD, is consistent with the final, enacted appropriation.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

NSUF CoMET Project, Implementation Plan FY2019

The Combined Materials and Experiment Toolkit (CoMET) is an NSUF information management resource designed to give users access to the information and tools necessary for designing meaningful experiments and writing clear, structured proposals. NSUF has a milestone to deploy an experiment design expert system to the NSUF website to support applications for the FY2020 CINR, due on August 30, 2019. To meet this milestone, the CoMET project work for FY2019 focuses on three main objectives: 1.) Integrate the three NSUF web applications by linking data fields in one application with the data found in the others. The NSUF web applications are: The Rapid Turnaround Experiment (RTE) Proposal Solicitation system, the Nuclear Fuels and Materials Library (NFML) and the Nuclear Energy Infrastructure Database (NEID) and the researcher and technical staff account and profile management systems. 2.) Build an Experiment Design Wizard (expert system) that will guide users through the process of writing a statement of work for a CINR or RTE experiment. 3.) Build an Irradiation Effects Calculator to help a PI choose the best neutron irradiation facility for their needs, estimate the time needed to achieve their goals, and estimate the resulting radioactivity of their samples, post-irradiation. These objectives are designed to support the mission of the NSUF and optimize the experiment design portion of the proposal processes. The new researcher database will make finding collaborators easier. The wizard will provide the PI with early NSUF expertise so that their proposed experiments, at the “Letter of Intent” and “Pre-Application” stages are better designed to work within the available NSUF facilities. Utilization of these tools should reduce the proportion of proposals that are judged to be infeasible or “not ready” for NSUF access. It should also improve the efficiency of the NSUF technical leads since the PI will be starting with a better statement of work for the project. The tools will also provide resources for NSUF staff to more efficiently screen and score incoming proposals. This implementation plan will layout the work breakdown structure, activities, resources required, and plan for completion of the activities for CoMET in FY2019.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical information is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

TCCSP Project Implementation Plan

The TCCSP CarbonSAFE Phase II efforts focused on developing the technical, community, and economic foundation for a commercial-scale regional geologic storage complex for CO 2 captured. TCCSP has conducted a thorough evaluation of the regional, local, and site-specific geology, legacy well infrastructure, injection site design, and project planning as part of the CarbonSAFE Phase II TCCSP. Specially, the work performed under the CarbonSAFE Phase II has significantly furthered the advancement towards the commerciality of the TCCSP storage complex by delivering on the following objectives: Objective 1: Acquire site-specific characterization data to validate carbon dioxide (CO 2 ) storage estimates of reservoir units and the competency of confining layers in the region to prevent CO 2 leakage to develop a commercial-scale CO 2 project. Objective 2: Assess technical, economic, regulatory, and stakeholder aspects of the TCCSP.

54 ENVIRONMENTAL SCIENCES↗

LLNL DOE Order 420.2 D Implementation Plan

This plan will serve as the basis for the ongoing implementation of DOE O 420.2D to contractor requirements applicable to the use of Radiation Generating Devices (RGDs) at Lawrence Livermore National Laboratory (LLNL).

61 RADIATION PROTECTION AND DOSIMETRY↗