Search NASASearch

SEARCH · Search NASA

Results for “Infrastructure deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Infrastructure for deployment of power systems

A preliminary effort in characterizing the types of stationary lunar power systems which may be considered for emplacement on the lunar surface from the proposed initial 100-kW unit in 2003 to later units ranging in power from 25 to 825 kW is presented. Associated with these power systems are their related infrastructure hardware including: (1) electrical cable, wiring, switchgear, and converters; (2) deployable radiator panels; (3) deployable photovoltaic (PV) panels; (4) heat transfer fluid piping and connection joints; (5) power system instrumentation and control equipment; and (6) interface hardware between lunar surface construction/maintenance equipment and power system. This report: (1) presents estimates of the mass and volumes associated with these power systems and their related infrastructure hardware; (2) provides task breakdown description for emplacing this equipment; (3) gives estimated heat, forces, torques, and alignment tolerances for equipment assembly; and (4) provides other important equipment/machinery requirements where applicable. Packaging options for this equipment will be discussed along with necessary site preparation requirements. Design and analysis issues associated with the final emplacement of this power system hardware are also described.

Sprouse, Kenneth M.

On Applications of Disruption Tolerant Networking to Optical Networking in Space

The integration of optical communication links into space networks via Disruption Tolerant Networking (DTN) is a largely unexplored area of research. Building on successful foundational work accomplished at JPL, we discuss a multi-hop multi-path network featuring optical links. The experimental test bed is constructed at the NASA Glenn Research Center featuring multiple Ethernet-to-fiber converters coupled with free space optical (FSO) communication channels. The test bed architecture models communication paths from deployed Mars assets to the deep space network (DSN) and finally to the mission operations center (MOC). Reliable versus unreliable communication methods are investigated and discussed; including reliable transport protocols, custody transfer, and fragmentation. Potential commercial applications may include an optical communications infrastructure deployment to support developing nations and remote areas, which are unburdened with supporting an existing heritage means of telecommunications. Narrow laser beam widths and control of polarization states offer inherent physical layer security benefits with optical communications over RF solutions. This paper explores whether or not DTN is appropriate for space-based optical networks, optimal payload sizes, reliability, and a discussion on security.

Hylton, Alan Guy

Continuously Connected With Mobile IP

Cisco Systems developed Cisco Mobile Networks, making IP devices mobile. With this innovation, a Cisco router and its connected IP devices can roam across network boundaries and connection types. Because a mobile user is able to keep the same IP address while roaming, a live IP connection can be maintained without interruption. Glenn Research Center jointly tested the technology with Cisco, and is working to use it on low-earth-orbiting research craft. With Cisco's Mobile Networks functionality now available in Cisco IOS Software release 12.2(4)T, the commercial advantages and benefits are numerous. The technology can be applied to public safety, military/homeland security, emergency management services, railroad and shipping systems, and the automotive industry. It will allow ambulances, police, firemen, and the U.S. Coast Guard to stay connected to their networks while on the move. In the wireless battlefield, the technology will provide rapid infrastructure deployment for U.S. national defense. Airline, train, and cruise passengers utilizing Cisco Mobile Networks can fly all around the world with a continuous Internet connection. Cisco IOS(R) Software is a registered trademark of Cisco Systems.

Source record

Mars Conjunction Crewed Missions With a Reusable Hybrid Architecture

A new crew Mars architecture has been developed that provides many potential benefits for NASA-led human Mars moons and surface missions beginning in the 2030s or 2040s. By using both chemical and electric propulsion systems where they are most beneficial and maintaining as much orbital energy as possible, the Hybrid spaceship that carries crew round trip to Mars is pre-integrated before launch and can be delivered to orbit by a single launch. After check-out on the way to cis-lunar space, it is refueled and can travel round trip to Mars in less than 1100 days, with a minimum of 300 days in Mars vicinity (opportunity dependent). The entire spaceship is recaptured into cis-lunar space and can be reused. The spaceship consists of a habitat for 4 crew attached to the Hybrid propulsion stage which uses long duration electric and chemical in-space propulsion technologies that are in use today. The hybrid architecture's con-ops has no in-space assembly of the crew transfer vehicle and requires only rendezvous of crew in a highly elliptical Earth orbit for arrival at and departure from the spaceship. The crew transfer vehicle does not travel to Mars so it only needs be able to last in space for weeks and re-enter at lunar velocities. The spaceship can be refueled and resupplied for multiple trips to Mars (every other opportunity). The hybrid propulsion stage for crewed transits can also be utilized for cargo delivery to Mars every other opportunity in a reusable manner to pre-deploy infrastructure required for Mars vicinity operations. Finally, the Hybrid architecture provides evolution options for mitigating key long-duration space exploration risks, including crew microgravity and radiation exposure.

Merrill, Raymond G.

Earth Observations to Assess Impact of Hurricane Katrina on John C. Stennis Space Center

The peril from hurricanes to Space Operations Centers is real and is forecast to continue; Katrina, Rita, and Wilma of 2005 and Charley, Frances, Ivan, and Jeanne of 2004 are sufficient motivation for NASA to develop a multi-Center plan for preparedness and response. As was demonstrated at SSC (Stennis Space Center) in response to Hurricane Katrina, NASA Centers are efficiently activated as local command centers, playing host to Federal and State agencies and first responders to coordinate and provide evacuation, relocation, response, and recovery activities. Remote sensing decision support provides critical insight for managing NASA infrastructure and for assisting Center decision makers. Managers require geospatial information to manage the federal city. Immediately following Katrina, SSC s power and network connections were disabled, hardware was inoperative, technical staff was displaced and/or out of contact, and graphical decision support tools were non-existent or less than fully effective. Despite this circumstance, SSC EOC (Emergency Operations Center) implemented response operations to assess damage and to activate recovery plans. To assist Center Managers, the NASA ASP (Applied Sciences Program) made its archive of high-resolution data over the site available. In the weeks and months after the immediate crisis, NASA supplemented this data with high-resolution, post-Katrina imagery over SSC and much of the affected coastal areas. Much of the high-resolution imagery was made available through the Department of Defense Clear View contract and was distributed through U.S. Geological Survey Center for Earth Resources Observation and Science "Hurricane Katrina Disaster Response" Web site. By integrating multiple image data types with other information sources, ASP applied an all-source solutions approach to develop decision support tools that enabled managers to respond to critical issues, such as expedient access to infrastructure and deployment of resources, provision of temporary shelter, logistical control of critical supplies, and the mobilization and coordination of assets from ground crews to aircraft/airspace management. Furthermore, ASP developed information products that illustrate risks to SSC's infrastructure from surge, inundation, and flood. Current plans include developing wind-risk prototype products for refinement and adoption into EOC plans.

Graham, William D.

Use NASA Earthdata in the Cloud

With the impending arrival of new, high-data-volume Earth observation missions, NASA’s ability to effectively ingest, process, and archive large amounts of data requires the most cost-effective, flexible, and scalable data-management architectures and technologies. To meet these demands, NASA's Earth Science Data Systems (ESDS) Program is implementing a strategic vision to develop and operate multiple components of NASA's Earth Observing System Data and Information System (EOSDIS) in a commercial cloud environment. As more earth observing data is moved into the cloud, NASA EOSDIS wants to share our reasoning for moving data into the commercial cloud, as well as demonstrate how end-users can take advantage of both data in the cloud and cloud-deployed services. This presentation explains the enterprise reasons for moving data into the cloud, specifically the scalability of cloud systems, the flexibility to pivot to the most optimal language/system/architecture, and the reduced redundancy of a common architecture. Then we primarily focus on the user-driven reasons for moving to the cloud. Equal access to high performance computing helps all parties, especially users that don't have access to their own on-premise computing infrastructure. Rapid deployment allows users to spin up their own systems without needing the extensive platform previously required for large scale development. Cost effectiveness allows users a wide breadth of computing options, from super computer ability to small scale development, which can help underserved communities. Finally we link to internal resources that users can utilize to begin their cloud based development journey without having to be an expert in the field.

Nicholas Doty

Materials Challenges in Space Exploration

United States civil space program administered by National Aeronautics and Space Administration has a new strategic direction to explore the solar system. This new 'vision for space exploration' encompasses a broad range of human and robotic missions, including the Moon. Mars and destinations beyond. These missions require advanced systems and capabilities that will accelerate the development of many critical technologies, including advanced materials and structural concepts. Specifically, it is planned to develop high-performance materials for vehicle structures, propulsion systems, and space suits; structural concepts for modular assembly for space infrastructure: lightweight deployable and inflatable structures for large space systems and crew habitats; and highly integrated structural systems and advanced thermal management systems for reducing launch mass and volume. This paper will present several materials challenges in advanced space systems-high performance structural and thermal materials, space durable materials, radiation protection materials, and nano-structural materials. Finally, the paper will take a look at the possibility of utilizing materials in situ, i.e., processing materials on the surface of the Moon and Mars.

Bhat, Biliyar N.

Materials Challenges in Space Exploration

United States civil space program administered by National Aeronautics and Space Administration (NASA) has a new strategic direction to explore the solar system. This new 'vision for space exploration' encompasses a broad range of human and robotic missions, including the Moon, Mars and destinations beyond. These missions require advanced systems and capabilities that will accelerate the development of many critical technologies, including advanced materials and structural concepts. Specifically, it is planned to develop high-peformance materials for vehicle structures, propulsion systems, and space suits; structural concepts for modular assembly for space infrastructure; lightweight deployable and inflatable structures for large space systems and crew habitats; and highly integrated structural systems and advanced thermal management systems for reducing launch mass and volume. This paper will present several materials challenges in advanced space systems-high performance structural and thermal materials, space durable materials, radiation protection materials, and nano- structural materials. The paper will also address smart materials and structures and examine space environmental effects on materials and methods of mitigating them. Finally, the paper will take a look at the possibility of utilizing materials in situ, i.e., processing and using desired materials on the surface of the Moon and Mars.

Bhat, Biliyar N.

Enhanced Multi-Modal Access to Planetary Exploration

Tomorrow's Interplanetary Network (IPN) will evolve from JPL's Deep-Space Network (DSN) and provide key capabilities to future investigators, such as simplified acquisition of higher-quality science at remote sites and enriched access to these sites. These capabilities could also be used to foster public interest, e.g., by making it possible for students to explore these environments personally, eventually perhaps interacting with a virtual world whose models could be populated by data obtained continuously from the IPN. Our paper looks at JPL's approach to making this evolution happen, starting from improved communications. Evolving space protocols (e.g., today's CCSDS proximity and file-transfer protocols) will provide the underpinning of such communications in the next decades, just as today's rich web was enabled by progress in Internet Protocols starting from the early 1970's (ARPAnet research). A key architectural thrust of this effort is to deploy persistent infrastructure incrementally, using a layered service model, where later higher-layer capabilities (such as adaptive science planning) are enabled by earlier lower-layer services (such as automated routing of object-based messages). In practice, there is also a mind shift needed from an engineering culture raised on point-to-point single-function communications (command uplink, telemetry downlink), to one in which assets are only indirectly accessed, via well-defined interfaces. We are aiming to foster a 'community of access' both among space assets and the humans who control them. This enables appropriate (perhaps eventually optimized) sharing of services and resources to the greater benefit of all participants. We envision such usage to be as automated in the future as using a cell phone is today - with all the steps in creating the real-time link being automated.

interplanetary network (IPN)

The Application of Advanced Electric Propulsion on the NASA Power and Propulsion Element (PPE)

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon by 2024. To meet this challenge, NASA's Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA's Power and Propulsion Element (PPE), the first planned element of NASA's cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to demonstrate a 2,500 kg xenon capacity, 50 kW-class SEP spacecraft that meets Gateway's needs, aligns with industry's heritage spacecraft buses, and allows extensibility for NASA's Mars exploration goals. Maxar's PPE concept design, is based directly on their high heritage, modular, highly reliable 1300-series bus architecture. The electric propulsion system features two 13 kW Advanced Electric Propulsion (AEPS) strings from Aerojet Rocketdyne and a Maxar-developed system comprised of four Busek 6 kW Hall-effect thrusters mounted in pairs on large range of motion pointing arms with four 6 kW-class, SPT-140-based PPUs. NASA is continuing to develop the 13 kW AEPS system through a contract with Aerojet Rocketdyne. In addition to the flight demonstration of an advanced electric propulsion system on PPE, a government-furnished plasma diagnostics package is planned to assess on-orbit performance characteristics and vehicle interactions. The paper will present overviews of NASA's Gateway and the PPE Project, the Maxar ion propulsion subsystem, the status of the two electric propulsion system developments, and the implementation of the plasma diagnostics package on the Maxar PPE spacecraft. The project is currently heading into SRR, with the propulsion build scheduled for 2021, and launch in 2022.

Herman, Daniel A.

Names Don't Fly: Smart Filters for Profanity Detection and Classification in User-Generated Content

Generally, names associate with a person’s identity. But what if in the pretext of a legitimate name and given the opportunity, users of software provide names to online web forms that carry along offensive language, slurs, and other profanity that is then sent to Mars ? The answer is simple: they don’t fly. In this paper,we perform model explorations to detect and classify inappropriate content in the names submitted from people across the world to ‘Send Your Names to MARS’ public engagement campaign.We propose a novel pipeline approach, that can effectively overcome the issues of lack of negative samples, noisy labels by gathering expert knowledge over time with human(s) in the loop and data augmentation, and achieve high accuracy in classifying inappropriate names with very little or no context. We describe cloud-based infrastructure to deploy our application and run predictions on large-scale data through our pipeline and achieve significant speedup over offline processes, with enhanced reliability and security.

Soderstrom, Tomas

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion

Development and Qualification Status of the Electric Propulsion Systems for the NASA PPE Mission and Gateway Program

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon and establishing sustainable lunar exploration by the end of the decade. To meet this challenge, NASA’s Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA’s Power and Propulsion Element (PPE), the first planned element of NASA’s cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to provide a 50 kW-class SEP spacecraft that meets Gateway’s needs, aligns with industry’s heritage spacecraft buses, and allows extensibility for NASA’s Mars exploration goals. Maxar’s PPE concept design, is based on their high heritage, modular, and highly reliable 1300-series bus architecture. The electric propulsion system features three 12 kW Advanced Electric Propulsion (AEPS) thrusters from Aerojet Rocketdyne and four BHT-6000 thrusters from Busek. Maxar-provided power electronics and xenon flow controllers from Moog are utilized in both the 12kW and 6kW electric propulsion strings on the spacecraft. The paper will present overviews of NASA’s Gateway and the PPE Project, status of the development and qualification activities for the two electric propulsion system, and the planned implementation of PPE electric propulsion system as keystone of NASA’s Gateway. The PPE spacecraft is currently heading into the Critical Design Review, with the qualification and flight electric propulsion hardware fabrication already initiated and significant progress being made toward planned qualifications in support of the planned PPE spacecraft co-manifest launch in 2024.

Electric Propulsion

The Space Superhighway: Enabling Active Debris Remediation Through an In-Space Logistics Infrastructure

The Space Superhighway is a future space infrastructure concept intended to support civil, commercial, and national security space interests by providing In-Space Servicing, Assembly, and Manufacturing (ISAM) services across low Earth orbit (LEO), geosynchronous orbit (GEO), and cislunar space. This concept was originally developed by an interagency working group and commissioned by the Executive Office of the President. The Space Superhighway is comprised of three primary components: regional hubs, a sustainable transportation network, and Earth-to-orbit logistics. This study establishes methods which may be used to quantify the cost-savings from use of the Space Superhighway infrastructure and interrogates the effects of the use of this logistics network on a specific use case – removal of 26 pieces of large space debris within LEO. Through application of the established methods and assuming an emplaced Space Superhighway infrastructure with no cost implications related to deployment of infrastructure-related spacecraft, this study found that the cost to use an established Space Superhighway infrastructure to remove the targeted debris may be cheaper than removal of the targeted debris through traditional methods when the ΔV between a regional hub hosting propellant and the debris field is less than 1500 m/s. Through determining optimized locations of regional hubs within LEO, this study estimates that such a ΔV is within expectations for a LEO environment supported by a fully evolved Space Superhighway logistics infrastructure. This study provides a blueprint for future Space Superhighway value proposition studies for other use cases which, when combined, may provide the ultimate benefit and justification for the proliferation of an interconnected Space Superhighway.

Space Superhighway

The Space Superhighway: Enabling Active Debris Remediation Through an In-Space Logistics Infrastructure

The Space Superhighway is a future space infrastructure concept intended to support civil, commercial, and national security space interests by providing In-Space Servicing, Assembly, and Manufacturing (ISAM) services across low Earth orbit (LEO), geosynchronous orbit (GEO), and cislunar space. This concept was originally developed by an interagency working group and commissioned by the Executive Office of the President. The Space Superhighway is comprised of three primary components: regional hubs, a sustainable transportation network, and Earth-to-orbit logistics. This study establishes methods which may be used to quantify the cost-savings from use of the Space Superhighway infrastructure and interrogates the effects of the use of this logistics network on a specific use case – removal of 26 pieces of large space debris within LEO. Through application of the established methods and assuming an emplaced Space Superhighway infrastructure with no cost implications related to deployment of infrastructure-related spacecraft, this study found that the cost to use an established Space Superhighway infrastructure to remove the targeted debris may be cheaper than removal of the targeted debris through traditional methods when the ΔV between a regional hub hosting propellant and the debris field is less than 1500 m/s. Through determining optimized locations of regional hubs within LEO, this study estimates that such a ΔV is within expectations for a LEO environment supported by a fully evolved Space Superhighway logistics infrastructure. This study provides a blueprint for future Space Superhighway value proposition studies for other use cases which, when combined, may provide the ultimate benefit and justification for the proliferation of an interconnected Space Superhighway.

Space Superhighway

A Sustained Proximity Network for Multi-Mission Lunar Exploration

Tbe Vision for Space Exploration calls for an aggressive sequence of robotic missions beginning in 2008 to prepare for a human return to the Moon by 2020, with the goal of establishing a sustained human presence beyond low Earth orbit. A key enabler of exploration is reliable, available communication and navigation capabilities to support both human and robotic missions. An adaptable, sustainable communication and navigation architecture has been developed by Goddard Space Flight Center and the Jet Propulsion Laboratory to support human and robotic lunar exploration through the next two decades. A key component of the architecture is scalable deployment, with the infrastructure evolving as needs emerge, allowing NASA and its partner agencies to deploy an interoperable communication and navigation system in an evolutionary way, enabling cost effective, highly adaptable systems throughout the lunar exploration program.

Soloff, Jason A.

New Applications for the Testing and Visualization of Wireless Networks

Traditional techniques for examining wireless networks use physical link characteristics such as Signal-to-Noise (SNR) ratios to assess the performance of wireless networks. Such measurements may not be reliable indicators of available bandwidth. This work describes two new software applications developed at NASA Glenn Research Center for the investigation of wireless networks. GPSIPerf combines measurements of Transmission Control Protocol (TCP) throughput with Global Positioning System (GPS) coordinates to give users a map of wireless bandwidth for outdoor environments where a wireless infrastructure has been deployed. GPSIPerfView combines the data provided by GPSIPerf with high-resolution digital elevation maps (DEM) to help users visualize and assess the impact of elevation features on wireless networks in a given sample area. These applications were used to examine TCP throughput in several wireless network configurations at desert field sites near Hanksville, Utah during May of 2004. Use of GPSIPerf and GPSIPerfView provides a geographically referenced picture of the extent and deterioration of TCP throughput in tested wireless network configurations. GPSIPerf results from field-testing in Utah suggest that it can be useful in assessing other wireless network architectures, and may be useful to future human-robotic exploration missions.

Griffin, Robert I.