Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Installation of the Dark Energy Spectroscopic Instrument at the Mayall 4-meter telescope

The Dark Energy Spectroscopic Instrument (DESI) is a Stage IV ground-based dark energy experiment that will measure the expansion history of the Universe using the Baryon Acoustic Oscillation technique. The spectra of 35 million galaxies and quasars over 14000 square degrees will be measured during the life of the experiment. We describe the installation of the major elements of the instrument at the Mayall 4m telescope, completed in late 2019. The previous prime focus corrector, spider vanes, and upper rings were removed from the Mayall’s Serrurier truss and replaced with the newlyconstructed DESI ring, vanes, cage, hexapod, and optical corrector. The new corrector was optically aligned with the primary mirror using a laser tracker system. The DESI focal plane system was integrated to the corrector, with each of its ten 500-fiber-positioner petal segments installed using custom installation hardware and the laser tracker. Ten DESI spectrographs with 30 cryostats were installed in a newly assembled clean room in the Large Coude Room. The ten cables carrying 5000 optical fibers from the positioners in the focal plane were routed down the telescope through cable wraps at the declination and hour angle axes, and their integral slitheads were integrated with the ten spectrographs. The fiber view camera assembly was installed to the Mayall’s primary mirror cell. Servers for the instrument control system replaced existing computer equipment. The fully integrated instrument has been commissioned and is ready to start its operations phase.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Installation Quality Framework: Investment Return Approach for Energy Savings on Building Product Installation

A case study was conducted on 44 residential homes using both traditional house wrap and ZIP System systems to measure the overall airtightness and compare estimated energy usages. The labor, material, and overhead and profit (O&P) costs were analyzed and used to determine the optimal choice for long-term benefits in terms of cost and performance. The impact of insulation installation is considered a key factor in improving the strategy of reducing energy consumption. Improved installation practices can affect the airtightness of common wall assemblies to reduce the building energy performance gaps and provide insight on how to allocate resources better. A framework was developed to analyze operational costs and building energy performance to address how installation quality is a factor in the return of investment in building construction for heating and cooling systems within the thermal envelope. With this methodology, aggressive energy performance goals will be met while balancing the tradeoff between installation techniques and building systems efficiency based on the introduced probabilistic investment return (PIR) metric.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Installation and commissioning of the ion source systems for the new spallation neutron source 2.5 MeV injector

The U.S. Spallation Neutron Source (SNS) is a state-of-the-art neutron scattering facility delivering the world’s most intense pulsed neutron beams to a wide array of instruments, which are used to conduct investigations in many fields of engineering, physics, chemistry, material science, and biology. Neutrons are produced by spallation of liquid Hg by the bombardment of short (∼1 µs), intense (∼35 A) pulses of protons delivered at 60 Hz by an accumulator ring which is fed by a high-intensity, 1 GeV, H− LINAC (linear accelerator). This facility has operated nearly continuously since 2006 but has recently undergone a 4-month maintenance period, which featured a complete replacement of the 2.5 MeV injector feeding the LINAC. The new injector was developed at ORNL in an off-line beam test facility and consists of an ion source, low energy beam transport, and a Radio Frequency Quadrupole (RFQ). This report first describes the installed configuration of the new injector detailing the ion source system. The first beam current, RFQ transmission, emittance, and energy measurements from the injector installed on the SNS are reported. These data not only show a significant performance improvement for our existing facility but will also make accessible the higher beam current requirements for future SNS upgrade projects: the proton power upgrade and second target station.

Welton, R. F.↗

Flight Comparison of Performance and Cooling Characteristics of Exhaust-Ejector Installation with Exhaust-Collector-Ring Installation

Flight and ground investigations have been made to compare an exhaust-ejector installation with a standard exhaust-collector-ring installation on air-cooled aircraft engines in a twin-engine airplane. The ground investigation allowed that, whereas the standard engine would have overheated above 600 horsepower, the engine with exhaust ejectors cooled at take-off operating conditions at zero ram. The exhaust ejectors provided as much cooling with cowl flaps closed as the conventional cowl flaps induced when full open at low airspeeds. The propulsive thrust of the exhaust-ejector installation was calculated to be slightly less than the thrust of the collector-ring-installation.

Acker, Loren W.↗

Group anchor system, subsea installation system, method for using and installing same

Disclosed herein are a group anchor system, subsea installation tool and method of install such group anchor systems. The group anchor system includes a template through which a plurality of vertical piles, such as helical piles, are passed, drilled into the seabed at one end and secured to the template at the other to provide a mooring anchor for an offshore asset. The installation tool is a modular tool designed to mate with the group anchor system. Each module including drive mechanism for engaging and driving a pile. The piles may be driven simultaneously, individually, or in groups as required for proper placement and leveling. Methods of using the installation tool are also disclosed.

Miller, Zachary↗

Flight investigation of installation effects on a wedge nozzle installed on an underwing nacelle

A flight research program was conducted using a modified F-106B aircraft with an underwing-nacelle - engine installation to investigate installation effects on a wedge nozzle with retracted shrouds from Mach 0.70 to 1.10. These configurations simulated the subsonic flight geometries of a variable-geometry wedge nozzle design for Mach 2.70 operation. The nozzle was tested with a J85-GE-13 turbojet engine, and data were compared with that of 0.34-scale isolated wind tunnel model. Data are also compared with the flight results of a boattail plug nozzle and a cylindrical nacelle plug nozzle. A favorable installation effect occurred from Mach 0.82 to 0.96 with a nominal 4-percent corrected secondary weight-flow ratio. This favorable effect resulted from changes in pressure forces on the nozzle surfaces. The wedge nozzle gross thrust coefficient was about the same as the boattail nacelle plug nozzle and 2.50 to 1.30 percent higher than the cylindrical nacelle plug nozzle over the subsonic Mach number range.

Johns, A. L.↗

Knowledge spillovers between PV installers can reduce the cost of installing solar PV

We analyze pricing in PV systems using data from 2008-2014 to identify the effects of knowledge spillovers in reducing the installed cost of PV. This paper estimates the size of the effects of learning by doing and knowledge spillovers using multiple formulations of spillover related variables. We found knowledge spillovers between firms within a county to be a significant and substantial factor in reducing the costs of PV. However, these spillovers reduce costs only for firms over a certain size threshold, and no cost-reducing spillovers were found for smaller installers. Geographic spillovers, within a firm from one county to another were also significant although not as large as the local between-firm effects. We ran 43 specifications on the data and generally found these main results to be robust, although not in every specification. One implication of these results is that policies that subsidize demand for PV are leading to the creation of new knowledge that would not exist at lower levels of demand. Furthermore, that the spillovers become stronger at higher levels of experience suggests that these subsidies would need to be substantial, particularly in new markets with many small firms.

14 SOLAR ENERGY↗

Pre-commissioning of the wide-dynamic range halo monitor to be installed in the Fermilab MI-8 line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, initial testing of equipment, and ray tracing simulations for the Offner optics and the targets used in the monitor.

Babacan, Betiay [IIT, Chicago; Fermilab]↗

Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

Source record↗

The Effect of Photovoltaic Module Efficiency on Installed System Costs and Markets in Residential Rooftop Installations in the United States

In this report, we analyze how efficiencies influence residential PV system installed system costs and break-even module prices using a bottom-up cost model. We show that the cost savings associated with efficiency are much higher for area-constrained rooftop than those which are usage-constrained. We also show that simplified models of how efficiency impacts costs overestimate the value of efficiency compared to bottom-up models, particularly for usage-constrained scenarios. We also estimate the fraction of area-constrained residential rooftops in the United States today and explore how that fraction could change in future scenarios with high levels of electrification.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flight investigation of installation effects on a plug nozzle with a series of boattailed primary shrouds installed on an underwing nacelle

Several variations of a boattailed shroud for a 10 deg conical plug nozzle were tested using an F-106B aircraft for Mach 0.6 to 1.3. The data were obtained so that the tradeoff between boattail and plug size could be studied for an underwing nacelle location. The nozzles were tested with J85-GE-13 turbojet engine, and the data were compared to previous flight results of installed plug nozzles. Boattail area varied from 31 to 66 percent of the nacelle area. The effect of increasing projected boattail area was to increase the gross thrust coefficient in the same way as from isolated data for flight Mach numbers below 0.85. The highest gross thrust coefficient (0.958) was obtained at Mach 0.95 with a long circular arc shroud configuration with a very small amount of secondary air flow.

Head, V. L.↗

Observations and Lessons Learned From Installing Residential Roofing-Integrated Photovoltaics

Building-sited solar photovoltaics (PV) could play a key role in decarbonizing the building sector either through racked and mounted PV or through Building-integrated PV (BIPV). BIPV is installed into the building envelope itself, with solar cells and/or modules forming the outer layer of a building structure, thus transforming a single-purpose structure into one that serves the dual purposes of the building envelope and electricity. BIPV can be applied to building roofs, facades, awnings, pergolas, windows, skylights, balustrades, and other external surfaces. Given BIPV products vary widely, the focus of this research is residential roofing integrated PV (RIPV), where solar is incorporated into or otherwise replaces the roofing material. Previous research suggests that residential RIPV could reduce customer acquisition, labor, supply chain, and equipment costs. These products have yet to realize these cost savings and deployment remains significantly less than conventional rooftop PV as a relative share of the addressable market in the US. One potential barrier to broader residential roofing integrated PV deployment may be higher costs relative to conventional rooftop PV, primarily because the design and installation of these products is still evolving. Here, we explore residential RIPV cost-reduction opportunities by analyzing installation processes. Our study documents residential RIPV installations at 2 reroofing sites and the equivalent of 9 new construction sites in California through a methodology known as time and motion study. We also conducted interviews with subject-matter experts to identify barriers and solutions to maximize these products' market penetration. Our time and motion study breaks the RIPV installation process into four steps: 1) staging, unloading, and roof preparation; 2) fire resistant underlayment(s) (synthetic material laid between roof shingles and roof deck); 3) flashings and PV installation; and 4) wiring and monitoring. We measure the time required for each step in terms of worker-hours, representing an hour of labor from a single worker. We further normalize process time by dividing worker-hours by kilowatt (kW) of system capacity. The most time-intensive step was flashings and PV installation, taking around 2.4 worker-hours per kW on average and accounting for around 60% of the process time for an average installation. The total installation process took on average about 6.4 and 3.5 worker-hours per kW at the reroofing sites and new construction sites, respectively. For comparison, a previous time and motion study documented a time of 6.9 worker-hours per kW for conventional rooftop PV. The shorter RIPV installation times are consistent with previous studies suggesting that RIPV could be installed faster than conventional rooftop PV. The time and motion results and feedback from interviewees provide insights into potential residential RIPV cost reduction opportunities. Several interviewees suggested that these products would be more efficient if PV installation was more fully integrated into the roofing/construction industries, which currently use separate supply chains and skillsets. Further integration could reduce supply chain delays and labor force redundancies. Future research could explore specific ways to integrate these industries to help realize the cost savings potential of RIPV.

14 SOLAR ENERGY↗

Installation Assignment Durations and Patterns of Army Personnel

The purpose of this document is to report on the development of personnel assignment duration statistical metrics and statistical descriptions for groups of Army personnel aggregated by rank, career management field, and other descriptors for 32 Continental United States (CONUS) Army installations. This information can be used for generating evidence-based measures of personnel exposure times associated with environmental health considerations at the installation and career management field levels. Assignment duration statistical descriptions were developed to provide temporal metrics for groups of personnel at Army installations as foundational data to support a variety of assessments. Statistical results of personnel assignment durations at the installation level are provided in several formats. The 50th percentile assignment duration represents the median number of days personnel in groups aggregated by rank and career management field spend at the 32 CONUS Army installations in this study. Likewise, other duration percentiles (90th) and quartiles of assignment durations for groups aggregated by rank and career management field spend at each installation were developed. Assignment path analysis provide statistical descriptions of assignment durations at Army installations throughout increments of time (e.g., 5 years, 10 years). Key groupings of assignment paths were achieved by analyzing the duration of assignments at installations in chronological order from entry throughout specified increments of military service to generate the most common assignment paths across the 32 CONUS Army installations in this study. The developed assignment duration analytics and duration statistical descriptions provide foundational temporal metrics for groups of personnel at 32 CONUS Army installations to support a variety of assessments including those by human resource planners and environmental health specialists.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Application of Manufacturing Quality Management Principles to PV System Installations

To help SETO/DOE achieve its goals, the IBTS team proposed a project addressing system reliability by improving installation standards and quality management. The proposed approach was designed to help achieve measurable reductions in installation defect density and improvements in the performance of PV systems by optimizing design and installation of residential and commercial PV systems. This approach addressed the soft costs associated with installations and quality management. The project demonstrated improved system reliability and reduced PV system installation costs. The software developed improved operations, decreased risk, and increased the overall value of PV systems across their lifecycle. The project used several data collection methods, including extensive industry surveys, face-to-face high-level interviews at industry conferences, stakeholder teleconferences, and in-depth interviews conducted by IBTS staff. Results from the research found the industry needs a uniform assessment method for national providers to be more efficient; the software should support both code officials and installers; most industry stakeholders would find value in a centralized software system that allows them to collect, report, and review information on in-process and completed solar installations; and mobile solutions that bridge existing knowledge gaps with inspectors and integrate with existing methodologies (such as permitting software) are of great value. The software solution developed is web-based, allowing for national access, and is built on a Google Firebase platform that can handle significant users and data. It can be used onsite or remotely, allowing for code compliance to continue despite ongoing pandemic related delays or shutdowns for local economies. The information provided by the software tool allows users to uniformly assess a system for compliance and use that aggregated data to identify training topics or create internal process designed to improving issues and reducing occurrence. This solution has multiple benefits in managing quality at time of use and promoting an increase in future safety and quality through education. Perhaps most importantly, this software increases public safety by ensuring compliance of installed systems and allows for local AHJs to remotely engage specialized and qualified solar specific expertise for oversite of the installation in their jurisdictions. Data analysis provides the quality feedback loop identifying the root cause of failure and drives installation practices to improve through training and education, resulting in systems with higher performance, greater reliability, and reduced operations and maintenance costs. With the successful completion of this project, the industry can expect reduced soft costs and increased performance and safety and will ultimately benefit from longer performing systems that cost less to operate.

14 SOLAR ENERGY↗

Optimization of prefabricated component installation using a real-time evaluator (RTE) connection locating system

Prefabrication promises to industrialize the construction industry. By constructing elements within a manufacturing environment, producers can better control quality and maximize production efficiency. Since the major adoption of prefabrication, a wide variety of prefabricated components have been produced for varying applications such as new construction and exterior wall retrofits. While the production processes of these prefabricated components have seen much innovation, the installation process has remained relatively unchanged for decades. To innovate the installation process with modern technologies, a real-time evaluator (RTE) has been developed to reduce the installation cost of prefabricated components by reducing installation time, decreasing rework, and improving accuracy. The RTE uses developed software solutions with off-the-shelf hardware to assist erectors in completing an installation by measuring the real-time positions of connections and prefabricated components, providing installation guidance through a graphical user interface, and monitoring the accumulated installation errors. An overview of the RTE and proposed workflow is presented. A connection locating system that guides users in expediting the installation of connections is introduced. Laboratory experiments were conducted to determine the accuracy improvement and time savings of the RTE in installing connections for prefabricated components. RTE enabled a time saving of up to 37% compared to traditional connection installation methods using handheld measurement tools.

Hayes, Nolan↗