Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integral solution”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Performance Demonstration of an Occupancy Sensor-enabled Integrated Solution for Commercial Buildings

Traditionally, a single-loop fixed-gain controller is applied to supply fan (SF) and cooling coil (CC) valve controls while a fixed-damper position control is applied to outdoor air (OA) damper control at air handling units (AHUs) in commercial buildings. With the increasing application of occupancy sensors, the information generated by occupancy sensors is applied to not only reduce the electricity loads from lighting and controllable plug loads, but also reset OA intake and minimum supply airflow setpoints. Meanwhile, these intermittent operation actions greatly elevate the dynamics of AHU systems, which may introduce unstable SF and CC valve operations and inaccurate OA flow control at AHUs and consequently degrade maximum energy efficiency gains. With virtual fan and valve flow meter technologies, two advanced controls, including cascade control and gain scheduling control, can be implemented on both the SF and CC valve, and an advanced control using a virtual OA flow meter can be implemented on OA damper integrated with occupancy sensors. The goal of this project is to demonstrate the savings, cost, and performance of an integrated solution that integrates the three advanced HVAC controls with occupancy sensors to allow accurate and stable AHU operations in real buildings. The project objectives are to: 1) develop and validate an advance SF control algorithm; 2) develop and validate an advanced CC valve control algorithm; 3) validate an algorithm to implement a virtual OA flow meter; and 4) demonstrate the savings, cost, and performance of the integrated solution in real buildings. The technical approaches are to: 1) select a test system at the University of Oklahoma; 2) develop and implement the algorithms of advanced SF and CC valve controls and validate the performance; 3) develop and implement the advanced OA control using a virtual OA flow meter and validate the performance; 4) demonstrate the savings, cost, and performance of the proposed integrated solution with and without three advanced HVAC controls; and 5) disseminate the project results through publications and presentations. For the SF control, both the gain scheduling and cascade controls can improve the fan energy performance by reducing the fan power during the transient period and the fan control performance at lower speeds by reducing fan speed variation. Moreover, the gain scheduling control provides a simple and low-cost solution and is recommended. The fan power savings can reach 30% in a transient period. For the CC valve control, the gain scheduling control can considerably reduce the supply air temperature oscillation range and frequency under both higher and lower load conditions and the control valve response is much more stable. As a result, the gain scheduling control is recommended. The projected pump energy consumption can be reduced by 68.5%. With the developed virtual OA flow meter, the OA can be accurately controlled at its setpoint, which is determined based on the actual number of occupants in the building provided by occupancy sensors. The RMSE of the proposed OA control is 15.9 L/s. The energy data shows that the fan power and CC cooling energy were significantly reduced. On the other hand, the energy savings majorly results from the occupancy sensors and the energy savings by the advanced HVAC controls is minimal because that the controllers in the test AHU were tuned with very slow response. An annual technical savings potential is estimated as 0.5 quads in the commercial sector.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Modernizing Distribution System Restoration to Achieve Grid Resiliency Against Extreme Weather Events: An Integrated Solution

Recent severe power outages caused by extreme weather hazards have highlighted the importance and urgency of improving the resilience of the electric power grid. As the distribution grids still remain vulnerable to natural disasters, the power industry has focused on methods of restoring distribution systems after disasters in an effective and quick manner. The current distribution system restoration practice for utilities is mainly based on predetermined priorities and tends to be inefficient and suboptimal, and the lack of situational awareness after the hazard significantly delays the restoration process. As a result, customers may experience an extended blackout, which causes large economic loss. On the other hand, the emerging advanced devices and technologies enabled through grid modernization efforts have the potential to improve the distribution system restoration strategy. However, utilizing these resources to aid the utilities in better distribution system restoration decision-making in response to extreme weather events is a challenging task. Therefore, this paper proposes an integrated solution: a distribution system restoration decision support tool designed by leveraging resources developed for grid modernization. We first review the current distribution restoration practice and discuss why it is inadequate in response to extreme weather events. Then we describe how the grid modernization efforts could benefit distribution system restoration, and we propose an integrated solution in the form of a decision support tool to achieve the goal. The advantages of the solution include improving situational awareness of the system damage status and facilitating survivability for customers. The paper provides a comprehensive review of how the existing methodologies in the literature could be leveraged to achieve the key advantages. The benefits of the developed system restoration decision support tool include the optimal and efficient allocation of repair crews and resources, the expediting of the restoration process, and the reduction of outage durations for customers, in response to severe blackouts due to extreme weather hazards.

Automated feeder switch↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of C ( t )-Integral Solutions in Extending ASME BPVC Section XI Division 2 Code Case N-934 for Transient Creep Crack Growth

Creep crack growth is a phenomenon which arises in damaged metallic structures under combined primary and secondary loads in the creep regime. The High Temperature Flaw Evaluation Code Committee of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (BPVC) is evaluating methods in extending Code Case N-934 to capture transient creep crack growth. Here, this paper provides context and basic examples on the selected approach to transient creep crack growth methods based on the C(t)-integral. The basis for selected C(t)-integral solution as analytical method is established, including an overview of its derivation. Practical assessments of a crack growing under creep conditions in a realistic component are conducted to illustrate the analytical approach. Additional considerations in the application of the analytical methods and limitations are discussed.

36 MATERIALS SCIENCE↗

An Edge-Cloud Integrated Solution for Buildings Demand Response Using Reinforcement Learning

Buildings, as major energy consumers, can provide great untapped demand response (DR) resources for grid services. However, their participation remains low in real-life. One major impediment for popularizing DR in buildings is the lack of cost-effective automation systems that can be widely adopted. Existing optimization-based smart building control algorithms suffer from high costs on both building-specific modeling and on-demand computing resources. To tackle these issues, this paper proposes a cost-effective edge-cloud integrated solution using reinforcement learning (RL). Beside RL’s ability to solve sequential optimal decision-making problems, its adaptability to easy-to-obtain building models and the off-line learning feature are likely to reduce the controller’s implementation cost. Using a surrogate building model learned automatically from building operation data, an RL agent learns an optimal control policy on cloud infrastructure, and the policy is then distributed to edge devices for execution. Simulation results demonstrate the control efficacy and the learning efficiency in buildings of different sizes. A preliminary cost analysis on a 4-zone commercial building shows the annual cost for optimal policy training is only 2.25% of the DR incentive received. Results of this study show a possible approach with higher return on investment for buildings to participate in DR programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NREL is Delivering Integrated Solutions for an Affordable and Secure Energy Future

The National Renewable Energy Laboratory (NREL) is the U.S. Department of Energy's primary national laboratory for energy systems research and development. As the energy systems laboratory, NREL's unique strength lies in developing and integrating a broad array of energy technologies into robust, resilient systems - bridging foundational research with practical applications to lower energy costs, drive economic growth, bolster national security, and deliver abundant and reliable energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Solutions for Interim Used Fuel Management: From Pool Unloading to Safe Delivery to Recycling or Repository Facilities - 17235

Safe management of used nuclear fuel (UNF) is key to the survival of the nuclear industry. That is why it is more important than ever to have a consent-based, practical, credible, and sustainable roadmap for managing the back-end of the nuclear cycle. Worldwide UNF Light Water Reactors (LWR) inventories are currently around 200,000 tons and are estimated to grow to more than 350,000 tons by 2030, and operating nuclear reactors in the U.S. continue to discharge UNF every 18 to 24 months. International experience has demonstrated that the development of a permanent geological repository can be a multi-decade process, especially in the face of public acceptance challenges. Meanwhile, the solution for permanent disposal of UNF in the U.S. is moving at a glacial pace. As a result, industrial stakeholders have been forced to find practical interim UNF storage solutions in order to continue safely operating their reactors. Among those interim solutions are the cask- or canister-based dry storage systems that have dramatically increased in the last 10 years as they provide flexibility for expansion with a low up-front investment. With interim dry storage in place for more than 30 years, our industry is entering a new phase as we are forced to prepare for a few more decades before geological repositories begin operating. Consequently, interim dry storage has to be extended for 80 years or more. Thus, new considerations have to be taken into account to ensure the safety of this stored used fuel: - Interim storage systems are aging; - High burn-up fuel behavior overtime is uncertain; - Used fuel is losing its self-protection; - The number of shutdown sites without a fuel transfer facility, such as a pool, is increasing; - Some owners of Independent Spent Fuel Storage installation (ISFSI) at shutdown sites are not nuclear operators anymore. With increasing uncertainties, AREVA TN -- based on its long expertise with used fuel transportation and interim storage systems -- is adapting its portfolio to develop integrated and flexible solutions that will remove the burden of interim used fuel management from nuclear operators. AREVA TN is developing comprehensive solutions to reduce risks including the continued supply of proven safe high-performance dry storage systems; on-site services to safely transfer used fuel from pool to pad; the optimization of fuel heat load in the storage pool and pad; innovative aging management services including inspection, monitoring and repair; a realistic solution for consolidated interim storage with a priority to remove Used Nuclear Fuel stored in dry storage systems from shutdown sites; world-class transport and logistics services to safely move the used fuel from nuclear reactor sites to consolidated storage and repository or recycling as applicable, and turnkey management of shutdown ISFSIs. Due to the lack of an available path for transporting used fuel away from reactors, nuclear operators are faced with many challenges and growing uncertainties. Our presentation will describe the practical solutions developed and being developed in order to manage used fuel on behalf of nuclear operators and allows them to continue focusing on the important job of producing carbon-free clean energy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integral Solution of Two-Region Solid–Liquid Phase Change in Annular Geometries and Application to Phase Change Materials–Air Heat Exchangers

A mathematical model based on the integral method is developed to solve the problem of conduction-controlled solid–liquid phase change in annular geometries with temperature gradients in both phases. The inner and outer boundaries of the annulus were subject to convective, constant temperature or adiabatic boundary conditions. The developed model was validated by comparison with control volume-based computational results using the temperature-transforming phase change model, and an excellent agreement was achieved. The model was used to conduct parametric studies on the effect of annuli geometry, thermophysical properties of the phase change materials (PCM), and thermal boundary conditions on the dynamics of phase change. For an initially liquid PCM, it was found that increasing the radii ratio increased the total solidification time. Also, increasing the Biot number at the cooled (heated) boundary and Stefan number of the solid (liquid) PCM, decreased (increased) the solidification time and resulted in a greater (smaller) solid volume fraction at steady state. The application of the developed method was demonstrated by design and analysis of a PCM–air heat exchanger for HVAC systems. The model can also be easily employed for design and optimization of annular PCM systems for all associated applications in a fraction of time needed for computational simulations.

Shabgard, Hamidreza↗

Discrete and Integrated Solutions for Hybrid PV Plants Without Momentary Cessation in Low SCR and High Penetration PE Grids

With the increased penetration of power electronic (PE) based loads and sources, advanced solutions may be required for the enhancement of grid stability in regions with low short circuit ratio (SCR) and high penetration PE grids. The requirement of advanced solutions arises from the gradual paradigm shift of the electric grid from the traditional electric machine dominant system to a high penetration of PE-based system. One of the major challenges with such systems in recent times is the momentary cessation during alternating current (ac) grid transmission faults. During momentary cessation, PE-based resources cease to operate, thus creating probable reliability challenges for the grid. In this paper, potential feasible options to provide continuity of operation during such scenarios are presented. The options are considered through identifying upgrades in existing and upcoming discrete development of photovoltaic (PV) and energy storage systems (ESS) termed as discrete hybrid PV plants. Additionally, an advanced concept of integrated development of PV and ESS connecting to ac transmission grid links called multi-port autonomous reconfigurable solar power plant (MARS) is evaluated. The developed new solutions are evaluated for different grid use cases and scenarios in PSCAD.

Marthi, Phani Ratna Vanamali↗

Distribution Integration Solution Cost Options (DISCO) [Slides]

DISCO is a Python-based NREL software tool for conducting scalable, repeatable distribution analyses. Although DISCO was originally developed to support photovoltaic impact analyses, it can also be used to understand the impact of other distributed energy resources and load changes on distribution systems. This presentation took place on April 9, 2024, and included NREL power grid researchers Sherin Ann Abraham and Shibani Ghosh.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Today's Energy Challenges, Tomorrow's Solutions: Integrated Energy Pathways: Modernizing Our Energy Systems

Integrated Energy Pathways Today's electric grid was built for century-old needs, not the needs of tomorrow's emerging system. As the cost of generating electricity falls, products and systems that previously operated on other types of fuels are becoming increasingly "electrified." Instead of a one-way flow of electricity to systems that operate independently from one another, we are seeing more bi-directional connectivity between the grid and multiple end points. Integrated Energy Systems require a fundamental rethinking of grid infrastructure and the path electricity takes from the source of generation to the end point of use. Inevitably, the way the grid is managed today won't be the way it is managed 10-15 years from now. NREL is pioneering the fundamental research needed to guide this transition through renewable energy fuels and low-carbon electricity generation. Working with industry partners, we can collaboratively develop a fresh approach to energy generation, security, resilience, and advanced mobility.

energy security↗

Integrated solution techniques for security constrained unit commitment problem

Apparatus and methods are disclosed for solving Mixed Integer Programming (MIP) problems, such as Security Constrained Unit Commitment (SCUC) problems used by power grid authorities to perform day-ahead market clearing. In certain examples, a plurality of threads of a software tool implementing a concurrent optimizer can be executed concurrently and sequentially to generate new solutions to a SCUC problem for an upcoming planning horizon. Data can be shared among the concurrently executing threads, such as intermediate/incumbent solutions and hints regarding the fixing of variables and constraints to reduce the size of the SCUC problem. In some examples, the threads are seeded with historical solutions from prior planning horizons. The software tool can select a best solution from the solutions generated by the threads, and determine dispatch instructions for a device coupled to the power grid for the upcoming planning horizon based at least in part on the selected solution.

Pan, Feng↗

An Integrated Two-Factor Authentication Solution Using Pulse Connect Secure and Apache HTTP Server

Complex system requirements can often lead to a situation wherein no single product or platform can provide a solution. In these cases, a solution integrating the features of multiple products and platforms is needed. Recently, a program sponsor required discontinued use of a third-party Security Assertion Markup Language Identity Provider that was being used to implement a two-factor authentication (2FA) solution that fully integrated with Pulse Connect Secure (PCS). PCS alone could not provide the features necessary to meet all the requirements of a new 2FA solution. The challenge was to leverage the features of additional platforms to design an integrated solution to meet all requirements. This paper presents a solution that integrates the features of PCS, Apache HyperText Transfer Protocol Server, and a custom application that meets all requirements, including a requirement to defend against Uniform Resource Locator manipulation as means to gain unauthorized access to backend applications.

97 MATHEMATICS AND COMPUTING↗