Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Arrival Departure and Surface (IADS)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Distributed Schemes for Integrated Arrival Departure Surface (IADS) Scheduling

The objective of the NRA is to investigate and develop integrated scheduling solutions for arrival, departure and surface operations. The option year briefing summarizes simulation-based analyses of the departure metering process to investigate strategic queue management strategies and their robustness to uncertainty, assess the impact of delaying departures at their gates on blocking the arrivals destined for the same gates, and evaluate the effects and benefits of relaxing current-day MIT constraints when ATD-2 is in operation.

ATD-2↗

ATD-2 Integrated Arrival, Departure, and Surface (IADS) Operations

The ATD-2 Integrated Arrival, Departure, and Surface (IADS) traffic management system extends integrated traffic sequencing all the way from the gate to the overhead stream and back again for multi-airport, metroplex environments. NASA and the FAA are developing the IADS system in close coordination with industry partners.

pilot procedures↗

Flight Deck Implications for the Implementation of an Integrated Arrival, Departure, and Surface (IADS) Traffic Management System

NASA's Airspace Technical Demonstration-2 (ATD-2) Integrated Arrival, Departure, and Surface (IADS) traffic management system integrates strategic and tactical scheduling tools for traffic sequencing from the gate to the overhead stream and back again for multi-airport, metroplex environments. The system is expected to increase airport efficiency, predictability, and throughout while improving information sharing among all airport operators. A series of knowledge elicitation sessions were conducted with commercial airline pilots and general aviation pilots to characterize airport operations and procedures. This presentation describes ATD-2 IADS-enabled Information Sharing impacts on the Flight Deck, benefits of that Information Sharing, pilot procedural changes, our pilot engagement/outreach efforts, use of a Mobile App to faciliate information flow in GA operations, and future IADS efforts at other airports/metroplexes.

IADS↗

Field Evaluation of the Baseline Integrated Arrival, Departure, and Surface (IADS) Capabilities at Charlotte Douglas International Airport (CLT)

NASA is currently developing a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, through a strong partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The users of the IADS system include the personnel at the Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington Center. This paper describes the Phase 1 Baseline IADS capabilities and field evaluation conducted at CLT from September 2017 for a year. From the analysis of operations data, it is estimated that 538,915 kilograms of fuel savings, and 1,659 metric tons of CO2 emission reduction were achieved during the period with a total of 944 hours of engine run time reduction. The amount of CO2 savings is estimated as equivalent to planting 42,560 urban trees. The results have also shown that the surface metering had no negative impact on on-time arrival performance of both outbound and inbound flights. The technology transfer of Phase 1 Baseline IADS capabilities has been made to the FAA and aviation industry, and the development of additional capabilities for the subsequent phases is underway.

and Surface (IADS)↗

Airspace Technology Demonstration 2 (ATD-2) Integrated Surface and Airspace Simulation - Experiment Plan

This presentation describes the objectives and high level setup for the human-in-the-loop simulation of the integrated surface and airsapce simulation of the ATD-2 Integrated Arrival, Departure, Surface (IADS) system. The purpose of the simulation is to evaluate the functionality of the IADS system, including tactical surface scheduler, negotiation of departure times for the flights under Traffic Management Initiatives (TMIs), and data exchange between ATC Tower and airline Ramp. The same presentation was presented to serve the experiment review prior to the simulation.

Surface↗

Identifying Key Issues and Potential Solutions for Integrated Arrival, Departure, Surface Operations by Surveying Stakeholder Preferences

NASA's Aeronautics Research Mission Directorate (ARMD) collaborates with the FAA and industry to provide concepts and technologies that enhance the transition to the next-generation air-traffic management system (NextGen). To facilitate this collaboration, ARMD has a series of Airspace Technology Demonstration (ATD) sub-projects that develop, demonstrate, and transitions NASA technologies and concepts for implementation in the National Airspace System (NAS). The second of these sub-projects, ATD-2, is focused on the potential benefits to NAS stakeholders of integrated arrival, departure, surface (IADS) operations. To determine the project objectives and assess the benefits of a potential solution, NASA surveyed NAS stakeholders to understand the existing issues in arrival, departure, and surface operations, and the perceived benefits of better integrating these operations. NASA surveyed a broad cross-section of stakeholders representing the airlines, airports, air-navigation service providers, and industry providers of NAS tools. The survey indicated that improving the predictability of flight times (schedules) could improve efficiency in arrival, departure, and surface operations. Stakeholders also mentioned the need for better strategic and tactical information on traffic constraints as well as better information sharing and a coupled collaborative planning process that allows stakeholders to coordinate IADS operations. To assess the impact of a potential solution, NASA sketched an initial departure scheduling concept and assessed its viability by surveying a select group of stakeholders for a second time. The objective of the departure scheduler was to enable flights to move continuously from gate to cruise with minimal interruption in a busy metroplex airspace environment using strategic and tactical scheduling enhanced by collaborative planning between airlines and service providers. The stakeholders agreed that this departure concept could improve schedule predictability and suggested several key attributes that were necessary to make the concept successful. The goals and objectives of the planned ATD-2 sub-project will incorporate the results of this stakeholder feedback.

integrated arrival/departure/surface operations↗

NASA ATD-2 Site Implementation Lead

These slides are part of the ATD-2 / Single-Airport Integrated Arrival Departure Surface (IADS) session at the ATD TIM in Sep 2021. The slides provide an overview of the ATD-2 IADS field demonstration at CLT.

ATD-2, IADS, Phase 1, Phase 2, CLT, field demonstr↗

On-Time Performance ASPM Non-Parametric Statistical Analysis

The purpose of this analysis is to provide a data-driven examination of two selected flight metrics, i.e., (1) total taxi-out time and (2) actual off time minus scheduled off block time. More specifically, Aviation System Performance Metrics (ASPM) data were analyzed to determine any possible differences in CLT (Charlotte Douglas International Airport) departure flights on these two metrics when comparing pre-IADS (Integrated Arrival, Departure, and Surface Operations) against post-IADS metering operations. This was originally presented to the ATD-2 (Airspace Technology Demonstration-2) Analytics team in August 2018.

tech transfer↗

Airspace Technology Demonstration 2 (ATD-2) Technology Description Document (TDD)

This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration's (NASA) Airspace Technology Demonstration 2 (ATD-2) project, to be demonstrated beginning in 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA is developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research will be demonstrated at the CLT airport beginning in 2017. Phase 1 will provide the initial demonstration of the integrated system with strategic and tactical scheduling, tactical departure scheduling to an en route meter point, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.

integrated arrival↗

Departure Approval Request Compliance Effects on Overhead Stream Insertion

Integrated Arrival-Departure-Surface (IADS) air traffic management relies on information sharing and integration between automation systems for efficiency, predictability, and throughput improvements throughout the National Airspace System (NAS). The NASA Airspace Technology Demonstration 2 (ATD-2) project supports this effort by integrating SWIM (System Wide Information Management) information and evaluating and refining potential TFDM (Terminal Flight Data Manager) functionality in a surface traffic management system fielded at Charlotte-Douglas International Airport (CLT). Among the IADS areas under study during ATD-2 is the use of electronically negotiated departure times for efficiently inserting flights into overhead traffic streams. Stream-insertion accuracy is important for reducing excessive vectoring that negatively impacts the NAS by increasing controller workload along with aircraft fuel burn and emissions. Departure-time approval requests (APREQs) provide center-approved departure times to allow for smooth stream insertion. In this presentation, TBFM (Time-Based Flow Management) and ATD-2 flight summary data are used to empirically show that APREQ compliance leads to improved stream insertion.

Overhead-Stream Insertion↗

Tactical Surface Metering Procedures for Charlotte Douglas International Airport

NASA has been collaborating with the Federal Aviation Administration (FAA) and aviation industry partners to develop and demonstrate new concepts and technologies for the Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. The primary goal of the ATD-2 project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments while maintaining or improving throughput by enhancing and integrating arrival, departure and surface prediction, scheduling, and management systems. In the Phase 1 Baseline IADS Demonstration, the tactical surface scheduling capability and the user interfaces for ramp controllers and ramp traffic managers were implemented for ramp operations. The purpose of the tactical surface scheduling capability is to provide the airline ramp controller with aircraft pushback advisories that prevent surface congestion and to respond to surface and airspace constraints that become known over relatively short time horizons. For this purpose, the tactical surface metering tool first estimates the capacity of current and near-future runway resources from flight schedule and surveillance data. With demand forecasts and predicted taxi trajectories, this tool computes an efficient runway schedule of aircraft in the planning horizon based on their readiness, Earliest Off-Block Times (EOBTs), and a ration by schedule (RBS) rule. Details on the implementation of the Tactical Surface Metering tool will be provided in the full paper. Both pushback and recommended hold times advisories provided by this surface metering tool are shown on the user interfaces for the ramp controller and the ramp traffic manager, called Ramp Traffic Console (RTC) and Ramp Manager Traffic Console (RMTC), respectively. There is excess queue time in the system due to demand capacity imbalance, this time can be taken as a hold on the runway queue or at the gate and was referred to as the Metering Value. This metering value can be adjusted by the Ramp Manager in collaboration with Air Traffic Controller-Tower Traffic Management Coordinator (TMC). They selected a set of metering values as default values for the tool during human-in-the-loop simulation. As the metering value increases, there is a decrease in the gate hold and increase in the queue time at the runway. Procedures and Information needs related to managing the surface metering procedures were researched in the simulated environment. These procedures will be compared to the procedures adopted at Charlotte Douglas International Airport when the tools were deployed and adopted in November 2017 for one departure push bank per day. Feedback regarding initial issues, information needs such as the need to see EOBTs on the flight data tags and how they compare to scheduled times will also be discussed in the full paper. Initial results will be provided regarding the choice of the metering value and how it was adjusted on a daily basis and what procedures evolved will also be presented in the paper.

surface metering↗

Airspace Technology Demonstration 2 (ATD-2) Phase 1 Concept of Use (ConUse)

This document presents an operational Concept of Use (ConUse) for the Phase 1 Baseline Integrated Arrival, Departure, and Surface (IADS) prototype system of NASA's Airspace Technology Demonstration 2 (ATD-2) sub-project, which began demonstration in 2017 at Charlotte Douglas International Airport (CLT). NASA is developing the IADS system under the ATD-2 sub-project in coordination with the Federal Aviation Administration (FAA) and aviation industry partners. The primary goal of ATD-2 sub-project is to improve the predictability and the operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation's most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 effort is a five-year research activity through 2020. The initial phase of the ATD-2 sub-project, which is the focus of this document, will demonstrate the Phase 1 Baseline IADS capability at CLT in 2017. The Phase 1 Baseline IADS capabilities of the ATD-2 sub-project consists of: (a) Strategic and tactical surface scheduling to improve efficiency and predictability of airport surface operations, (b) Tactical departure scheduling to enhance merging of departures into overhead traffic streams via accurate predictions of takeoff times and automated coordination between the Airport Traffic Control Tower (ATCT, or Tower) and the Air Route Traffic Control Center (ARTCC, or Center), (c) Improvements in departure surface demand predictions in Time Based Flow Management (TBFM), (d) A prototype Electronic Flight Data (EFD) system provided by the FAA via the Terminal Flight Data Manager (TFDM) early implementation effort, and (e) Improved situational awareness and demand predictions through integration with the Traffic Flow Management System (TFMS), TBFM, and TFDM (3Ts) for electronic data integration and exchange, and an on-screen dashboard displaying pertinent analytics in real-time. The surface scheduling and metering element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 Upon successful demonstration of the Phase 1 Baseline IADS capability, follow-on demonstrations of the matured IADS traffic management capabilities will be conducted in the 2018-2020 timeframe. At the end of each phase of the demonstrations, NASA will transfer the ATD-2 sub-project technology to the FAA and industry partners.

integrated arrival↗

Airspace Technology Demonstration 2 (ATD-2) Phase 2 Technology Description Document (TDD)

This Technology Description Document (TDD) provides an overview of the technology for the Phase 1 Baseline and Phase 2 Fused demonstrations of the Integrated Arrival, Departure, and Surface (IADS) prototype system of the National Aeronautics and Space Administration’s (NASA) Airspace Technology Demonstration 2 (ATD-2) project, which has been demonstrated since October of 2017 at Charlotte Douglas International Airport (CLT). Development, integration, and field demonstration of relevant technologies of the IADS system directly address recommendations made by the Next Generation Air Transportation System (NextGen) Integration Working Group (NIWG) on Surface and Data Sharing and the Surface Collaborative Decision Making (Surface CDM) concept of operations developed jointly by the Federal Aviation Administration (FAA) and aviation industry partners. NASA has been developing the IADS traffic management system under the ATD-2 project in coordination with the FAA, flight operators, CLT airport operators, and the National Air Traffic Controllers Association (NATCA). The primary goal of ATD-2 is to improve the predictability and operational efficiency of the air traffic system in metroplex environments, through the enhancement, development, and integration of the nation’s most advanced and sophisticated arrival, departure, and surface prediction, scheduling, and management systems. The ATD-2 project is a 5-year research activity beginning in 2015 and extending through 2020. The Phase 1 Baseline IADS capability resulting from the ATD-2 research has been demonstrated at the CLT airport since the beginning of October 2017. Phase 1 provided data exchange and integration with the initial demonstration of the integrated system of strategic and tactical scheduling, collaborative tactical surface metering, tactical departure scheduling to an en route meter point and overhead stream insertion, initial integration of a TFDM SWIM prototype feed, and an early implementation prototype of a Terminal Flight Data Manager (TFDM) Electronic Flight Data (EFD) system. The strategic surface scheduling element of the capability is consistent with the Surface CDM Concept of Operations published in 2014 by the FAA Surface Operations Directorate.1 The Phase 2 Fused IADS system provided substantial updates to baseline IADS Demonstration capability. Improvements were made to the IADS modeler; tactical surface scheduling, and metering; tactical departure scheduling for overhead stream insertion; Electronic Flight Data (EFD) and the integration with the FAA Advanced Electronic Flight Strip (AEFS); RTC/RMTC, and departure trajectories. New capabilities included a TFDM SWIM prototype feed and delivery of IADS data via the TFDM Terminal Publication (TTP) service of the FAA’s SWIM system; strategic surface scheduling and metering as well as fusion with tactical surface metering; integration and ingestion of data from TTP-connected Mobile App and texting industry for General Aviation (GA) flights; and expansion of airspace deployments to include adjacent Center automation, in particular interface with the Atlanta Center (ZTL) arrival metering TBFM system to evaluate pre-scheduling of flights. Improvements in Data Analysis and System Health (DASH) monitoring and updates were completed as well.

Talebi, Ehsan↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of March 31, 2020, it is estimated that 5,075,981 pounds of fuel savings and 15,634,022 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,832 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,254 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

ATD-2 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. The Phase 1 Baseline IADS capabilities provide enhanced operational efficiency and predictability of flight operations through data exchange and integration, tactical surface metering, and automated coordination of release time of controlled flights for overhead stream insertion. The Phase 2 Fused IADS capabilities include the fusion of strategic and tactical surface metering, Atlanta Center airspace tactical scheduling, Electronic Flight Data (EFD) integration, Terminal Flight Data Manager (TFDM) Terminal Publication (TTP) prototype, and Mobile App for General Aviation (GA) community. In the Phase 2 field evaluation, strategic surface metering provides advance notice of metering and additional stability to the assigned gate holds. The users of the IADS system in Phases 1 and 2 include the personnel at Charlotte Douglas International Airport (CLT) air traffic control tower, American Airlines ramp tower, CLT terminal radar approach control (TRACON), and Washington and Atlanta Center. This document describes the ATD-2 benefits mechanism used to assess the Phases 1 and 2 IADS capabilities and field evaluation conducted at CLT since September 2017. The ATD-2 benefits mechanism mainly consists of surface metering and overhead stream insertion. This document provides detailed calculation methods of major benefit metrics, such as fuel savings, gas emissions savings, and engine runtime reduction, which can be obtained through surface metering, gate hold of Approval Request (APREQ) flights prior to pushback, and the renegotiation of release time while taxiing. As of April 30, 2020, it is estimated that 5,097,173 pounds of fuel savings and 15,699,292 pounds of CO2 emission reduction have been achieved so far, with a reduction of 3,831 hours in total engine runtime. The amount of CO2 savings is estimated to be equivalent to planting 116,739 urban trees. The pre- and post-metering comparison results using FAA’s Aviation System Performance Metrics (ASPM) data have also shown that the surface metering had no negative impact on the on-time arrival performance of both outbound and inbound flights at CLT.

ATD-2↗

ATD-2 Phase 3 Benefits Mechanism

NASA has been developing and demonstrating a suite of decision support capabilities for integrated arrival, departure, and surface (IADS) operations in a metroplex environment. The effort is being made in three phases, under NASA’s Airspace Technology Demonstration 2 (ATD-2) sub-project, through a close partnership with the Federal Aviation Administration (FAA), air carriers, airport, and general aviation community. ATD-2 Phase 1 & 2 have successfully demonstrated new technologies developed to manage the IADS capabilities at a single airport. The Phase 3 builds upon Phases 1 and 2 by extending the capabilities to a Metroplex environment where multiple airports are interacting and competing for resources at the terminal boundary. This document describes the metrics used to inform the flight operators, Air Traffic Control (ATC) tower, FAA, and even broader aviation community about opportunities to reroute aircraft and the metrics used to assess the performance of the ATD-2 Phase 3 system including benefits. This document provides definitions and detailed calculation methods of identified Phase 3 benefit metrics such as OFF Delay Savings, IN Delay Savings, and Aggregate System-Wide Savings. This document also describes the mechanism to translate delay savings metrics into fuel and emissions savings.

ATD-2 Phase 3↗

Operational Impact of the Baseline Integrated Arrival, Departure, and Surface System Field Demonstration

To address the Integrated Arrival, Departure, and Surface (IADS) challenge, NASA is developing and demonstrating trajectory-based departure automation under a collaborative effort with the FAA and industry known as Airspace Technology Demonstration 2 (ATD-2). ATD-2 builds upon and integrates previous NASA research capabilities that include the Spot and Runway Departure Advisor (SARDA), the Precision Departure Release Capability (PDRC), and the Terminal Sequencing and Spacing (TSAS) capability. The ATD-2 field demonstration is organized into three phases. Phase I illustrates a Baseline IADS demonstration and includes all components of ATD-2 running in operational environments. Subsequent phases will fuse together strategic scheduling components as well as take into account metroplex considerations. This paper describes the baseline IADS system that was deployed at the end of 2017 and is continuing to run as part of the ATD-2 demonstration taking place at Charlotte-Douglas International Airport (CLT). The primary areas of deployment and system use are in the CLT Air Traffic Control Tower, CLT TRACON, CLT American Airlines ramp tower, Washington Center facility and American Airlines Integration Operations Center (IOC). In addition to describing the functions and capabilities that are part of the baseline IADS system, this paper also provides metrics regarding operational use as well as initial benefits metrics. Benefit metrics continue to be collected and aggregated across the areas of system delay, throughput, taxi time, fuel burn savings, and emissions savings. Furthermore, benefits as a result of common awareness of delays and the impact of takeoff and departure restrictions stemming from traffic flow management initiatives are described. The overall benefit of improved predictability and efficiency as a result of the baseline IADS system demonstration is also discussed.

operational system↗

Strategic Surface Metering at Charlotte Douglas International Airport

NASA is conducting a field test of the Airspace Technology Demonstration2 (ATD-2) to evaluate an Integrated Arrival, Departure, and Surface (IADS) traffic management system. The IADS system was deployed to Charlotte Douglas International Airport (CLT) in 2017 for a three-year field evaluation. The Phase 1 field evaluation included tactical surface metering, which manages departure excess taxi time by tactically assigning gate holds. Phase 2 built upon the lessons learned from Phase 1 to extend surface metering into the strategic metering timeframes. In this paper, we describe the strategic metering capabilities of the ATD-2 IADS system and the operational results from CLT.

Airspace Technology Demonstration 2↗