Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Logistics Support (ILS)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

An Integrated Economics Model for ISRU in Support of a Mars Colony - Initial Results Report

This database, the Mars Colony Architecture Model (MCAM), is then linked to a variety of “downsteam” analytic models. In particular, we integrated an Extraction Process (i.e., “Mining”) Model, an Infrastructure and Integrated Logistics Support (ILS) Model, and an Economics Integration Model. The Extraction Process Model focuses on the technologies associated with in situ resource extraction, processing, storage and handling, and delivery. For each mined resource, which may involve multiple cooperating In Situ Resource Utilization (ISRU) systems in a given architecture, the Extraction Process Model computes the production rate as a function of the systems’ technical parameters and the local Mars environment. As with our earlier work, this model focuses on the extraction and processing of Mars water/ice.

Shishko, Robert↗

Space station needs, attributes and architectural options. Volume 4, task 2 and 3: Mission implementation and cost

An overview of the basic space station infrastructure is presented. A strong case is made for the evolution of the station using the basic Space Transportation System (STS) to achieve a smooth transition and cost effective implementation. The integrated logistics support (ILS) element of the overall station infrastructure is investigated. The need for an orbital transport system capability that is the key to servicing and spacecraft positioning scenarios and associated mission needs is examined. Communication is also an extremely important element and the basic issue of station autonomy versus ground support effects the system and subsystem architecture.

Source record↗

Space Station - An integrated approach to operational logistics support

Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.

Hosmer, G. J.↗

Supportability to 'Mars...and beyond'

The development of a 'front-end' Integrated Logistics Support (ILS) strategic concept and a Supportability Index Model (SIM) for incorporation into future SEI engineering efforts is discussed. The ILS objectives and support strategy are examined. The SIM mission phases, which evaluates those items determined to be the most crucial for each mission phase in terms of a measure of supportability effectiveness, are summarized and the SIM data development and initial model results are reviewed.

Thurman, Loren A.↗

Design for Maintenance

Design influence is accomplished through inclusion of Reliability, Maintainability, and Supportability (RMS) as part of the system’s design characteristics from program/project inception to ensure the system(s) can be supported and maintained throughout the life cycle.

Maintainability MTTR Maintenance Integrated Logist↗

NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

Smith, David A.↗

Application of Different Statistical Techniques in Integrated Logistics Support of the International Space Station Alpha

The process to predict the values of the maintenance time dependent variable parameters such as mean time between failures (MTBF) over time must be one that will not in turn introduce uncontrolled deviation in the results of the ILS analysis such as life cycle cost spares calculation, etc. A minor deviation in the values of the maintenance time dependent variable parameters such as MTBF over time will have a significant impact on the logistics resources demands, International Space Station availability, and maintenance support costs. It is the objective of this report to identify the magnitude of the expected enhancement in the accuracy of the results for the International Space Station reliability and maintainability data packages by providing examples. These examples partially portray the necessary information hy evaluating the impact of the said enhancements on the life cycle cost and the availability of the International Space Station.

Sepehry-Fard, F.↗

Integrated Logistics Support Analysis of the International Space Station Alpha, Background and Summary of Mathematical Modeling and Failure Density Distributions Pertaining to Maintenance Time Dependent Parameters

The process of predicting the values of maintenance time dependent variable parameters such as mean time between failures (MTBF) over time must be one that will not in turn introduce uncontrolled deviation in the results of the ILS analysis such as life cycle costs, spares calculation, etc. A minor deviation in the values of the maintenance time dependent variable parameters such as MTBF over time will have a significant impact on the logistics resources demands, International Space Station availability and maintenance support costs. There are two types of parameters in the logistics and maintenance world: a. Fixed; b. Variable Fixed parameters, such as cost per man hour, are relatively easy to predict and forecast. These parameters normally follow a linear path and they do not change randomly. However, the variable parameters subject to the study in this report such as MTBF do not follow a linear path and they normally fall within the distribution curves which are discussed in this publication. The very challenging task then becomes the utilization of statistical techniques to accurately forecast the future non-linear time dependent variable arisings and events with a high confidence level. This, in turn, shall translate in tremendous cost savings and improved availability all around.

Sepehry-Fard, F.↗

Integrated Logistics Support Analysis of the International Space Station Alpha: An Overview of the Maintenance Time Dependent Parameter Prediction Methods Enhancement

The objective of this publication is to introduce the enhancement methods for the overall reliability and maintainability methods of assessment on the International Space Station. It is essential that the process to predict the values of the maintenance time dependent variable parameters such as mean time between failure (MTBF) over time do not in themselves generate uncontrolled deviation in the results of the ILS analysis such as life cycle costs, spares calculation, etc. Furthermore, the very acute problems of micrometeorite, Cosmic rays, flares, atomic oxygen, ionization effects, orbital plumes and all the other factors that differentiate maintainable space operations from non-maintainable space operations and/or ground operations must be accounted for. Therefore, these parameters need be subjected to a special and complex process. Since reliability and maintainability strongly depend on the operating conditions that are encountered during the entire life of the International Space Station, it is important that such conditions are accurately identified at the beginning of the logistics support requirements process. Environmental conditions which exert a strong influence on International Space Station will be discussed in this report. Concurrent (combined) space environments may be more detrimental to the reliability and maintainability of the International Space Station than the effects of a single environment. In characterizing the logistics support requirements process, the developed design/test criteria must consider both the single and/or combined environments in anticipation of providing hardware capability to withstand the hazards of the International Space Station profile. The effects of the combined environments (typical) in a matrix relationship on the International Space Station will be shown. The combinations of the environments where the total effect is more damaging than the cumulative effects of the environments acting singly, may include a combination such as temperature, humidity, altitude, shock, and vibration while an item is being transported. The item's acceptance to its end-of-life sequence must be examined for these effects.

Sepehry-Fard, F.↗

LBNF/DUNE Liquid Argon Roadmap

The Deep Underground Neutrino Experiment (DUNE) is an international flagship venture to unlock the mysteries of neutrinos. Hosted at the Sanford Underground Research Facility (SURF) and supported by the Long-Baseline Neutrino Facility (LBNF), DUNE relies on nearly 75,000 tonnes of ultrapure liquid argon (LAr) housed in state-of-the-art cryostats. Transporting such vast quantities of LAr to its destination a mile underground in Lead, SD, is a logistical and engineering challenge. The process begins with securing large quantities of liquid argon from suppliers located far from the site, with major sources situated near Houston, TX and Chicago, IL. The receiving facility, located atop a mountain with steep, often snow-covered access roads, provides limited maneuverability for trucks and can only handle two deliveries simultaneously. The facility serves as an entry point for argon to the greater LBNF cryogenic system. It is furnished with truck unloading stations, limited buffer storage of some 280 tonnes capacity, and vaporizers. The last are crucial for converting liquid argon into gas for transfer down the Ross Shaft, eliminating the need for cryogens in the vertical pipeline. These constraints, along with other operational factors, cap the delivery rate at 70 tonnes per day. Once underground, the argon is purified and recondensed before filling the cryostats. This roadmap outlines the integrated supply chain and cryogenic systems that enable the delivery of LAr to support DUNE’s groundbreaking physics research.

Maciazka, Matt [Fermilab]↗

Co-Location of Cellulosic Bioethanol and Alcohol-to-Jet (ATJ) Production Facilities for Targeted Scale-Up of Sustainable Aviation Fuel (SAF) Production

Achieving aerospace industry net-zero emissions by 2050 requires rapid scaling of sustainable aviation fuel (SAF) production. Leveraging existing infrastructure, proven technologies like Alcohol-to-Jet (ATJ), and low carbon intensity (CI) feedstocks (e.g., switchgrass and miscanthus) can support this transition and help achieve near-term emissions reduction targets. This study evaluates the implications of lignocellulosic ethanol biorefinery siting and integration with petroleum refineries to produce SAF across 1000 sites randomly sampled from areas suitable for perennial grasses in the U.S. rainfed region. To better understand the logistics of material transport and handoffs, we integrated models of biomass harvest, transport, ethanol, and ATJ production in a stochastic framework based on Monte Carlo simulations to characterize SAF minimum selling price (MSP) and carbon intensity (CI), considering site-specific parameters (e.g., feedstock production, transportation, taxes, incentives). The results indicate trade-offs between MSP and CI across locations, with median MSP ranging from 7.9 to 12.8 USD·gal −1 and CI from −9.7 to 39.4 gCO 2 e·MJ −1 . Despite high estimated decarbonization costs (580 USD·tonCO 2 e −1 ), our results indicate that site-specific deployment of ATJ with low-CI feedstocks can improve sustainability outcomes. The framework provides a systematic approach to assess cost and sustainability trade-offs across locations, considering the end-to-end supply chain and supporting an informed investment in SAF production.

09 BIOMASS FUELS↗