Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integration and test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Characterization and integration of the singular test integrals in the method-of-moments implementation of the electric-field integral equation

In this paper, we characterize the logarithmic singularities arising in the method of moments from the Green’s function in integrals over the test domain, and we use two approaches for designing geometrically symmetric quadrature rules to integrate these singular integrands. These rules exhibit better convergence properties than quadrature rules for polynomials and, in general, lead to better accuracy with a lower number of quadrature points. In this work, we demonstrate their effectiveness for several examples encountered in both the scalar and vector potentials of the electric-field integral equation (singular, near-singular, and far interactions) as compared to the commonly employed polynomial scheme and the double Ma–Rokhlin–Wandzura (DMRW) rules, whose sample points are located asymmetrically within triangles.

42 ENGINEERING↗

Mo-100 Disk Structural Integrity Tests II

This report is a continuation of the work performed in the report, Mo-100 Disk Structural Integrity Tests I [1]. The NorthStar pressed and sintered 29 mm diameter, 0.5 mm thick Mo-100 disks will be subjected to large temperature gradients when in-beam during production. These large temperature gradients cause high stress and deformation within the disks that could prove detrimental to the target assembly’s cooling performance. Disk fracture is also a possibility that must be understood. Therefore, disk structural integrity tests were performed to understand the thermal induced behavior of these disks. In order to replicate the in-beam conditions, the Mo-100 disks were subjected to large temperature gradients using a 30kW induction heater and coil. A series of transient tests were conducted in a similar fashion as the previous work, as well as an attempt to create steady state conditions for more accurate temperature gradients. The transient thermal test setup and results are described in this report.

36 MATERIALS SCIENCE↗

Flat TBPS Integration Testing for the CMS Outer Tracker Upgrade

The upcoming High-Luminosity (HL) LHC will significantly increase luminosity, introducing more demanding operating conditions for the CMS detector. To meet these challenges, CMS is undergoing major upgrades, including a complete replacement of its tracking detector. This poster presents recent integration testing efforts conducted at Fermilab on the Flat Tracker Barrel with pixel-strip (PS) modules integration test stand, a subcomponent of the outer tracker located in the central barrel region. In this region, PS modules are mounted on structures that provide mechanical support and cooling, called planks. The testing focuses on validating the integrated system’s thermal and electrical performance. Results from these tests will be discussed, highlighting their importance for ensuring reliable tracker operation in the HL-LHC era.

Salazar Segovia, Itzelli [UC, Davis]↗

Sensitivity Analysis of Salt Storage Cavern Mechanical Integrity Test Parameters

This report examines the sensitivity of salt cavern Mechanical Integrity Tests (MIT) to uncertainties in key test parameters. MIT's are used by cavern operators to detect and quantify leak rates in access wells in underground salt storage caverns and involve a suite of measured and assumed parameters that have a direct impact on the sensitivity of the testing to detect actual leaks from the cavern storage system. Determining the sensitivity of the testing to these different parameters provides a basis for understanding the results from, and informing the design criteria for, this type of testing. Without fully understanding the sensitivity of the test to the testing parameters, it is possible that the test results may not accurately reflect the integrity of the cavern system; an actual leak may be missed, or an intact system may be interpreted as leaking. This report reviews the main parameters included in MITs and examines how selected changes in their values can impact test results. The deviations used in the sensitivity analyses were designed to be within the ranges believed to be similar to those which may be encountered during testing. The results show that small, plausible fluctuations in some of the parameters measured values can have a significant impact on the testing results. Of the parameters studied here, the sensitivity analyses showed the order of importance to be (from highest to lowest): nitrogen-oil interface depth measurement, well bore temperature, well head pressure, and finally the internal geometry of the testing interval.

42 ENGINEERING↗

Mo-100 Disk Structural Integrity Tests I

The NorthStar pressed and sintered 29 mm diameter, 0.5 mm thick Mo-100 disks will be subjected to large temperature gradients when in beam during production. The beam preferentially heats the disk center, while the aggressive cooling by the helium keeps areas outside the beam spot relatively cool. The result is a temperature gradient of up to 900°C over the radial distance of 14.5 mm. To test the disk integrity with this high temperature gradient, a special holder for a single disk was made such that proper cooling can be applied as in the design target and the disk heating can be replicated with induction heating. NorthStar press and sintered disks were used for these tests.

36 MATERIALS SCIENCE↗

Brief Overview of the ASD Integrated Test Stand, Activities and Hazards

The ITS venue provides the first opportunity to fully assemble and test the performance of the injector; integrate, assemble and test four modules; measure the severity of the Beam Break-Up instability and perform the first set of beam measurements. Figure 1 shows a high level configuration of the ITS without the system of overhead cable management trays. The final configuration will integrate the injector, 4 modules (12 accelerator cells), 264 SSPP Line Replaceable Units (LRUs), global controls, data acquisition, and a subset of the downstream transport, Table 1. This was chosen because it provides the minimum accelerator cells required to measure the Beam Break-Up (BBU) instability and perform measurements required to validate the ASD beam transport computer models, which are priority measurements for commissioning.

43 PARTICLE ACCELERATORS↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

Integrated Test Stand

Explore the source record for details and available documents.

43 PARTICLE ACCELERATORS↗

Scorpius and The Integrated Test Stand [Slides]

Scorpius will provide (DARHT scale) flash-radiography of dynamic nuclear material. DARHT radiographs non-nuclear (surrogate) materials at a cadence of 8 to 10 hydrodynamic shots per year. Scorpius will radiograph nuclear material at an initial cadence of about 2 to 3 subcritical shots per year in a more challenging environment. Both machines are Linear Induction Accelerators (LIAs) and generate X-rays with high-current, relativistic electron beams. Their use is termed Flash-Radiography.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Using containers to speed up development, to run integration tests and to teach about distributed systems

GlideinWMS is a workload manager provisioning resources for many experiments including CMS and DUNE. The software is distributed both as native packages and specialized production containers. Following an approach used in other communities like web development we built our workspaces, system-like containers to ease development and testing. Developers can change the source tree or check out a different branch and quickly reconfigure the services to see the effect of their changes. In this paper, we’ll talk about what differentiates workspaces from other containers. We’ll describe our base system composed of three containers. A one-node cluster including a compute element and a batch system. A GlideinWMS Factory controlling pilot jobs. And a scheduler and Frontend, to submit jobs and provision resources. Additional containers can be used for optional components. This system can easily run on a laptop and we’ll share our evaluation of different container runtimes, with an eye for ease of use and performance. Finally, we’ll talk about our experience as developers and with students. The GlideinWMS workspaces are easily integrated with IDEs like VS Code, simplifying debugging and allowing development and testing of the system also when offline. They simplified the training and onboarding of new team members and Summer interns. And they were useful in workshops where students could have first-hand experience with the mechanisms and components that, in production, run millions of jobs.

Mambelli, Marco↗

Using Containers to Speed Up Development, to Run Integration Tests and to Teach About Distributed Systems

GlideinWMS is a workload manager provisioning resources for many experiments, including CMS and DUNE. The software is distributed both as native packages and specialized production containers. Following an approach used in other communities like web development, we built our workspaces, system-like containers to ease development and testing. Developers can change the source tree or check out a different branch and quickly reconfigure the services to see the effect of their changes. In this paper, we will talk about what differentiates workspaces from other containers. We will describe our base system, composed of three containers: a one-node cluster including a compute element and a batch system, a GlideinWMS Factory controlling pilot jobs, and a scheduler and Frontend to submit jobs and provision resources. Additional containers can be used for optional components. This system can easily run on a laptop, and we will share our evaluation of different container runtimes, with an eye for ease of use and performance. Finally, we will talk about our experience as developers and with students. The GlideinWMS workspaces are easily integrated with IDEs like VS Code, simplifying debugging and allowing development and testing of the system even when offline. They simplified the training and onboarding of new team members and summer interns. And they were useful in workshops where students could have first-hand experience with the mechanisms and components that, in production, run millions of jobs.

Mambelli, Marco [Fermilab] (ORCID:0000000294892681↗

Proton Dynamics Scenarios in the Integrable Optics Test Accelerator (IOTA) at Fermilab

The Integrable Optics Test Accelerator (IOTA) at Fermilab provides a versatile platform for studying the interplay of space-charge, impedance, and non-linear optics in high-intensity hadron beams within synchrotrons and storage rings. This report examines the parameters and dynamics of 2.5~MeV proton beam operations in two configurations of the bare IOTA lattice: one for demonstrating Non-linear Integrable Optics with the Danilov-Nagaitsev magnet, and the other for use with electron cooling. We offer order-of-magnitude estimates of the transverse emittance growth rate as a function of beam intensity, highlighting contributions from residual gas scattering, intra-beam scattering, and space-charge effects. Under nominal conditions, the beam lifetime is projected to be less than 7~minutes at low intensity with the current vacuum quality, and fewer than 100,000~turns at high intensity due to strong space-charge effects. The calculations presented here will guide strategies to mitigate emittance growth and inform future IOTA experiments.

43 PARTICLE ACCELERATORS↗

Design of Ionization Profile Monitors at the Integrable Optics Test Accelerator Facility at Fermilab

The Integrable Optics Test Accelerator (IOTA) at Fermilab is transitioning from an electron beam facility to a proton beam facility for studies in nonlinear accelerator optics and space-charge dominated proton beams. This project involves the commissioning and fabrication of Ionization Profile Monitors (IPMs) to enable beam profile measurements at IOTA. In general, IPMs work on principle of residual gas ionization by the beam to generate beam profile. This work focuses on a mechanical design that leverages a controlled injection of noble gases, primarily Argon, as the ultra-high vacuum of the IOTA ring provides insufficient residual gas for ionization. Efforts to understand vacuum integration to ensure compatibility with the storage ring environment, the integration of real-time data acquisition systems and the commissioning of the IPMs will be discussed. This project provides a versatile diagnostic tool, supporting IOTA’s role as a testbed for larger-scale accelerator facilities and contributing to the broader understanding of beam physics in high-intensity, high-space-charge regimes.

Mwaniki, M. W. [IIT, Chicago] (ORCID:0000000169057↗

Nonlinear Tune-Shift Measurements in the Integrable Optics Test Accelerator

The first experimental run of Fermilab’s Integrable Optics Test Accelerator (IOTA) ring aimed at testing the concept of nonlinear integrable beam optics. In this report we present the preliminary results of the studies of a nonlinear focusing system with two invariants of motion realized with the special elliptic-potential magnet. The key measurement of this experiment was the horizontal and vertical betatron tune shift as a function of transverse amplitude. A vertical kicker strength was varied to change the betatron amplitude for several values of the nonlinear magnet strength. The turn-by-turn positions of the 100 MeV electron beam at twenty-one beam position monitors around the ring were captured and used for the analysis of phase-space trajectories.

43 PARTICLE ACCELERATORS↗

Design of a compact, cryogen-free superconducting solenoid for the electron lens of the Fermilab Integrable Optics Test Accelerator (IOTA)

The proposed electron lens for Fermilab's Integrable Optics Test Accelerator (IOTA) will broaden its capabilities by enabling new research in nonlinear integrable optics, space-charge compensation, proton beam cooling, and more. The electron lens is based on a 5–10 keV, 1–2 A electron beam, shaped using a 0.7 m long, 0.8 T solenoidal magnetic field. A cryogen-free superconducting solenoid has been designed to provide this solenoidal field, taking into consideration the constraints on space, utilities, and infrastructure in the IOTA experimental hall. The solenoid is made of copper stabilized niobium-titanium conductor, conduction-cooled using 4 K closed-cycle cryocoolers. This paper describes the overall design of the solenoid encompassing its mechanical construction, current leads optimization, cryogenic thermal modeling that provides estimates of cooldown time and static/dynamic heat loads, and quench analysis.

43 PARTICLE ACCELERATORS↗

UNIFI 1-MW Multi-Vendor Grid-Forming Inverter Test Updates

This presentation gives an update on UNIFI 1MW multi-vendor GFM inverter testing. The 1MW demo enters the last stage of the test, which is the integration test. And the main objectives of the integration tests include: 1) explore the interoperability of dispatching a future grid with energy mix (GFM inverters, GFL inverters and synchronous machine). The presentation highlights one example test, ROCOF, and summarizes all the key learning.

24 POWER TRANSMISSION AND DISTRIBUTION↗