Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN

Cyber-Informed Engineering (CIE) Guide for States

The Cyber-Informed Engineering (CIE) Guide for States provides state energy offices, public utility commissions, and partner organizations with a structured framework for integrating cyber-resilient engineering practices into energy planning, grantmaking, interconnection processes, and workforce development. As grid digitalization and the adoption of distributed energy resources accelerate, states face expanding cyber-physical risks that traditional cybersecurity measures alone cannot fully address. CIE offers a proactive, consequence-focused engineering methodology that emphasizes eliminating or mitigating high-impact failure modes through design, physical controls, and operational safeguards. The guide outlines the 12 core CIE principles, demonstrates their application through state-focused use cases—including grant evaluation rubrics, interconnection reviews, allow-list development, and training programs—and provides practical tools such as scoring frameworks, impact assessment methods, and implementation checklists. It also highlights pathways for state–utility collaboration and opportunities for technical assistance from national laboratories. By adopting CIE, states can enhance grid reliability, reduce lifecycle costs, strengthen supply-chain assurance, and foster a security-aware engineering culture that aligns with broader resilience and modernization goals. November 2025

29 ENERGY PLANNING, POLICY, AND ECONOMY

Cyber-Informed Engineering (CIE) Guide for States

The Cyber-Informed Engineering (CIE) Guide for States provides state energy offices, public utility commissions, and partner organizations with a structured framework for integrating cyber-resilient engineering practices into energy planning, grantmaking, interconnection processes, and workforce development. As grid digitalization and the adoption of distributed energy resources accelerate, states face expanding cyber-physical risks that traditional cybersecurity measures alone cannot fully address. CIE offers a proactive, consequence-focused engineering methodology that emphasizes eliminating or mitigating high-impact failure modes through design, physical controls, and operational safeguards. The guide outlines the 12 core CIE principles, demonstrates their application through state-focused use cases—including grant evaluation rubrics, interconnection reviews, allow-list development, and training programs—and provides practical tools such as scoring frameworks, impact assessment methods, and implementation checklists. It also highlights pathways for state–utility collaboration and opportunities for technical assistance from national laboratories. By adopting CIE, states can enhance grid reliability, reduce lifecycle costs, strengthen supply-chain assurance, and foster a security-aware engineering culture that aligns with broader resilience and modernization goals. November 2025

29 - ENERGY PLANNING, POLICY AND ECONOMY

Grid connection barriers to renewable energy deployment in the United States

Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION

Real-Time Multiregional Market-to-Market Congestion Management Through Exchange of Relief Cost Curve

This paper introduces a novel method for multiregional market-to-market (M2M) coordinated congestion management. It identifies shortcomings in existing M2M approaches, where Regional Transmission Organizations (RTOs) exchange shadow prices and relief requests to optimize congestion relief allocations across interconnected regions. Two methods are proposed to enhance flow and price convergence. The first method proposes that both Regional Transmission Organizations (RTOs) use state-estimator flows directly to determine relief requirements, eliminating delays and potential oscillations caused by using market flows calculated from the prior period under existing M2M approach. The second method involves exchanging transmission relief cost curves, enabling each RTOs to integrate other RTOs' relief costs curve into its real-time security-constrained economic dispatch (SCED). This method can effectively extend the coordination to multiple transmission lines and across more than two RTOs. The alternating direction method of multipliers (ADMM) is also applied to the M2M coordination problem and compared with the proposed methods. Case studies on small and large-scale systems demonstrate the effectiveness of these approaches.

24 POWER TRANSMISSION AND DISTRIBUTION

Real-Time Testbed for Studying Cyberattacks and Defense in DER-integrated Smart Inverter Systems

In this paper, we propose a Hardware-in-the-Loop (HIL) simulation testbed suitable for the implementation and testing of realistic cyberattacks on grid-tied smart inverter systems integrated with Distributed Energy Resources (DER) that use the Distributed Network Protocol-3 (DNP3) protocol for communications between grid components. Specifically, our testbed combines a Real-Time Digital Simulator (RTDS) NovaCor device, outfitted with GNETx2 network interface cards, a gridtied DER topology implemented via the RTDS software package RSCAD, and a custom virtual network that emulates a man in the middle attacker. The Man-in-the-Middle (MITM) attacker captures DNP3 traffic and falsifies telemetry data in DNP3 packets to trigger unwarranted commands from a DNP3 controller that exploit smart inverter grid support functions. We choose DNP3 and implement grid support functions according to the IEEE Std. 1547-2018 mandated for the interconnection and interoperability of DER power systems with associated power components. Furthermore, we develop a protocol payload agnostic attack detection framework that leverages the round-trip time (RTT) anomalies between DNP3 requests and responses and can detect the presence of attacks without having to analyze the payload’s contents, while balancing trade-offs between false alarm counts, missed detections, and time to detection. To facilitate further research, we publicly release benign and attack network traffic exchanged between various sensors, controllers, and actuators in our grid-tied inverter testbed.

24 POWER TRANSMISSION AND DISTRIBUTION