Effects of voltage control in utility interactive dispersed storage and generation systems

When a small generator is connected to the distribution system, the voltage at the point of interconnection is determined largely by the system and not the generator. The effect on the generator, on the load voltage and on the distribution system of a number of different voltage control strategies in the generator is examined. Synchronous generators with three kinds of exciter control are considered, as well as induction generators and dc/ac inverters, with and without capacitor compensation. The effect of varying input power during operation (which may be experienced by generators based on renewable resources) is explored, as well as the effect of connecting and disconnecting the generator at ten percent of its rated power. Operation with a constant slightly lagging factor is shown to have some advantages.

Kirkham, H.↗

Efficient transfer of images over networks

Effective remote observing requires sending large images over long distances. The usual approach to the transfer problem is to require high bandwidth transmission links, which are expensive to install and operate. An alternative approach is to use existing low-bandwidth connections, such as phone lines or the Internet, in a highly efficient manner by compressing the images. The combined use of existing low-cost infrastructure and standard networking software means that remote observing can be made practical even for small observatories with limited network resources. The authors have implemented such a scheme based on the H-transform compression method developed for astronomical images, which are often resistant to compression because they are noisy. The H-transform can be used for either lossy or lossless compression, and compression factors of at least 10 can be achieved with no noticeable losses in the astrometric or photometric properties of the compressed images. The H-transform allows us to organize the information in an image so that the 'useful' information can be sent first, followed by the noise, which makes up the bulk of the transmission. The receiver can invert a partially received set of H-coefficients, creating an image that improves with time. The H-transform is particularly well-suited to this style of incremental reconstruction, because the spatially localized nature of the basis functions of the H-transorm prevents the appearance of artifacts such as ringing around point sources and edges. The authors' implementation uses the WIYN Telescope Control System's TCP-based communications protocol. An 800x800 16-bit astronomical image was sent over a 2400 baud connection, which would normally take about 71 minutes; after only 60 seconds, the partially received H-transform produced an image that did not differ appreciably from the original. This poster presents a quantification of the efficiencies, as well as examples of images reconstructed from partial data.

Percival, J. W.↗

Development of a funding, cost, and spending model for satellite projects

The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

Johnson, Jesse P.↗