Search NASA⌕ Search

SEARCH · Search NASA

Results for “James Web Space Telescope (JWST)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Magnetic Characterization of Micro Shutters for James Web Space Telescope (JWST)

Summary of Research that was part of the grant: NASA NAG5 - 13405: Magnetic Characterization of Micro Shutters for James Web Space Telescope (JWST) Period: May 1 2003-October 31 2005 The above funding resulted in following major achievements related to microshutter system for JWST. 1. The original rectangular pattern of magnetic material was changed into magnetic striped pattern to prevent unnecessary twisting during the actuation. The Original geometry favored magnetic remanence vector being oriented along the longer side of the shutter and thus resulting torque caused out of plane twist. Stripe pattern minimizes the out of plane motion and thus prolongs the life-time of microshutter device. 2. We built a new magnetic system (magnetic rotisserie) allowing an accelerated life test of microshutters at various temperatures. This system identified that shutter are capable to withstand as many as several millions of actuating cycles. Our system also identified fabrication related features, like bowing with temperature, collisions with the frame due to misalignment, delaminating of the light shields due to uncontrolled voltage release and poorly fabricated light shields.

Wasilewski, P.↗

STOP Modeling for the JWST: Techniques, Results, and Sensitivities

The James Web Space Telescope (JWST) is a large, infrared-optimized, space telescope scheduled for launch to L2 in 2011. It must meet rigorous thermal stability requirements, almost all of which will be verified through analysis. Terrestrial testing will be performed but even that will require significant analytical interpretation of results. Preliminary analysis indicates that traditional second-order effects could cause the telescope to exceed established performance requirements. This leads to very large detailed models, primarily since composite tubes are being modeled using solid elements. To minimize differences between the current baseline and the model the project is using a number of rapid analysis cycles. The large size of the telescope models and the short cycle time creates a demanding multidisciplinary analysis environment.

John D. Johnston↗

Systems Engineering on the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2014. System-level verification of critical performance requirements will rely on integrated observatory models that predict the wavefront error accurately enough to verify that allocated top-level wavefront error of 150 nm root-mean-squared (rms) through to the wave-front sensor focal plane is met. This paper describes the systems engineering approach used on the JWST through the detailed design phase.

Menzel, Michael T.↗

Integrated Modeling Activities for the James Webb Space Telescope: Structural-Thermal-Optical Analysis

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. This is a continuation of a series of papers on modeling activities for JWST. The structural-thermal-optical, often referred to as STOP, analysis process is used to predict the effect of thermal distortion on optical performance. The benchmark STOP analysis for JWST assesses the effect of an observatory slew on wavefront error. Temperatures predicted using geometric and thermal math models are mapped to a structural finite element model in order to predict thermally induced deformations. Motions and deformations at optical surfaces are then input to optical models, and optical performance is predicted using either an optical ray trace or a linear optical analysis tool. In addition to baseline performance predictions, a process for performing sensitivity studies to assess modeling uncertainties is described.

Johnston, John D.↗

The Role of Integrated Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. System-level verification of critical optical performance requirements will rely on integrated modeling to a considerable degree. In turn, requirements for accuracy of the models are significant. The size of the lightweight observatory structure, coupled with the need to test at cryogenic temperatures, effectively precludes validation of the models and verification of optical performance with a single test in 1-g. Rather, a complex series of steps are planned by which the components of the end-to-end models are validated at various levels of subassembly, and the ultimate verification of optical performance is by analysis using the assembled models. This paper describes the critical optical performance requirements driving the integrated modeling activity, shows how the error budget is used to allocate and track contributions to total performance, and presents examples of integrated modeling methods and results that support the preliminary observatory design. Finally, the concepts for model validation and the role of integrated modeling in the ultimate verification of observatory are described.

Mosier, Gary E.↗

Lessons Learned Implementing DOORS in a Citrix Environment

NASA's James Web Space Telescope (JWST) Project is a large multi-national project with geographically dispersed contractors that all need access to the Projects requirement database. Initially, the project utilized multiple DOORS databases with the built-in partitions feature to exchange modules amongst the various contractor sites. As the requirements databases matured the use of partitions became extremely difficult. There have been many issues such as incompatible versions of DOORS, inefficient mechanism for sharing modules, security concerns, performance issues, and inconsistent document import and export formats. Deployment of the client software with limited IT resources available was also an issue. The solution chosen by JWST was to integrate the use of a Citrix environment with the DOORS database to address most of the project concerns. The use of the Citrix solution allowed a single Requirements database in a secure environment via a web interface. The Citrix environment allows JWST to upgrade to the most current version of DOORS without having to coordinate multiple sites and user upgrades. The single requirements database eliminates a multitude of Configuration Management concerns and facilitated the standardization of documentation formats. This paper discusses the obstacles and the lessons learned throughout the installation, implementation, usage and deployment process of a centralized DOORS database solution.

Bussman, Marie↗

Applications of ANSYS/Multiphysics at NASA/Goddard Space Flight Center

This viewgraph presentation reviews some of the uses that the ANSYS/Multiphysics system is used for at the NASA Goddard Space Flight Center. Some of the uses of the ANSYS system is used for is MEMS Structural Analysis of Micro-mirror Array for the James Web Space Telescope (JWST), Micro-shutter Array for JWST, MEMS FP Tunable Filter, AstroE2 Micro-calorimeter. Various views of these projects are shown in this presentation.

Loughlin, Jim↗

An Update on the Role of Systems Modeling in the Design and Verification of the James Webb Space Telescope

The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2014. System-level verification of critical performance requirements will rely on integrated observatory models that predict the wavefront error accurately enough to verify that allocated top-level wavefront error of 150 nm root-mean-squared (rms) through to the wave-front sensor focal plane is met. The assembled models themselves are complex and require the insight of technical experts to assess their ability to meet their objectives. This paper describes the systems engineering and modeling approach used on the JWST through the detailed design phase.

Muheim, Danniella↗

Science at the Goddard Space Flight Center

The Sciences and Exploration Directorate of the NASA Goddard Space Flight Center (GSFC) is the largest Earth and space science research organization in the world. Its scientists advance understanding of the Earth and its life-sustaining environment, the Sun, the solar system, and the wider universe beyond. Researchers in the Sciences and Exploration Directorate work with engineers, computer programmers, technologists, and other team members to develop the cutting-edge technology needed for space-based research. Instruments are also deployed on aircraft, balloons, and Earth's surface. I will give an overview of the current research activities and programs at GSFC including the James Web Space Telescope (JWST), future Earth Observing programs, experiments that are exploring our solar system and studying the interaction of the Sun with the Earth's magnetosphere.

White, Nicholas E.↗

Mission Configuration Tree for the James Webb Space Telescope (JWST)

The GSFC Mission Configuration web-based application is a means of documenting the structure of the many elements used in building each mission that NASA launches, as well as archiving the documents associated with each of these elements and keeping track of suppliers. This includes all available drawings, engineering orders, parts lists, block diagrams, and photos of each system, subsystem, and component. While the information for several of NASA's missions is being input into Mission Configuration, the ten weeks of this project focused on collecting information for the instrument systems of the James Webb Space Telescope. Documents were collected from a database called the Next Generation Integrated Network (NGIN) so that they can eventually be uploaded into the application. From these documents, including drawings and parts lists, a configuration tree was created in Microsoft Visio which showed the relationships between each system, subsystem, and component. When both these documents and the configuration tree are input into Mission Configuration, they will be place into a drill down tree structure, from which drawings and documents can be accessed directly. Mission Configuration also includes search functions that make all parts searchable by keywords such as vendor, part number, taxonomy, and alternate nomenclature. This application is an important resource for providing access to documents related to the components used on each mission. It has created a central repository for information which can be used to benefit Safety & Mission Assurance, but may also be useful across codes. The process of collecting the information and documents to put into Mission Configuration is also allowing for a concise breakdown of information from diverse formats, creating standardization which makes information more readily accessible, while retaining project-specific information that makes it more easily searchable.

Cain, Mary C.↗

Elastic Distribution of Microshutters, Measurements Obtainable on James Web Space Telescope

Spectrographic astronomy measurements in the near-infrared region will be done by functional two-dimensional microshutter arrays that are being fabricated at the NASA Goddard Space Flight Center for the James Webb Space Telescope (JWST). These micro-shutter arrays will represent the first mission-critical MEMS devices to be flown in space. JWST will use microshutter arrays to select focal plane object. 2-D programmable aperture masks of more than 200,000 elements select such space object. The use of silicon wafer material promises high efficiency and high contrast. Microshutter operation temperature is around 35K. Microshutter arrays are fabricated as close-packed silicon nitride membranes with a unit cell size of 105 x 204 micrometers. A layer of magnetic material is deposited onto each shutter. Individual shutters are equipped with a torsion flexure. Reactive ion etching (RIE) releases the shutters so they can open up to 90 degrees using the torsion flexure. Shutter rotation is initiated into a silicon support structure via an external magnetic field. Two electrically independent aluminum electrodes are deposited, one onto each shutter and another onto the support structure side-wall, permitting electrostatic latching and 2-D addressing to hold specific shutters open via external electronics.

Kletetschka, Gunther↗

Independent Testing of JWST Detector Prototypes

The Independent Detector Testing Laboratory (IDTL) is jointly operated by the Space Telescope Science Institute (STScI) and the Johns Hopkins University (JHU), and is assisting the James Webb Space Telescope (JWST) mission in choosing and operating the best near-infrared detectors. The JWST is the centerpiece of the NASA Office of Space Science theme, the Astronomical Search for Origins, and the highest priority astronomy project for the next decade, according to the National Academy of Science. JWST will need to have the sensitivity to see the first light in the Universe to determine how galaxies formed in the web of dark matter that existed when the Universe was in its infancy (z is approximately 10-20). To achieve this goal, the JWST Project must pursue an aggressive technology program and advance infrared detectors to performance levels beyond what is now possible. As part of this program, NASA has selected the IDTL to verify comparative performance between prototype JWST detectors developed by Rockwell Scientific (HgCdTe) and Raytheon (InSb). The IDTL is charged with obtaining an independent assessment of the ability of these two competing technologies to achieve the demanding specifications of the JWST program within the 0.6-5 micron bandpass and in an ultra-low background (less than 0.01 e(-)/s/pixel) environment. We describe results from the JWST Detector Characterization Project that is being performed in the LDTL. In this project, we are measuring first-order detector parameters, i.e. dark current, read noise, QE, intra-pixel sensitivity, linearity, as functions of temperature, well size, and operational mode.

Figer, Donald F.↗

Independent Testing of JWST Detector Prototypes

The Independent Detector Testing Laboratory (IDTL) is jointly operated by the Space Telescope Science Institute (STScI) and the Johns Hopkins University (MU), and is assisting the James Webb Space Telescope (JWST) mission in choosing and operating the best near-infrared detectors under a NASA Grant. The JWST is the centerpiece of the NASA Office of Space Science theme, the Astronomical Search for Origins, and the highest priority astronomy project for the next decade, according to the National Academy of Science. JWST will need to have the sensitivity to see the first light in the Universe to determine how galaxies formed in the web of dark matter that existed when the Universe was in its infancy (z approx. 10 - 20). To achieve this goal, the JWST Project must pursue an aggressive technology program and advance infrared detectors to performance levels beyond what is now possible. As part of this program, NASA has selected the IDTL to verify comparative performance between prototype JWST detectors developed by Rockwell Scientific (HgCdTe) and Raytheon (InSb). The IDTL is charged with obtaining an independent assessment of the ability of these two competing technologies to achieve the demanding specifications of the JWST program within the 0.6 - 5 approx. mum bandpass and in an ultra-low background (less than 0.01 e'/s/pixel) environment. We describe results from the JWST Detector Characterization Project that is being performed in the IDTL. In this project, we are measuring first-order detector parameters, i.e. dark current, read noise, QE, intra-pixel sensitivity, linearity, as functions of temperature, well size, and operational mode.

Figer, D. F.↗

Building access and community standards for opacity data at the onset of next-generation atmosphere observations

The characterization of a diverse set of exoplanet atmosphere observations, ranging from hot gas giants to small temperate rocky worlds, will be one of the legacies of upcoming facilities such as the James Webb Space Telescope (JWST). Our understanding and interpretation of such observations will hinge on our ability to link observations with atmospheric theoretical studies that critically rely on fundamental molecular and atomic opacities. Computing such opacities is a highly non-trivial and inaccessible process which requires several terabytes of available disk space, hours of CPU time per pressure-temperature combination, and requires users to carefully aggregate line lists data from various sources, which limits access and intercomparison of opacity data in the exoplanet community. Here we present MAESTRO (Molecules and Atoms in Exoplanet Science: Tools and Resources for Opacities) an opacity database that can be accessed by the community via a web interface and python API. MAESTRO was built with community input to create a version-controlled opacity database that is easily queryable, includes informative metadata to ensure reproducibility, and exports relevant citations for inclusion in publications. Scheduled for community release in 2022, MAESTRO will prove to be an invaluable community resource in the era of JWST and beyond.

Natasha Batalha↗