Search NASA⌕ Search

SEARCH · Search NASA

Results for “Job scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

SchedInspector: A Batch Job Scheduling Inspector Using Reinforcement Learning

Improving the performance of job executions is an important goal of HPC batch job schedulers, such as minimizing job waiting time, slowdown, or completion time. Such a goal is often accomplished using carefully designed heuristics based on job features, such as job size and job duration. However, these heuristics overlook important runtime factors (e.g., cluster availability and waiting job patterns), which may vary across time and make a previously sound scheduling decision not hold any longer. In this study, we propose a new approach to incorporate runtime factors into batch job scheduling for better job execution performance. The key idea is to add a scheduling inspector on top of the base job scheduler to scrutinize its scheduling decisions. The inspector will take the runtime factors into consideration and accordingly determine the fitness of the scheduled job. It then either accepts the scheduled job or rejects it and asks the base schedulers to try again later. We realize such an inspector, namely SchedInspector, by leveraging the intelligence of reinforcement learning. Through extensive experiments, we show SchedInspector can intelligently integrate the runtime factors into various batch job scheduling policies, including the state-of-the-art one, to gain better job execution performance, such as smaller average bounded job slowdown (up to 69% better) or average job waiting time (up to 52% better), across various real-world workloads. We also show that although rejecting scheduling decisions may leave the resources idle hence affect the system utilization, SchedInspector is able to achieve the job execution performance improvement with marginal impact on the system utilization (typically less than 1%). We consider one key advantage of SchedInspector is it automatically learns to work with and improve existing job scheduling policies without changing them, which makes it promising to serve as a generic enhancer for various batch job scheduling policies.

Zhang, Di↗

RLScheduler: An Automated HPC Batch Job Scheduler Using Reinforcement Learning

Today’s high-performance computing (HPC) platforms are still dominated by batch jobs. Accordingly, effective batch job scheduling is crucial to obtain high system efficiency. Existing HPC batch job schedulers typically leverage heuristic priority functions to prioritize and schedule jobs. But, once configured and deployed by the experts, such priority functions can hardly adapt to the changes of job loads, optimization goals, or system settings, potentially leading to degraded system efficiency when changes occur. To address this fundamental issue, we present RLScheduler, an automated HPC batch job scheduler built on reinforcement learning. RLScheduler relies on minimal manual interventions or expert knowledge, but can learn high-quality scheduling policies via its own continuous ‘trial and error’. We introduce a new kernel-based neural network structure and trajectory filtering mechanism in RLScheduler to improve and stabilize the learning process. Through extensive evaluations, we confirm that RLScheduler can learn high-quality scheduling policies towards various workloads and various optimization goals with relatively low computation cost. Moreover, we show that the learned models perform stably even when applied to unseen workloads, making them practical for production use.

Zhang, Di↗

Alternative mixed integer linear programming optimization for joint job scheduling and data allocation in grid computing

This paper presents a novel approach to the joint optimization of job scheduling and data allocation in grid computing environments. We formulate this joint optimization problem as a mixed integer quadratically constrained program. To tackle the nonlinearity in the constraint, we alternatively fix a subset of decision variables and optimize the remaining ones via Mixed Integer Linear Programming (MILP). We solve the MILP problem at each iteration via an off-the-shelf MILP solver. Our experimental results show that our method significantly outperforms existing heuristic methods, employing either independent optimization or joint optimization strategies. We have also verified the generalization ability of our method over grid environments with various sizes and its high robustness to the algorithm setting.

97 MATHEMATICS AND COMPUTING↗

MARBLE: A Multi-GPU Aware Job Scheduler for Deep Learning on HPC Systems

Deep learning (DL) has become a key tool for solving complex scientific problems. However, managing the multi-dimensional large-scale data associated with DL, especially atop extant multiple graphics processing units (GPUs) in modern supercomputers poses significant challenges. Moreover, the latest high-performance computing (HPC) architectures bring different performance trends in training throughput compared to the existing studies. Existing DL optimizations such as larger batch size and GPU locality-aware scheduling have little effect on improving DL training throughput performance due to fast CPU-to-GPU connections. Additionally, DL training on multiple GPUs scales sublinearly. Thus, simply adding more GPUs to a system is ineffective. To this end, we design MARBLE, a first-of-its-kind job scheduler, which considers the non-linear scalability of GPUs at the intra-node level to schedule an appropriate number of GPUs per node for a job. By sharing the GPU resources on a node with multiple DL jobs, MARBLE avoids low GPU utilization in current multi-GPU DL training on HPC systems. Our comprehensive evaluation in the Summit supercomputer shows that MARBLE is able to improve DL training performance by up to 48.3% compared to the popular Platform Load Sharing Facility (LSF) scheduler. Compared to the state-of-the-art of DL scheduler, Optimus, MARBLE reduces the job completion time by up to 47%.

Han, Jingoo↗

Job Scheduler-Driven Power Gateway for High Performance Computing

Power gateways in the form of a microgrid can incorporate multiple distributed energy resources (DER) in either grid forming or grid following mode and support high performance computing (HPC) power profiles including the large load-follow requirements observed in multi-user HPC systems. The microgrid’s flexibility to operate in either grid forming or grid following mode and to actively switch between these modes enables baseline power from multiple non-baseline DER while maintaining high power quality metrics for the HPC system. But this enormous flexibility in demand response and time of use shifting is generally programmed independently of any integration with an HPC job scheduler which can better inform the load shaping by the microgrid. While there are many existing approaches where the HPC job scheduler takes in information from the grid to make queue scheduling decisions, this work takes the opposite view and explores a scheduler where the jobs in the queue can directly impact the settings of the grid. Several HPC scheduler strategies are tested where the jobs in the queue directly impact the settings of a microgrid designed for HPC operation which is driving a datacenter with three classes of HPC architectures. The scheduler operation is shown using a microgrid with 64 kW of solar capacity and 320 kWh of battery over a period of 21 days operating with significant low-follow swings, a throttled grid, cloudy conditions, switching between grid following and grid forming modes, and a wide range of battery states-of-charge all while maintaining high quality power metrics. The scheduler provides a mechanism for the job queue to directly impact a power gateway like a microgrid and to improve HPC power outcomes such as maximizing renewable energy usage

microgrid↗

SMC 2021 Data Challenge: Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU: RUR dataset is the job scheduler traces collected from the Titan supercomputer from 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected using resource Utilization Report (RUR), a Cray-developed resource-usage data collection and reporting system. It contains the usage information of its critical resources (CPU, Memory, GPU, and I/O) of each running job on Titan during that period (https://ieeexplore.ieee.org/abstract/document/8891001). It includes ProjectAreas as additional information, every job is associated with a project ID. TheProjectAreas.csv dataset provides a mapping of the project ID to its domain science. GPU dataset has information regarding GPU failure on Titan. There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has seven attributes, we provided a short description of these attributes in the ReadMe file. To learn more about this dataset, please refer to the git repository https://github.com/olcf/TitanGPULife and the related publication (https://ieeexplore.ieee.org/abstract/document/9355319).

42 ENGINEERING↗

Minimizing total energy cost and tardiness penalty for a scheduling-layout problem in a flexible job shop system: A comparison of four metaheuristic algorithms

Job scheduling and machine layout are interrelated in improving energy consumption (EC) and productivity measures such as tardiness and represent two important decisions that must be made by manufacturers. This interdependency can be explained by transportation time, which connects scheduling and layout. Scheduling and layout, however, have not been thoroughly studied in conjunction using an integrated model in the context of sustainable manufacturing. Hence, we propose an energy-aware optimization model in which scheduling is integrated with layout in a single-level framework. More specifically, a single objective function is defined to minimize the facility energy cost and the job tardiness penalty, which control EC and tardiness respectively in a flexible job shop system. In order to model machine EC more accurately, we also consider three different machine states: a processing state and two idle states. Our case studies show that the integrated model exhibits better performance in controlling manufacturing EC and job tardiness than a non-integrated model in which machine locations are uncontrollable and transportation times between machines are unchangeable. To deal with large-sized problems, we also introduce four new metaheuristics. The performances of these new metaheuristics are compared in terms of objective function values and CPU times using various case studies. The results indicate that a hybrid ant colony optimization and simulated annealing (ACO-SA) algorithm provides better performance than the other algorithms. Specifically, our case studies show that the integrated model using ACO-SA can improve the objective function value by around 5% when compared to the non-integrated model.

42 ENGINEERING↗

Quantum/AI Topology-Aware Latency-Adaptive HPC Workflow Scheduling Optimization

The growing demand for more powerful high-performance computing (HPC) systems has led to a steady rise in energy consumption by supercomputing worldwide. This study is focused on comparing our Application-Topology Mapper (ATMapper) to the popular Simple Linux Utility for Resource Management (SLURM) for the purpose of exploring methods that can further optimize job-scheduling within HPC systems. ATMapper is an Artificial-Intelligence based approach to job-scheduling that is currently being enhanced with quantum annealing (QA) to generate optimal schedules faster. We are applying QA to speedup our ATMapper process to achieve higher computing efficiency, thereby reducing HPC energy consumption. Here, we examine how four job-scheduling approaches perform in processor node assignment when using an example network architecture of 4 interconnected nodes. Using a specialized script, we are assessing the schedule of a computation flow with 11 interdependent tasks. The data movements among nodes were tracked to count for the number of interactions (network hops) between nodes needed to complete the tasks. The total number of hops and the job completion time were then used to quantify the efficiency of the different mapping approaches. In addition to SLURM, we also compare our ATMapper to the QA-enabled LBNL TIGER and the D-Wave Distributed Computing processor assignment approaches. The preliminary results showed that our topology-aware, latency-adaptive ATMapper is significantly more efficient when compared to the other scheduling approaches due to its load-imbalance network allocation. The scheduler displayed a computing efficiency of 53% by performing significantly fewer network hops than its alternatives. By reducing the number of hops, ATMapper was able to perform all 11 tasks by using only 3 nodes out of given 4. This research indicates the potential to use QA/AI for HPC job-scheduling. Later, we will test a SLURM simulator program to draw further comparisons on the effectiveness of ATMapper's scheduling approach. The results of this comparison will serve as a baseline for later improving SLURM's performance using a QA-enhanced ATMapper approach.

Caraveo, Braulio [University of Huston - Clear Lak↗

SMC 2021 : Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU. RUR: This dataset is the job scheduler traces collected from the Titan supercomputerfrom 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected usingResource Utilization Report (RUR), a Cray-developed resource-usage data collectionand reporting system. It contains the usage information of its critical resources (CPU,Memory, GPU, and I/O) of each running job on Titan during that period [2]. ProjectAreas: Every job is associated with a project ID. TheProjectAreas.csvdatasetprovides a mapping of the project ID to its domain science. GPU: There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has the following fields: 1. SN : Serial number of a GPU 2. location : The location where it is installed 3. insert : The time when it was inserted into that location 4. remove : The time when it was removed from that location 5. duration : Amount of time the GPU spent in this location 6. out : If the device was taken out entirely w/o a re-installment into a new location. 7. event : If the GPU was taken out entirely, the reason for its removal. To learn more about this dataset, please refer to the git repositoryhttps://github.com/olcf/TitanGPULifeand the related publication [1]. References [1] George Ostrouchov, Don Maxwell, Rizwan A Ashraf, Christian Engelmann, MallikarjunShankar, and James H Rogers. Gpu lifetimes on titan supercomputer: Survival analysisand reliability. InSC20: International Conference for High Performance Computing,Networking, Storage and Analysis, pages 1-14. IEEE, 2020. [2] Feiyi Wang, Sarp Oral, Satyabrata Sen, and Neena Imam. Learning from five-yearresource-utilization data of titan system. In2019 IEEE International Conference onCluster Computing (CLUSTER), pages 1-6. IEEE, 2019.

42 ENGINEERING↗

Orchestration of materials science workflows for heterogeneous resources at large scale

In the era of big data, materials science workflows need to handle large-scale data distribution, storage, and computation. Any of these areas can become a performance bottleneck. We present a framework for analyzing internal material structures (e.g., cracks) to mitigate these bottlenecks. We demonstrate the effectiveness of our framework for a workflow performing synchrotron X-ray computed tomography reconstruction and segmentation of a silica-based structure. Our framework provides a cloud-based, cutting-edge solution to challenges such as growing intermediate and output data and heavy resource demands during image reconstruction and segmentation. Specifically, our framework efficiently manages data storage, scaling up compute resources on the cloud. The multi-layer software structure of our framework includes three layers. A top layer uses Jupyter notebooks and serves as the user interface. A middle layer uses Ansible for resource deployment and managing the execution environment. A low layer is dedicated to resource management and provides resource management and job scheduling on heterogeneous nodes (i.e., GPU and CPU). At the core of this layer, Kubernetes supports resource management, and Dask enables large-scale job scheduling for heterogeneous resources. The broader impact of our work is four-fold: through our framework, we hide the complexity of the cloud’s software stack to the user who otherwise is required to have expertise in cloud technologies; we manage job scheduling efficiently and in a scalable manner; we enable resource elasticity and workflow orchestration at a large scale; and we facilitate moving the study of nonporous structures, which has wide applications in engineering and scientific fields, to the cloud. While we demonstrate the capability of our framework for a specific materials science application, it can be adapted for other applications and domains because of its modular, multi-layer architecture.

97 MATHEMATICS AND COMPUTING↗

Frontier Job-Centric Telemetry Dataset

Comprehensive analysis of high-performance computing (HPC) systems requires linking workload execution to system behavior. This kind of analysis is vital for diagnosing performance issues, managing capacity, detecting anomalous workloads, and understanding how applications interact with system hardware. This job-centric telemetry dataset unifies scheduler job records with node-level measurements, enabling direct association between workloads and their corresponding power, thermal, and performance characteristics. It contains sanitized, scheduler related metadata for 152,400 individual jobs that ran on the Frontier supercomputer and ended on selected days throughout 2024 and 2025, a subpopulation of ~6.8% of the total number of allocated jobs with non-zero run time on the system over that same period. Each is linked with files that contain telemetry time series records of the power utilization and temperature behavior of its allocated nodes and their processors during the run time of the job. Where available, a portion of the job files also contain network performance time series. Jobs are sampled from select days that reflect normal levels of user activity and possess job size distributions with large numbers of leadership class jobs (>20% of Frontier nodes). Jobs in this dataset attempt to best represent successful user workflows.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Adaptive job and resource management for the growing quantum cloud

As the popularity of quantum computing continues to grow, efficient quantum machine access over the cloud is critical to both academic and industry researchers across the globe. And as cloud quantum computing demands increase exponentially, the analysis of resource consumption and execution characteristics are key to efficient management of jobs and resources at both the vendor-end as well as the client-end. While the analysis and optimization of job / resource consumption and management are popular in the classical HPC domain, it is severely lacking for more nascent technology like quantum computing.This paper proposes optimized adaptive job scheduling to the quantum cloud taking note of primary characteristics such as queuing times and fidelity trends across machines, as well as other characteristics such as quality of service guarantees and machine calibration constraints. Key components of the proposal include a) a prediction model which predicts fidelity trends across machine based on compiled circuit features such as circuit depth and different forms of errors, as well as b) queuing time prediction for each machine based on execution time estimations. Altogether, this proposal is evaluated on simulated IBM machines across a diverse set of quantum applications and system loading scenarios, and is able to reduce wait times by over 3x and improve fidelity by over 40% on specific usecases, when compared to traditional job schedulers.

97 MATHEMATICS AND COMPUTING↗

Queue wait time prediction in high performance computing (HPC) systems

High Performance Computing (HPC) systems are critical enablers for groundbreaking scientific research across various domains. Efficient resource allocation, facilitated by job scheduling, is paramount for maximizing the utilization of HPC systems. However, the variability in wait times for queued jobs poses challenges for users, necessitating accurate job wait time estimation. This paper explores the influence of job characteristics, including job size (the number of nodes requested and walltime), the queue to which the job is submitted and other resource requirements, on job wait times in leadership-class HPC systems. Focusing on the Theta Cray XC40 and Polaris machines at Argonne National Laboratory, the study evaluates the performance of different supervised learning algorithms in predicting job wait times. It also evaluates the impact of data preprocessing, including outlier detection, Principal Component Analysis (PCA), and feature selection, on the performance of wait time prediction models. The findings reveal insights into the relationship between job characteristics and wait times, offering a foundation for optimizing resource allocation and enhancing user experience. The methodologies and tools developed in this study are adaptable to other leadership-class HPC systems, providing a valuable contribution to the broader HPC community aiming to improve job scheduling efficiency and user satisfaction.

Okafor, Nwamaka↗