Search NASA⌕ Search

SEARCH · Search NASA

Results for “Joint Polar Satellite System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Joint Polar Satellite System

The Joint Polar Satellite System (JPSS) is a joint NOAA/NASA mission comprised of a series of polar orbiting weather and climate monitoring satellites which will fly in a sun-synchronous orbit, with a 1330 equatorial crossing time. JPSS resulted from the decision to reconstitute the National Polar-orbiting Operational Environmental Satellite System (NPOESS) into two separate programs, one to be run by the Department of Defense (DOD) and the other by NOAA. This decision was reached in early 2010, after numerous development issues caused a series of unacceptable delays in launching the NPOESS system.

Trenkle, Timothy↗

Integrated Data Modeling and Simulation on the Joint Polar Satellite System Program

The Joint Polar Satellite System is a modern, large-scale, complex, multi-mission aerospace program, and presents a variety of design, testing and operational challenges due to: (1) System Scope: multi-mission coordination, role, responsibility and accountability challenges stemming from porous/ill-defined system and organizational boundaries (including foreign policy interactions) (2) Degree of Concurrency: design, implementation, integration, verification and operation occurring simultaneously, at multiple scales in the system hierarchy (3) Multi-Decadal Lifecycle: technical obsolesce, reliability and sustainment concerns, including those related to organizational and industrial base. Additionally, these systems tend to become embedded in the broader societal infrastructure, resulting in new system stakeholders with perhaps different preferences (4) Barriers to Effective Communications: process and cultural issues that emerge due to geographic dispersion and as one spans boundaries including gov./contractor, NASA/Other USG, and international relationships.

Roberts, Christopher J.↗

Joint Polar Satellite System (JPSS) Micrometeoroid and Orbital Debris (MMOD) Assessment

The Joint Polar Satellite System (JPSS) Project requested the NASA Engineering and Safety Center (NESC) conduct an independent evaluation of the Micrometeoroid and Orbital Debris (MMOD) models used in the latest JPSS MMOD risk assessment. The principal focus of the assessment was to compare Orbital Debris Engineering Model version 3 (ORDEM 3.0) with the Meteoroid and Space Debris Terrestrial Environment Reference version 2009 (MASTER-2009) and Aerospace Debris Environment Projection Tool (ADEPT) and provide recommendations to the JPSS Project regarding MMOD protection. The outcome of the NESC assessment is contained in this report.

Squire, Michael D.↗

Joint Polar Satellite System (JPSS) Instrument Transition to NASA and Development Status

The Joint Polar Satellite System (JPSS) Program is a cooperative program between the National Aeronautics and Space Agency (NASA) and the National Oceanic and Atmospheric Administration (NOAA) to design, develop, and fly the next suite of US civilian polar orbiting environmental sensing instruments. The JPSS Program is a product of the restructuring of the National Polar-orbiting Operational Environmental Satellite System (NPOESS) Program, which occurred in 2010. With the transition to NASA, the JPSS instruments have undergone significant review with numerous updates to the designs as well as made significant progress toward delivering a superior capability to the Nation. This paper will discuss the program transition as it relates to the instruments and the associated transition review efforts, key findings, important changes to the instruments for JPSS and their current development status. The VIIRS instrument will be presented separately.

Brann, Christopher W.↗

The Joint Polar Satellite System (JPSS) Program's Algorithm Change Process (ACP): Past, Present and Future

The Joint Polar Satellite System (JPSS) Program Office is the supporting organization for the Suomi National Polar Orbiting Partnership (S-NPP) and JPSS-1 satellites. S-NPP carries the following sensors: VIIRS, CrIS, ATMS, OMPS, and CERES with instruments that ultimately produce over 25 data products that cover the Earths weather, oceans, and atmosphere. A team of scientists and engineers from all over the United States document, monitor and fix errors in operational software code or documentation with the algorithm change process (ACP) to ensure the success of the S-NPP and JPSS 1 missions by maintaining quality and accuracy of the data products the scientific community relies on. This poster will outline the programs algorithm change process (ACP), identify the various users and scientific applications of our operational data products and highlight changes that have been made to the ACP to accommodate operating system upgrades to the JPSS programs Interface Data Processing Segment (IDPS), so that the program is ready for the transition to the 2017 JPSS-1 satellite mission and beyond.

Joint Polar Satellite System↗

Pre-Launch Performance Trending of Joint Polar Satellite System (JPSS) Advanced Technology Microwave Sounder (ATMS)

The Advanced Technology Microwave Sounder (ATMS) microwave radiometer instrument is utilized on-board NOAA’s Joint Polar Satellite System (JPSS) fleet of spacecraft to perform temperature and water vapor soundings of Earth’s atmosphere. Consisting of 22 channels over a frequency range from 22 to 183 GHz, ATMS provides high-impact observations for numerical weather prediction (NWP) models. A general description of the ATMS instrument is discussed in [1]. There are five ATMS flight units in the polar-orbiting JPSS program; three are currently on-orbit and two are pending launch. The first ATMS was flown on the Suomi National Polar-orbiting Partnership (SNPP) satellite, launched in 2011. The second ATMS was launched on the NOAA-20 (previously JPSS-1) satellite in 2017. The third ATMS was launched on the NOAA-21 (previously JPSS-2) satellite in 2022. The SNPP and NOAA-20 ATMS units are operational. The NOAA-21 ATMS unit is completing on-orbit commissioning and checkout, having achieved provisional maturity status in December 2022 with validated maturity expected in May 2023 [2]. The fourth and fifth ATMS units are planned for the JPSS-3 (launch ~2028) and JPSS-4 (launch ~2032) satellites [3]. This paper will focus on trending performance characteristics of each JPSS ATMS build from the pre-launch activities. Pre-launch trending of some parameters have been previously published up to the JPSS-3 mission [4][5]. This paper differs from and expands the scope of the prior work as it will include all five of the JPSS ATMS builds. The entire suite of JPSS ATMS units have completed their pre-ship instrument-level I&T and verification activities. These activities include a radiometric performance characterization of each instrument. In addition to comparing the performance across builds, the performance will also be compared to requirements and specifications where applicable. The on-orbit performance of the launched units will be excluded from the scope of this paper in order to focus on evaluations that are common across all builds. The post-launch performance of SNPP ATMS is detailed in [1][6][7][8]. The post-launch performance of NOAA-20 ATMS is detailed in [6][8][9]. The pre-launch characterization of the ATMS occurs at both subassembly-level and instrument-level testing. The antenna subsystem is tested at Northrop Grumman’s Compact Antenna Test Range (CATR) in Azusa, CA [9]. This testing characterizes the antenna pattern and the pointing performance of the scan drive mechanism and antenna subsystem. Trended parameters from this evaluation will include beam pointing accuracy, beamwidth, and beam efficiency. These parameters are captured in each instrument’s Calibration Data Book [10]. Instrument-level radiometric performance evaluation is primarily done during thermal vacuum (TVAC) calibration testing at Northrop Grumman’s Azusa, CA facility [9]. A general description of the calibration activities is presented in [1][9]. The testing involves inferring a scene target brightness temperature (TB) and comparing it to the actual scene TB while the instrument is at flight-like temperature and pressure environmental conditions. Trended parameters from this activity will include Noise Equivalent Delta Temperature (NEDT), nonlinearity, radiometric accuracy, gain stability, striping, and inter-channel noise correlation. The trending evaluation will allow for a direct comparison of the ATMS performance across builds. The paper will highlight observed performance improvements.

Edward J Kim↗

Pre-Launch Radiometric Performance Characterization of the Advanced Technology Microwave Sounder on the Joint Polar Satellite System-1 Satellite

The Advanced Technology Microwave Sounder (ATMS) is a space-based, cross-track radiometer for operational atmospheric temperature and humidity sounding, utilizing 22 channels over a frequency range from 23 to 183 gigahertz. The ATMS for the Joint Polar Satellite System-1 has undergone two rounds of re-work in 2014-2015 and 2016, following performance issues discovered during and following thermal vacuum chamber (TVAC) testing at the instrument and observatory level. Final shelf-level testing, including measurement of pass band characteristics and spectral response functions, was completed in December 2016. Final instrument-level TVAC testing and calibration occurred during February 2017. Here we will describe the instrument-level TVAC calibration process, and illustrate with results from the final TVAC calibration effort.

ATMS↗

Pre-Launch Performance of the Advanced Technology Microwave Sounder (ATMS) on the Joint Polar Satellite System-2 Satellite (JPSS-2)

The Advanced Technology Microwave Sounder (ATMS) is a satellite-based microwave radiometer that provides temperature and humidity sounding observations from low Earth orbit. The instrument utilizes 22 channels that cover a frequency range of 23 to 183 GHz. The first ATMS instrument was launched in 2011 on the Suomi National Polar-orbiting Partnership (S-NPP) satellite and the second ATMS was launched in 2017 on the Joint Polar Satellite System-1 (JPSS-1) satellite (now NOAA-20); both on-orbit ATMS instruments are currently operational. This paper will describe the pre-launch performance of the third ATMS instrument, designated for the JPSS-2 satellite, during ground testing and calibration.

Ed Kim↗

On Using SysML, DoDAF 2.0 and UPDM to Model the Architecture for the NOAA's Joint Polar Satellite System (JPSS) Ground System (GS)

The JPSS Ground System is a lIexible system of systems responsible for telemetry, tracking & command (TT &C), data acquisition, routing and data processing services for a varied lIeet of satellites to support weather prediction, modeling and climate modeling. To assist in this engineering effort, architecture modeling tools are being employed to translate the former NPOESS baseline to the new JPSS baseline, The paper will focus on the methodology for the system engineering process and the use of these architecture modeling tools within that process, The Department of Defense Architecture Framework version 2,0 (DoDAF 2.0) viewpoints and views that are being used to describe the JPSS GS architecture are discussed. The Unified Profile for DoOAF and MODAF (UPDM) and Systems Modeling Language (SysML), as ' provided by extensions to the MagicDraw UML modeling tool, are used to develop the diagrams and tables that make up the architecture model. The model development process and structure are discussed, examples are shown, and details of handling the complexities of a large System of Systems (SoS), such as the JPSS GS, with an equally complex modeling tool, are described

Hayden, Jeffrey L.↗

Joint Polar Satellite System (JPSS)-3 VIIRS Prelaunch Geometric Calibration and Characterization Status

The NASA/NOAA Visible Infrared Imaging Radiometer Suite (VIIRS) is a key instrument in the JPSS missions (SNPP, JPSS-1-4). Being part of the calibration and validation process, JPSS-3 VIIRS prelaunch geometric performance assessment focuses on the sensor’s spatial response, band-to-band co-registration (BBR), and pointing knowledge. In general, JPSS-3 VIIRS’ prelaunch geometric performance is very good, and consistent with SNPP and JPSS-1-2 VIIRS sensors. This paper highlights some specific key findings from the JPSS-3 VIIRS’ prelaunch tests. We first show that with timing adjustments, JPSS-3 VIIRS scan BBR error between VisNIR and S/M/LWIR bands has been reduced from 0.12/0.03 M sampling intervals to 0.005/0.002 M sampling intervals, respectively. Focal Plane Assembly (FPA) rotations have been changed from 0.1 degree to 0.04 degree in VisVIR, from 0.18 degree to 0.09 degree in S/MWIR, and 0.16 degree to 0.08 degree in LWIR. Another finding from the prelaunch test is that JPSS-3 VIIRS has relatively large band-to-band co-registration errors between VisNIR and S/M/LWIR bands in the track direction. This BBR mis-registration increases when aft‐optics assembly (AOA) temperature decreases. The BBR mis-registration is about 0.10 M sampling intervals between VisNIR and S/MWIR bands, and 0.08 M sampling intervals between VisNIR and LWIR bands. By comparison, the track BBR offset in JPSS-2 is less than 0.02 M sampling intervals between VisNIR and S/M/LWIR bands. We also notice that the unsymmetrical Day Night Band (DNB) scan-direction Line Spread Function (LSF) of JPSS-2 VIIRS at different gain stages and aggregation modes have been corrected in J3 VIIRS.

VIIRS↗