Search NASA⌕ Search

SEARCH · Search NASA

Results for “June 2024”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

EdgeCortix SAKURA-I Machine-Learning, PCIe Accelerator SEE Heavy Ion Test Report

To enable autonomy in space, machine-learning and computer vision applications become invaluable for sensor processing. However, these algorithms are computationally complex and unfeasible for many embedded central processing units (CPUs) and usually require external coprocessors, such as graphics processing units (GPUs) or accelerators specific to the application, including application specific integrated circuits (ASICs). In power-constrained systems, GPUs tend to consume more power than is acceptable (>40W), so lower-power accelerators have shown promise to provide the performance needed under spacecraft constraints. For radiation engineers, developing methodologies that can properly test CPUs, GPUs, and accelerators, and enable comparisons between them remains a necessary complication to solve as the devices become more complex. The methodology in this test aims to be a start in developing a baseline single-event effect (SEE) test for client-device machine learning accelerators. This category of devices do not host their own operating system. This testing campaign is a continuation of a previous 200 MeV proton test performed in January 2024. This report covers two heavy ion tests of the SAKURA-I card: one in April 2024, and one in June 2024. Additional data was needed after the April test due to ion-range issues experienced at higher linear-energy transfers (LETs). These range issues are described in more detail in Section 8. This experiment characterizes SEEs and data error susceptibility of the EdgeCortix SAKURA-I machine-learning accelerator under heavy ions. The device was monitored for single event upsets (SEUs) and single event functional interrupts (SEFIs) at the Lawrence Berkeley National Laboratory’s 88-inch cyclotron. The SAKURA-I board accelerates machine-learning inference applications on a host computer through a PCIex16 connection. For the purposes of devising an end to end automated analysis workflow for this experiment, the YOLO-V5 and SSD300 objection-detection models, and the ResNet-50, EfficientNet, and MobileNetV2 image classification models were used as a representative suite of analytical machine-learning models.

Seth S Roffe↗

Completion of NASA’s Two-Year Laser Communications Relay Demonstration (LCRD) Experiment Program

The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) completed its two-year experiment program in June 2024. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch. The payload relays data between two optical ground stations located in California and Hawaii and can also exchange data with an RF ground station in New Mexico. The addition of the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station in 2023 enabled data relay demonstrations between a laser terminal in low Earth orbit and either one of the optical ground stations or the RF ground station. The experiment program has included a variety of experiments originating within the LCRD project, NASA, and industry. The experiments have included measurements of the effects of the atmospheric optical channel (turbulence, weather) on the performance and availability of laser communications, adaptive optics characterization, demonstration of optimetrics techniques, and demonstration of Delay/Disruption Tolerant Networking (DTN). Furthermore, various future operational scenarios including robotic and exploration missions and various network service configurations have been emulated. This conference paper provides an overview and highlights of the LCRD experiment program with an emphasis on activities and results since the start of the ILLUMA-T testing in December 2023. A discussion of the expectations for the next phase of the LCRD mission, as well as how LCRD results may be applied to future applications is also included. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL).

Laser communications↗

Completion of NASA’s Two-Year Laser Communications Relay Demonstration (LCRD) Experiment Program

"The National Aeronautics and Space Administration’s (NASA) Laser Communications Relay Demonstration (LCRD) completed its two-year experiment program in June 2024. The LCRD geosynchronous payload includes two laser communications terminals interconnected via an onboard electronic switch. The payload relays data between two optical ground stations located in California and Hawaii and can also exchange data with an RF ground station in New Mexico. The addition of the Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) on the International Space Station in 2023 enabled data relay demonstrations between a laser terminal in low Earth orbit and either one of the optical ground stations or the RF ground station. The experiment program has included a variety of experiments originating within the LCRD project, NASA, and industry. The experiments have included measurements of the effects of the atmospheric optical channel (turbulence, weather) on the performance and availability of laser communications, adaptive optics characterization, demonstration of optimetrics techniques, and demonstration of Delay/Disruption Tolerant Networking (DTN). Furthermore, various future operational scenarios including robotic and exploration missions and various network service configurations have been emulated. This conference paper provides an overview and highlights of the LCRD experiment program with an emphasis on activities and results since the start of the ILLUMA-T testing in December 2023. A discussion of the expectations for the next phase of the LCRD mission, as well as how LCRD results may be applied to future applications is also included. LCRD is a joint project involving NASA Goddard Space Flight Center (GSFC), the California Institute of Technology Jet Propulsion Laboratory (JPL), and Massachusetts Institute of Technology Lincoln Laboratory (MIT LL). "

Lasercom↗

On-Orbit Measurements of Solar Exclusion Angle for Modular Agile Scalable Optical Terminal (MAScOT) on the ILLUMA-T Mission

The Integrated LCRD Low-Earth Orbit User Modem and Amplifier Terminal (ILLUMA-T) optical communications payload operated on the International Space Station (ISS) for 8 months, concluding in June 2024. ILLUMA-T made the ISS the first space-based user to communicate with NASA’s Laser Communications Relay Demonstration (LCRD). ILLUMA-T was also the first flight demonstration of the Modular, Agile, Scalable Optical Terminal (MAScOT) which will also be used in the Orion Artemis II Optical Communications (O2O) program, where it will provide an optical communications link for the crew aboard the Artemis II mission. Often optical and radio frequency communications systems have outages when they are pointing close to the Sun, where unwanted incident and scattered solar energy significantly reduces or prohibits operations. The MAScOT was designed to reduce the impact of any solar scatter through optical design, material choices, surface treatments and high cleanliness levels. Based on optical scattering models, a solar exclusion angle of 10 degrees was established for ILLUMA-T. This paper presents optical scattering modeling predictions, pre-launch laboratory testing results, and on-orbit measurements of solar scatter at angles ranging from 3 to 25 degrees.

optical communications↗

Experimental Results from Integrated LCRD Low-Earth Orbit User Modem and Amplifier Terminal (ILLUMA-T) Program

The National Aeronautics and Space Administration’s (NASA) Integrated LCRD Low-Earth Orbit (LEO) User Modem and Amplifier Terminal (ILLUMA-T) payload was launched and installed on the International Space Station’s (ISS) Japanese Experiment Module - Exposed Facility (JEM-EF) in November 2023. ILLUMA-T was the first space-based user to communicate with NASA’s Laser Communications Relay Demonstration (LCRD) using free space optical communication to transfer data from the ISS at return rates to Earth of up to 1.244 Gbps and forward rates from Earth of up to 155 Mbps. A 6-month long Experiments Program on ILLUMA-T concluded in June 2024, after which the payload was removed from the ISS and is currently de-orbiting. The Experiments Program was carefully designed to understand and characterize the Pointing, Acquisition, and Track (PAT) process with the new Modular, Agile, Scalable Optical Terminal (MAScOT), optical modem performance, and end-to-end relay performance.

ISS↗

Workshop on the Role of Design Assurance in System-Wide Safety’s Safety Demonstrator Series

This report summarizes a three-hour hybrid in-person/online workshop on June 7, 2024 on the topic of design assurance and the Safety Demonstrator Series (SDS), which was held at NASA Ames Research Center. The SDS provides an operational demonstration of, and recommendations for, requirements and standards necessary to monitor, assess, and mitigate risks to assure safety in disaster-oriented operations. Over sixty NASA personnel participated in the workshop. Four main topics were discussed: (1) assurance needs for the Safety Demonstrator Series, (2) assurance and the In-Time Aviation Safety Management System (IASMS), (3) in-time assurance: existing efforts and future opportunities, and (4) demonstrating assurance tools in the Safety Demonstrators. Key takeaways are as follows: 1. Design assurance tools can be used to assure an In-Time Aviation Safety Management System, the systems that comprise it, and other systems or missions. Assurance must consider both systems and components and include the interactions between elements in both a systems/aircraft context and a systems-of-systems/airspace context. 2. Design-time assurance activities can support the identification of monitors needed for operational assurance activities (i.e., the “monitor” function in the monitor-assess-mitigate paradigm at the heart of the IASMS concept). 3. A major opportunity for design-time assurance tools to contribute to the IASMS concept is to support rapid re-validation of systems. This will be particularly important for (1) supporting novel operations in the IASMS, where operational data may disprove design-time assumptions (motivating re-analysis of system safety) and (2) adapting technologies (e.g., AI/ML for autonomous operations) to new operational domains, where there may be new or different safety considerations not included in the initial scope of operations. 4. There are several design assurance tools under development in the System-Wide Safety project that can support assurance of Services, Functions, and Capabilities (SFCs) in the Safety Demonstrators. Transitioning these tools from one-off research projects into a functioning part of IASMS assurance will require closer integration between these tools. 5. It is not clear whether the role of design assurance tools is primarily as a part of IASMS architecture or as an external check on IASMS. The workshop consisted of four discussion topics initiated via four lightning talks by System-Wide Safety researchers. Discussions utilized Mural to engage both in-person and online participants in the hybrid format. Polls and surveys were also utilized to gather participant input. The workshop closed with a reflection activity for participants, as well as new ideas for collaboration and coordination of ongoing System-Wide Safety research.

design assurance↗

Detection of a Hot Binary Companion of eta Carinae

A hot companion of eta Carinae has been detected using high resolution spectra (905 - 1180 A) obtained with the Far Ultraviolet Spectroscopic Explorer (FUSE) satellite. Observations were obtained at two epochs of the 2024-day orbit: 2003 June during ingress to the 2003.5 X-ray eclipse and 2004 April several months after egress. These data show that essentially all the far-UV flux from eta Car shortward of Lyman alpha disappeared at least two days before the start of the X-ray eclipse (2003 June 29), implying that the hot companion, eta Car B, was also eclipsed by the dense wind or extended atmosphere of eta Car A. Analysis of the far-UV spectrum shows that eta Car B is a luminous hot star. N II 1084-1086 emission disappears at the same time as the far-UV continuum, indicating that this feature originates from eta Car B itself or in close proximity to it. The strong N II emission also raises the possibility that the companion star is nitrogen rich. The observed FUV flux levels and spectral features, combined with the timing of their disappearance, is consistent with eta Carinae being a massive binary system

Sonnebom, G.↗

Detection of a Hot Binary Companion of eta Carinae

A hot companion of eta Carinae has been detected using high resolution spectra (905 - 1 180 Angsroms) obtained with the Far Ultraviolet Spectroscopic Explorer (FUSE) satellite. Observations were obtained at two epochs of the 2024-day orbit: 2003 June during ingress to the 2003.5 X-ray eclipse and 2004 April several months after egress. These data show that essentially all the far-UV flux from eta Car shortward of Lyman alpha disappeared at least two days before the start of the X-ray eclipse (2003 June 29), implying that the hot companion, eta Car By was also eclipsed by the dense wind or extended atmosphere of eta Car A. Analysis of the far-UV spectrum shows that eta Car B is a luminous hot star. N II 1084-1086 emission disappears at the same time as the far-UV continuum, indicating that this feature originates from eta Car B itself or in close proximity to it. The strong N II emission also raises the possibility that the companion star is nitrogen rich. The observed FUV flux levels and spectral features, combined with the timing of their disappearance, are consistent with eta Carinae being a massive binary system.

Sonneborn, G.↗

Interim Measures Pilot Study Completion Report, South Repeater Building, Solid Waste Management Unit 121, Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances

This Per- and Polyfluoroalkyl Substances (PFAS) Interim Measures Pilot Study Completion Report was prepared for the National Aeronautics and Space Administration by AECOM Technical Services, Inc. under Contract 80KSC019D0010, Task Order 80KSC021F0096. The purpose of this report is to document the pilot study activities at the South Repeater Building, Solid Waste Management Unit (SWMU) 121. This report details the additional assessment activities completed from June 2023 through November 2023 and the subsequent pilot study completed at the South Repeater Building conducted in December 2023 through February 2024. Initial activities were conducted in accordance with the Pilot Study Work Plan (NASA 2023), submitted to the KSC Remediation Team and accepted by the team on October 26, 2023. The objectives of the pilot study were to: • Provide information on aquifer characteristics and to aid in future modeling and remedial design activities to mitigate off-KSC migration of PFAS compounds. • Develop information on characteristics of the surficial aquifer system, specifically transmissivity, storage coefficient, hydraulic conductivity, and vertical hydraulic conductivity. • Obtain data to support construction and calibration of a groundwater flow model. • Acquire design parameters necessary for future remedial design activities, specifically radius of influence, drawdown, flow rates, and pump settings. The following activities were completed to meet the pilot study objectives: • Groundwater and surface water sampling • Geophysical investigation via Hydraulic Profiling Tool (HPT) and soil sampling • Installation of observation and extraction wells via rotosonic techniques • Slug, step, and pump testing activities • Initial modeling efforts for a groundwater hydraulic containment system. Results of the pilot study and modeling activities are being used in the development of a groundwater containment and treatment system for the site.

PFAS↗

X-ray Monitoring of eta Carinae: Variations on a Theme

We present monitoring observations by the Rossi X-ray Timing Explorer of the 2-10 keV X-ray emission from the supermassive star eta Carinae from 1996 through late 2003. These data cover more than one of the stellar variability cycles in temporal detail and include especially detailed monitoring through two X-ray minima. We compare the current X-ray minimum which began on June 29, 2003 to the previous X-ray minimum which began on December 15, 1997, and refine the X-ray period to 2024 days. We examine the variations in the X-ray spectrum with phase and with time, and also refine our understanding of the X-ray peaks which have a quasi-period of 84 days, with significant variation. Cycle-to-cycle differences are seen in the level of X-ray intensity and in the detailed variations of the X-ray flux on the rise to maximum just prior to the X-ray minimum. Despite these differences the similarities between the decline to minimum, the duration of the minimum, and correlated variations of the X-ray flux and other measures throughout the electromagnetic spectrum leave little doubt that that the X-ray variation is strictly periodic and produced by orbital motion as the wind from eta Carinae collides with the wind of an otherwise unseen companion.

Corcoran, M. F.↗

Arctic Radiation-Cloud-Aerosol-Surface Interaction eXperiment (ARCSIX)

The Arctic climate system is amidst a transition. Over the last 40 years, the Arctic sea ice pack has transformed from a predominantly thick, multi-year sea ice to a predominantly thin, seasonal sea ice, termed the “New Arctic”. The observed rapid changes in the Arctic sea ice pack are an integral part of the Arctic Amplification phenomenon and represent a response to and a feedback on global climate change. As a result, the role of the Arctic within the global climate system is changing. Substantial uncertainty exists in our understanding of the atmosphere-surface interactions within the Arctic system, limiting our knowledge of the Arctic’s role in the future climate. Advancing our understanding of the Arctic climate system requires (1) measurements of the coupling between radiative processes and sea ice surface properties during summer sea ice melt; (2) measurements of the processes controlling the predominant Arctic cloud regimes and their properties (Fig. 1); and (3) improvements in the ability to monitor Arctic cloud, radiation, and sea ice processes from space. A key challenge is that thin, low clouds that are radiatively important to the Arctic surface energy budget can go undetected (Fig. 1). The Arctic Radiation-Cloud-Aerosol-Surface-Interaction eXperiment (ARCSIX) is an airborne campaign based at the Pituffik Space Base in Greenland from May-August 2024 sponsored by the National Aeronautics and Space Administration (NASA) to address these needs. ARCSIX consists of two airborne measurement campaigns taking place in two 3-week intervals during the early and late sea ice melt season: late May through early June and late July through early August, respectively. ARCSIX science is guided by three broad science questions that encapsulate the key influences of radiation-cloud-aerosol-sea ice coupling and a remote sensing and modeling objective: Science Question 1 (Radiation): What is the impact of the predominant summer Arctic cloud types on the radiative surface energy budget? Science Question 2 (Cloud Life Cycle): What processes control the evolution and maintenance of the predominant cloud regimes in the summertime Arctic? Science Question 3 (Sea Ice): How do the two-way interactions between surface properties and atmospheric forcings affect the sea ice evolution? Remote Sensing and Modeling Objective: Enhance our long-term space-based monitoring and predictive capabilities of Arctic sea ice, clouds, and aerosols.

Patrick Taylor↗

NASA's Efforts to Commercialize Communications Services for Mission in Near-Earth Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN)Program enables high speed, robust, secure and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is pursuing the use of demonstrated commercial services for all its future near-Earth requirements through a flexible, multi-provider approach that minimizes risks to the user missions and ensures costs to user missions are reasonable. Progress toward this goal is advancing in multiple key areas including direct to Earth (DTE), space-based relay, technology investments, required spectrum regulatory changes and mission engagement and infusion. The transition to commercial DTE services is already underway, with a target for transition by 2024. The primary functions to execute SCaN’s DTE strategy include increasing commercial service allocations by leveraging current commercial network providers and enabling seamless onboarding of additional providers into the network. Furthermore, moving away from government DTE services will allow operational costs to be optimized. A more gradual approach is planned for the transition to commercial space-based relay services to allow for demonstration and operationalization of commercial services for future users by 2030. In June of 2022, six American SATCOM vendors were awarded a combined $278.5 million through Funded Space Act Agreements (FSAAs) for the first cycle of demonstration and validation activities. The end-to-end service capabilities being targeted are based on existing NASA mission operational needs. Accordingly, each company has proposed a technical approach to lower costs, increase flexibility, and improve performance for a broad range of missions. Successful user mission transition to commercial services, both DTE and space-based relay, are dependent on the technologies and capabilities that address gaps in commercial capability. NASA is investing in technology development and pursuing a new strategic approach to the creation or adoption of space communications standards to move the agency toward a commercial paradigm. Wideband and multi-lingual user terminals are being developed to bridge differences in industry services. Building on ground demonstrations completed in 2021, the Johns Hopkins Applied Physics Lab (APL) will be flight testing a multi-lingual wideband terminal (payload) and demonstrating connectivity to both government and commercial relay services. NASA holds a leadership role in multiple civil space standards bodies and international coordination groups to ensure that standards supporting interoperability are developed with defined functions, interfaces, and performance. However, to successfully meet commercialization objectives, NASA seeks to collaborate with industry, and as applicable adopt or adapt to commercially defined standards. As such, NASA joined the 3rd Generation Partnership Project (3GPP) as an official member in 2021 to advocate for the inclusion of space missions as a unique user segment in future 5G non-terrestrial networks, and to better understand the scope of 3GPP releases and implications for space users. Further, engagement in Spectrum regulatory bodies is being undertaken to augment existing space-Earth and inter-satellite frequency allocations available for both government and commercial space systems. This paper addresses the recent progress toward NASA’s commercial space communications transition objectives and how key challenges are being navigated.

Gregory W Heckler↗

Johnson Space Center Thermal Technology Roadmap 2024

This presentation gives an overview of thermal technology development efforts at the Johnson Space Center (JSC), NASA’s center for human spaceflight. The presentation begins with an overview of NASA’s current human spaceflight programs, followed by the various JSC organizations that support thermal technologies. Lastly, thermal capability gaps are described along with current development efforts that are part of the roadmap to close those gaps.

spacecraft thermal control↗

Exploring our Changing Planet through NASA’s Earth Information Center and Novel Methods for Earth Science Communication

In June 2023, NASA unveiled the Earth Information Center (EIC), an interagency initiative which invites the global community to explore how our planet is changing through interactive installations, captivating visualizations, and novel storytelling. Existing in both physical and virtual space, the EIC serves as a gateway to actionable information collected through an expanding fleet of Earth observing satellites and sensors. The EIC features data driven visualizations, near real-time information, immersive experiences, and curated stories that highlight the applications of publicly available data to address environmental challenges across nine thematic areas: agriculture, biodiversity, disasters, greenhouse gases, air quality, sea level rise, sustainable energy, water resources, and wildfires. Designed by an interdisciplinary team, EIC exhibits are developed to reach a wide base of end-users across multiple learning modalities. During the first year of operation, the inaugural location of the EIC at NASA Headquarters in Washington, DC, welcomed an estimated 24,000 visitors, hosted over 145 tours for domestic and international organizations, supported NASA’s Earth Day 2024 programming, and led six STEM programs for diverse student communities. With lessons learned from the first year of being open to the public and a variety of novel science communication tools in development, the EIC is expanding the mission’s reach by collaborating with museums and visitor centers. Through these collaborations, we aim to inform a broader demographic about the unprecedented changes observed in Earth’s climate and inspire communities to learn more about their one and only home, planet Earth.

Nicole Ramberg-Pihl↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗