Search NASA⌕ Search

SEARCH · Search NASA

Results for “Jupiter/Saturn”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Navigation system design for the Mariner Jupiter/Saturn Mission.

The Mariner Jupiter/Saturn Mission is described with emphasis on the navigation problems arising in attempting a Jupiter/Saturn swingby mission which includes close encounters with one or more of the natural satellites of each planet. The navigation system being designed to solve these problems is described. This system includes sub-systems for precision trajectory correction. Earth-based radiometric data, and onboard star/satellite measurements via employment of the science-imaging TV sub-system. Total system performance is discussed as measured against the mission's inherent navigation goals.

Curkendall, D. W.↗

Mariner Jupiter/Saturn 1977 - The mission frame.

Following the cancellation of the Outer Planet Grand Tour Project, NASA and JPL examined less ambitious, alternative missions for exploring the outer planets. The mission that proved most attractive scientifically and fits within the projected NASA budget constraints embraces dual flights to Jupiter and Saturn, with launch in 1977. NASA has implemented it as the Mariner Jupiter/Saturn 1977 (MJS77) Project. The MJS77 mission covers exploratory investigations of the Jupiter and Saturn planetary systems and the interplanetary medium out to Saturn. Items of special interest include Jupiter's great red spot, the question of Io's anomalous brightening and phenomena associated with its EM behavior. After Saturn encounter, the spacecraft will escape the solar system in the general direction of the solar apex.

Bourke, R. D.↗

Mariner Jupiter/Saturn infrared instrument study

The Mariner Jupiter/Saturn infrared instrumentation conceptual design study was conducted to determine the physical and operational characteristics of the instruments needed to satisfy the experiment science requirements. The design of the instruments is based on using as many proven concepts as possible. Many design features are taken from current developments such as the Mariner, Pioneer 10, Viking Orbiter radiometers, and Nimbus D spectrometer. Calibration techniques and error analysis for the instrument system are discussed.

Source record↗

Mariner Jupiter/Saturn 1977 infrared interferometer spectrometer (MJS' 77) design study

A design study of the Infrared Interferometer Spectrometer and Radiometer (IRIS) instrument for the Mariner Jupiter/Saturn 1977 mission was conducted. The objective of the study was to investigate a number a potential problem areas identified in previous studies and to develop the instrument system designs along the lines providing for the optimum performance obtainable with the allowable budgets. The considerations for the optical design, mechanical design, and electronic design are examined.

Source record↗

Trajectory selection for the Mariner Jupiter/Saturn 1977 project

The use of decision analysis to facilitate a group decision-making problem in the selection of trajectories for the two spacecraft of the Mariner Jupiter/Saturn 1977 Project. A set of 32 candidate trajectory pairs was developed. Cardinal utility function values were assigned to the trajectory pairs, and the data and statistics derived from collective choice rules were used in selecting the science-preferred trajectory pair.

Dyer, J. S.↗

The Mariner Jupiter/Saturn photopolarimeter experiment

Observations of Saturn's rings by the Mariner Jupiter/Saturn photopolarimeter are studied. From these observations attempts were made to: (1) determine the size, shape, albedo, distribution, and orientation of particles in the rings, (2) measure geometric and optical thickness of the rings, and (3) determine the effect of Saturn's satellites on dynamics of ring particles. Special attention was given to stellar and solar occulation measurements, surface brightness photometry, and phase angle dependence of intensity and polarization.

Lillie, C. F.↗

The Mariner Jupiter/Saturn visual imaging system

Attempts were made to determine the spatial distribution of materials and brightness temperature of Saturn's rings using observations made by the visual imaging system of the Mariner Jupiter/Saturn project.

Smith, B. A.↗

The Mariner Jupiter/Saturn ultraviolet experiment

Atmospheric properties of Saturn's rings as measured by an ultraviolet spectrometer onboard the Mariner Jupiter/Saturn probe are studied. Measurements were made of planetary atmospheric radiation, resonance scattered by atomic or molecular constituents, solar spectra, and the absorption characteristics of the atmosphere. Measurements were made in the 400 to 1600 A region.

Broadfoot, A. L.↗

The Mariner Jupiter/Saturn ring occultation experiment

Radio occultation measurements of Saturn's rings as measured by the Mariner Jupiter/Saturn radio science experiment are reported. These signal measurements provide information on size, distribution, and density of particle material found in the rings.

Eshleman, V. R.↗

Science objectives and the Mariner Jupiter/Saturn 1977 mission design

The two Mariner spacecraft to be launched in 1977 to fly by Jupiter and Saturn require a mission design which is heavily dependent on science objectives. These science objectives translate into trajectory requirements imposed by one or more of the eleven instruments aboard Mariner such as distance of closest approach, inclination, occultation, lighting, etc., at the bodies of interest. Also, Jupiter and Saturn cannot be considered as individual targets but as miniature solar systems, where the mission design must apply to the Jovian and Saturnian satellites, and to Saturn's rings. The major objective of this analysis is to translate the science desires into the mission possibilities. Each object, be it a Galilean satellite, Titan, or the ring of Saturn, provides a unique region suitable for scientific investigation for the on-board instruments. Some of these trajectory regions overlap, others do not. Thus, critical choices must be made in selecting the trajectories to be flown by the two Mariner spacecraft. Such a choice, though preliminary, has been made by the Mariner Jupiter/Saturn 1977 (MJS'77) science teams, and a brief discussion of the selection process and the pair of trajectories chosen is presented in this paper.

Penzo, P. A.↗

Design of the Mariner Jupiter/Saturn 1977 telemetry system

In 1977 NASA will launch two spacecraft to perform scientific investigations of the Jupiter and Saturn planetary systems. The science payload includes a total of ten instruments to support both the interplanetary-cruise and planetary-encounter phases. These will be the first launches of a new generation of Mariner-class spacecraft designed for outer-planet missions. The telemetry-system design for these missions was especially challenging because of extreme communication ranges (1.5 billion km), high data-rate requirements (up to 115.2 kbit/sec), and more stringent data-quality requirements than previous Mariner missions. The present paper discusses the evolution and design of the Mariner Jupiter/Saturn 1977 telemetry system and presents the performance anticipated therefrom.

Wood, G. E.↗

Trajectory selection for the Mariner Jupiter/Saturn 1977 Project

This paper describes the use of decision analysis to facilitate a group decision-making problem in the selection of trajectories for the two spacecraft of the Mariner Jupiter/Saturn 1977 Project. This NASA project includes the participation of some eighty scientists divided by specialization among eleven science teams. A set of thirty-two candidate trajectory pairs was developed by the Project in collaboration with the science teams. Each science team then ordinally ranked and assigned cardinal utility function values to the trajectory pairs. These data and statistics derived from collective choice rules were used by the scientists in selecting the preferred trajectory pair.

Dyer, J. S.↗

Mariner Jupiter/Saturn 1977 navigation strategy

This paper presents selected navigational aspects of the Mariner Jupiter/Saturn 1977 mission. Emphasis is given to the trajectory correction strategy. In addition to science return and propellant costs, specific considerations affecting the strategy include a large number of candidate trajectories, relatively close satellite flybys, use of trajectory correction maneuvers for trajectory shaping, and the requirement for an optical data type to achieve precision satellite encounters. Finally, important error sources and mission constraints are identified, and their impact on the strategy is discussed.

Mckinley, E. L.↗

Mariner Jupiter/Saturn LCSSE thruster/valve assembly and injection propulsion unit rocket engine assemblies: 0.2-lbf T/VA development and margin limit test report

Thruster valve assemblies (T/VA's) were subjected to the development test program for the combined JPL Low-Cost Standardized Spacecraft Equipment (LCSSE) and Mariner Jupiter/Saturn '77 spacecraft (MJS) programs. The development test program was designed to achieve the following program goals: (1) demonstrate T/VA design compliance with JPL Specifications, (2) to conduct a complete performance Cf map of the T/VA over the full operating range of environment, (3) demonstrate T/VA life capability and characteristics of life margin for steady-state limit cycle and momentum wheel desaturation duty cycles, (4) verification of structural design capability, and (5) generate a computerized performance model capable of predicting T/VA operation over pressures ranging from 420 to 70 psia, propellant temperatures ranging from 140 F to 40 F, pulse widths of 0.008 to steady-state operation with unlimited duty cycle capability, and finally predict the transient performance associated with reactor heatup during any given duty cycle, start temperature, feed pressure, and propellant temperature conditions.

Clark, E. C.↗

Statistical Mechanics and Dynamics of the Outer Solar System.I. The Jupiter/Saturn Zone

We report on numerical simulations designed to understand how the solar system evolved through a winnowing of planetesimals accreeted from the early solar nebula. This sorting process is driven by the energy and angular momentum and continues to the present day. We reconsider the existence and importance of stable niches in the Jupiter/Saturn Zone using greatly improved numerical techniques based on high-order optimized multi-step integration schemes coupled to roundoff error minimizing methods.

numerical simulations planetesimals planet formati↗

Mariner Jupiter/Saturn 1977 preliminary mission design.

Current plans of NASA are to take advantage of the 1977 launch opportunity by sending a Mariner class spacecraft on a gravity assisted flyby of Jupiter which will then continue on to Saturn. The background of this Mariner Jupiter-Saturn 77 Project is reviewed and science objectives for this mission as currently adapted are given. This paper illustrates properties of the Jupiter-Saturn opportunities between 1976 and 1980 to give context to the 1977 opportunity. Details of the possibilities for the 1977 launch are shown along with constraints and example candidate trajectories. Options include close flybys and/or occultations of the satellites at Jupiter and Saturn, penetration of Saturn's rings, and various occultations of the planets. A short discussion of other factors, such as navigation and planetary quarantine (documented elsewhere) are included.

Bourke, R. D.↗

Computation and analysis of satellite opportunities for the Mariner Jupiter/Saturn 1977 mission

The MJS77 mission provides the United States with the first opportunity to study the large satellites of Jupiter and Saturn at close range. Techniques are presented which allow the mission analyst to generate single and multiple satellite encounters at Jupiter and Saturn, and to incorporate satellite gravity assist into the targeting problem. These methods are applied to the MJS77 mission to generate, parametrically, the single and multiple satellite opportunities and characteristics at both flyby planets. An interesting consequence of this study is that a close encounter with a Galilean satellite increases the flexibility of a trajectory design which would otherwise require sizable post-Jupiter trajectory correction maneuvers to achieve the desired Saturn arrival date timing. In addition the Saturn studies revealed that as many as four satellites can be encountered on a single trajectory.

Beerer, J. G.↗