Search NASA⌕ Search

SEARCH · Search NASA

Results for “KICKER MAGNETS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

In situ baking method for degassing of a kicker magnet in accelerator beam line

In this study, the authors propose a new in situ degassing method by which only kicker magnets in the accelerator beam line are baked out without raising the temperature of the vacuum chamber to prevent unwanted thermal expansion of the chamber. By simply installing the heater and thermal radiation shield plates between the kicker magnet and the chamber wall, most of the heat flux from the heater directs toward the kicker magnet. The result of the verification test showed that each part of the kicker magnet was heated to above the target temperature with a small rise in the vacuum chamber temperature. A graphite heater was selected in this application to bake-out the kicker magnet in the beam line to ensure reliability and easy maintainability of the heater. The vacuum characteristics of graphite were suitable for heater operation in the beam line. A preliminary heat-up test conducted in the accelerator beam line also showed that each part of the kicker magnet was successfully heated and that thermal expansion of the chamber was negligibly small.

43 PARTICLE ACCELERATORS↗

Thermal Analysis and Simulations of the Abort Kicker Magnets Systems for the Electron-Ion Collider

The Abort Kicker Magnets system used in the current Relativistic Heavy Ion Collider (RHIC) to steer the circulating beam into the dump will be subjected to higher heat loads in the Electron-Ion Collider (EIC). After analyzing the existing abort kicker magnets and running thermal simulations in ANSYS it was concluded that they may not be suitable for use as-is in the future EIC due to heat and impedance concerns in the magnets. Possible solutions include adding a round titanium-coated ceramic beam tube to help solve the heat and impedance concerns, but this will reduce the limiting aperture of the kicker magnet. Another possible solution to meet all the performance requirements for EIC would be to add titanium-coated ceramic plates with water-cooling and tapered transitions that significantly improve the impedance and lower the heat in the magnets with less reduction to the aperture.

43 PARTICLE ACCELERATORS↗

MI Gap Clearing Kicker Magnet Design Review

The kicker system requirements were originally conceived for the NOvA project. NOvA is a neutrino experiment located in Minnesota. To achieve the desired neutrino flux several upgrades are required to the accelerator complex. The Recycler will be used as a proton pre-injector for the Main Injector (MI). As the Recycler is the same size as the MI, it is possible to do a single turn fill ({approx}11 {micro}sec), minimizing the proton injection time in the MI cycle and maximizing the protons on target. The Recycler can then be filled with beam while the MI is ramping to extract beam to the target. To do this requires two new transfer lines. The existing Recycler injection line was designed for 10{pi} pbar beams, not the 20{pi} proton beams we anticipate from the Booster. The existing Recycler extraction line allows for proton injection through the MI, while we want direct injection from the Booster. These two lines will be decommissioned. The new injection line from the MI8 line into the Recycler will start at 848 and end with injection kickers at RR104. The new extraction line in the RR30 straight section will start with a new extraction kicker at RR232 and end with new MI injection kickers at MI308. Finally, to reduce beam loss activation in the enclosure, a new gap clearing kicker will be used to extract uncaptured beam created during the slip stack injection process down the existing dump line. It was suggested that the MI could benefit from this type of system immediately. This led to the early installation of the gap clearing system in the MI, followed by moving the system to Recycler during NOvA. The specifications also changed during this process. Initially the rise and fall time requirements were 38 ns and the field stability was {+-}1%. The 38 ns is based on having a gap of 2 RF buckets between injections. (There are 84 RF buckets that can be filled from the Booster for each injection, but 82 would be filled with beam. MI and Recycler contain 588 RF buckets.) A rough cost/benefit analysis showed that increasing the number of empty buckets to 3 decreased the kicker system cost by {approx}30%. This could be done while not extending the running time since this is only a 1% reduction in protons per pulse, hence the rise and fall time are now 57 ns. Additionally, the {+-}1% tolerance would have required a fast correction kicker while {+-}3% could be achieved without this kicker. The loosened tolerance was based on experience on wide band damping systems in the MI. A higher power wideband damping system is a better use of the resources as it can be used to correct for multiple sources of emittance growth. Finally, with the use of this system for MI instead of Recycler, the required strength grew from 1.2 mrad to 1.7 mrad. The final requirements for this kicker are listed.

43 PARTICLE ACCELERATORS↗

Kicker Magnet and Pulser

The SLC Project utilizes several fast kicker magnets. Their requirements vary somewhat, however, the cooling rings kickers have the most stringent requirements. In this note we describe the design of the positron ring kickers, and the reasons that led to it.

ACCSYS↗

Mechanical design of ceramic beam tube braze joints for NOvA kicker magnets

The NO?A Experiment will construct a detector optimized for electron neutrino detection in the existing NuMI neutrino beam. The NuMI beam line is capable of operating at 400 kW of primary beam power and the upgrade will allow up to 700 kW. Ceramic beam tubes are utilized in numerous kicker magnets in different accelerator rings at Fermi National Accelerator Laboratory. Kovar flanges are brazed onto each beam tube end, since kovar and high alumina ceramic have similar expansion curves. The tube, kovar flange, end piece, and braze foil alloy brazing material are stacked in the furnace and then brazed. The most challenging aspect of fabricating kicker magnets in recent years have been making hermetic vacuum seals on the braze joints between the ceramic and flange. Numerous process variables can influence the robustness of conventional metal/ceramic brazing processes. The ceramic-filler metal interface is normally the weak layer when failure does not occur within the ceramic. Differences between active brazing filler metal and the moly-manganese process will be discussed along with the applicable results of these techniques used for Fermilab production kicker tubes.

43 PARTICLE ACCELERATORS↗

Test Study for Generation of Short Pulsed Synchrotron Radiation by Kicker Magnet in SPring-8 Storage Ring

A shorter pulse of synchrotron radiation is desired to measure a fast dynamic process exploration with a better resolution by material structure physics users. Among many complex schemes proposed for this purpose, we tested a simple scheme which makes use of a head-tail oscillation of a circulating electron beam with a small beam emittance. We have developed a new kicker magnet system which generated a short pulsed horizontal field of about 4.19 mT in 1.4 {mu}s pulse width with 1 Hz repetition. With this new developed kicker magnet system, we observed a bunch profile which leaned impressively between head and tail position by a visible light streak camera. Then we succeeded in achieving the shorter X-ray pulse width than the original one after a vertical slit being sliced by {approx}6 times. The observed X-ray pulse width was 7.38{+-}2.35 ps in FWHM.

43 PARTICLE ACCELERATORS↗

IMPLEMENTATION OF A DC BUMP AT THE STORAGE RING INJECTION STRAIGHT SECTION

The NSLS II beam injection works with a DC septum, a pulsed septum and four fast kicker magnets. The kicker power supplies each produce a two revolution period pulsed field, 5.2 {micro}s half sine waveform, using {approx}5kA drive voltage. The corresponding close orbit bump amplitude is {approx}15mm. It is desired that the bump is transparent to the users for top-off injection. However, high voltage and short pulse power supplies have challenges to maintain pulse-to-pulse stability and magnet-to-magnet reproducibility. To minimize these issues, we propose implementing a DC local bump on top of the fast bump to reduce the fast kicker strength by a factor of 2/3. This bump uses two storage ring corrector magnets plus one additional magnet at the septum to create a local bump. Additionally, these magnets could provide a DC bump to simulate the septum position effects on the store beam lifetime. This paper presents the detail design of this DC injection bump and related beam dynamics.

43 PARTICLE ACCELERATORS↗

Upgrade of the Spallation Neutron Source Injection and Extraction Kicker Pulse Verification Systems

The Spallation Neutron Source (SNS) injection system transports a chopped, 1ms H- ion beam from the linac into the accumulator ring, where two electrons are stripped from each ion, resulting in a proton beam propagating in the ring. The injection kickers use a 1400A current source with a 1ms discharge time to paint the optimum phase space of the injected proton population. The accumulation ring stacks 1us bunches from the 1ms beam pulse to increase peak beam current by a factor of ~1000. The accumulated beam is deflected by fourteen 33kV, 700ns pulsed extraction kicker magnets and delivered to the mercury target, where neutrons are spalled for science experiments. Protecting the accelerator from an errant beam—which may result from asynchronous firing or insufficient magnetic-field intensity in kicker systems—requires a system that monitors and verifies the pulsed current in the kicker magnets prior to and during each 60Hz beam pulse. In addition, the extraction system pulse-forming network (PFN) is verified to be correctly charged and ready for triggering prior to injecting the beam into the linac from the ion source. This paper describes the two verification systems requirements, limitations of the existing systems, and development of new systems.

Morris, B↗