LAMP Technical Readiness Evaluation Report: LAMP-ENG-RPT-003 (Revision 2)
An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risks to the project. These recent design modifications are based on the LAMP Conceptual Design which is the design evaluated in this document and include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (i.e. choppers, kickers, and bunchers). • An additional 100-keV H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H - ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional 3-MeV Radio Frequency Quadrupole (RFQ) design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project Key Performance Parameters (KPPs). • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages.