Search NASASearch

SEARCH · Search NASA

Results for “LAMP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

LAMP Technical Readiness Evaluation Report: LAMP-ENG-RPT-003 (Revision 2)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risks to the project. These recent design modifications are based on the LAMP Conceptual Design which is the design evaluated in this document and include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (i.e. choppers, kickers, and bunchers). • An additional 100-keV H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H - ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional 3-MeV Radio Frequency Quadrupole (RFQ) design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project Key Performance Parameters (KPPs). • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages.

43 PARTICLE ACCELERATORS

LAMP Emittance Budget LAMP-ENG-RPT-002

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP).

43 PARTICLE ACCELERATORS

LAMP Emittance Budget, Rev. 1

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP). This brief report summarizes the emittance budget for the LANSCE Modernization Project (LAMP). While the project Key Performance Parameters (KPPs) specify threshold and objective requirements for charge delivered to each experimental area, no upper limits on beam emittances are specified. To maintain low losses in the high-energy section of the LANSCE linac and hands-on maintenance, some upper limits on beam emittance need to be specified for the new LAMP front-end performance. The scope of the LAMP project replaces the injector section and drift-tube linac (DTL) up to 100 MeV of the existing LANSCE linac. This new design replacement will be integrated with the remaining coupled cavity linac (CCL) which makes up most of the accelerator at LANSCE and accelerates the beam to a final energy of 800 MeV. The initial approach that has been used to define an emittance budget for the new LAMP front end is based on recent and historical measured beam emittances at 100 MeV for the three beam types accelerated at LANSCE: H+ (protons for isotope production), LBEG (H- beam for delivery to proton radiography and to the Lujan neutron spallation target, and MPEG (H- beam for delivery to the Weapons Neutron Research facility). The emittance budget (upper limit) for each beam type has been selected to maintain the losses in the CCL to a level approximately equivalent to those observed in present operations to first order. However, the goal of the LAMP project is to improve the quality of the beams injected into the CCL, if possible, thus allowing for higher average current operation while also lowering beam losses and activation at high beam energies. The table below summarizes the beam measurements evaluated and used to establish a conservative emittance budget for LAMP based on known historical beam losses and activation. However, based on estimates of the CCL admittance and the Isotope Production Facility (IPF) beamline acceptance, a more relaxed transverse emittance upper limit of 0.095 π-cm-mrad, rms, normalized may be acceptable at 100 MeV while still meeting the LAMP performance requirements for charge delivery to each LANSCE experimental area and maintaining hands-on maintenance. This upper limit is supported by a recent analysis of operational data. Additionally, the present conceptual LAMP front-end design meets this requirement.

43 PARTICLE ACCELERATORS

New Report Highlights LAMP's Role as a Robust and Reliable System for Wave Energy Converter Testing

Harnessing the power of waves requires more than just putting devices in the ocean - it takes tools that can refine and accelerate innovation before the first deployment. That's where NLR's largeamplitude motion platform, or LAMP, comes in. LAMP is a six-degree-of-freedom motion system designed to replicate the response of a wave energy converter (WEC) device in realistic ocean conditions. By letting researchers evaluate WEC performance in a safe, controlled lab environment before moving offshore, LAMP helps accelerate innovation while reducing risk. An NLR report, titled Initial Characterization of the NLR LargeAmplitude Motion Platform (https://www.nrel.gov/docs/fy26osti/93733.pdf), provides a deeper understanding of LAMP's capabilities and also lays the groundwork for future advancements in WEC testing methodologies. Researchers studied LAMP's amplitude and frequency limits across different payloads and collected data from 16 test profiles. Testing demonstrated that platform accuracy remained consistent across all payloads evaluated; researchers expect similar accuracy up to LAMP's 10,000-kilogram capacity limit. The measured position limits for single degrees of freedom experienced by WECs, including surge, sway, heave, roll, pitch, and yaw, also exceeded the original manufacturer specifications, providing new insight into the true boundaries of the system.

16 TIDAL AND WAVE POWER

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS

LAMP Project Facility and Space Requirements

The project will require significant space over the lifetime of the project to successfully execute design, technology maturation, component testing and verification, and final removal and installation. The types of space required falls into three general categories: office, storage, and laboratory. Figure 1 below summarizes the project space requirements by project lifecycle. The specific color coding indicates the availability (and potential risk to the project) of the particular type of space: green indicates space that is already allocated and in use by the LAMP project; yellow indicates space that is expected to be easily transitioned from its current use to the project; red indicates a space that is use by multiple users or other projects, and will most likely require high-level negotiations and planning to become available to the project. Figure 2 summarizes the LAMP Space Requirements by calendar year and type throughout the duration of the project. As can be seen in Fig. 2, the maximum space needed by the project exceeds 40,000 square feet, with an average space requirement over the lifetime of the project equal to approximately 25,000 square feet.

43 PARTICLE ACCELERATORS

High-Power Amplifier Considerations for testing the LAMP RFQ and first DTL Cavity

As part of the LANSCE Accelerator Modernization Pro ject (LAMP), critical portions of the proposed accelerator will be tested as proof of concept and aid in planning the installation of LAMP at Los Alamos Neutron Science Cen ter. As part of this demonstration, the radio frequency quadrupole (RFQ) and the first drift-tube linac (DTL) cav ity will be tested with beam. For this purpose, high-power RF amplifiers are being designed to meet the testing de mands. This is a description of the requirements of these amplifiers and how the design is intended to meet them.

42 ENGINEERING

LAMP Emittance Budget Rev. 2

This report summarizes the performance limits of the LANSCE Coupled-Cavity Linac (CCL). These results are captured or summarized directly from the references cited. This report was written in support of the LANSCE Modernization Project (LAMP).

43 PARTICLE ACCELERATORS

LAMP Operational Concepts

This brief report describes the major operational changes resulting from accelerator design and implementation of the LAMP scope. Improvements in operational performance are discussed, along with implications for integration with the existing LANSCE accelerator complex. Potential impacts to the present LANSCE operational modes and integration with the existing personnel and machine protection systems are also discussed.

43 PARTICLE ACCELERATORS

COOL-LAMPS. VII. Quantifying Strong-lens Scaling Relations with 177 Cluster-scale Strong Gravitational Lenses in DECaLS

Abstract We estimate the Einstein-radius-enclosed total mass for 177 cluster-scale strong gravitational lenses identified by the ChicagO Optically selected Lenses Located At the Margins of Public Surveys (COOL-LAMPS) collaboration with lens redshifts ranging from 0.2 ⪅ z ⪅ 1.0 using the brightest-cluster-galaxy (BCG) redshift and an observable proxy for the Einstein radius. We constrain the Einstein-radius-enclosed luminosity and stellar mass by fitting parametric spectral energy distributions to aperture photometry from the Dark Energy Camera Legacy Survey (DECaLS) in the g -, r -, and z -band Dark Energy Camera filters. We find that the BCG redshift, enclosed total mass, and enclosed luminosity are strongly correlated and well described by a planar relationship in 3D space. We find that the enclosed total mass and stellar mass are correlated with a logarithmic slope of 0.50 0 − 0.031 + 0.029 , and the enclosed total mass and stellar-to-total mass fraction are correlated with a logarithmic slope of − 0.49 5 − 0.033 + 0.032 . In tandem with the small radii within which these slopes are constrained, this may suggest invariance in baryon conversion efficiency and feedback strength as a function of cluster-centric radii in galaxy clusters. Additionally, the correlations described here should have utility in ranking strong-lensing candidates in upcoming imaging surveys—such as Rubin/Legacy Survey of Space and Time—in which an algorithmic treatment of strong lenses will be needed due to the sheer volume of data these surveys will produce.

Mork, Simon D. (ORCID:0000000255739131)

Requirements and Overview of the LAMP PDM Vault

The Los Alamos Neutron Science Center (LANSCE) is located at Technical Area 53 (TA-53) at Los Alamos National Laboratory in Los Alamos, New Mexico. LANSCE is driven by an 800 mega electron volt (MeV) proton accelerator that delivered first beam in 1972. The LANSCE accelerator is unique in that it accelerates both H- (to full energy of 800 MeV) and H+ ions (up to 100 MeV currently but has accelerated high-power H+ beam to 800 MeV in the past) and supports five separate experimental areas that operate simultaneously with each having different timing and beam current requirements.

43 PARTICLE ACCELERATORS

Aerosol Optical Properties as Part of the Long-Term Aerosol Measurements in Puerto Rico (AOP-LAMP) Field Campaign Report

The University of Puerto Rico-Rio Piedras Campus (UPR-RP) has been measuring aerosol optical, chemical, and microphysical properties at Cape San Juan (CSJ, also known as CPR) since 2004. This site has also hosted several intensive field campaigns, with context provided by the long-term measurements. Hurricane Maria largely destroyed the station on September 20, 2017, forcing a cessation of the measurements. The scientific focus of this intensive operational period was to use a U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Mobile Facility (AMF) aerosol shelter to enable the resumption of long-term aerosol measurements. This AMF shelter is now the main aerosol shelter for CSJ operations.

54 ENVIRONMENTAL SCIENCES

Initial Characterization of the NREL Large-Amplitude Motion Platform

The Large Amplitude Motion Platform (LAMP) at NREL represents a significant advancement in the controlled testing of Wave Energy Converters (WECs) under laboratory conditions. Originally designed by E2M as a six-degree-of-freedom (DOF) Stewart platform for flight simulation, LAMP has been adapted by NREL to facilitate the mounting and evaluation of WECs. This adaptation enables dry testing of WECs using motion profiles similar to the ocean, facilitating the iterative design, testing, and validation of WEC performance prior to ocean deployments. This report presents the initial work completed to characterize LAMP, with particular emphasis on its stability and operational capabilities across various single and multi-degree-of-freedom (DOF) motion profiles. The report includes planned comparisons at three distinct mass payloads, aimed at assessing the platform's positional accuracy, frequency response, and endurance over extended runtime periods. These experimental tests are critical for establishing the platform's limitations and ensuring that the data generated during WEC validation is both accurate and reproducible. The outcomes of this study not only contribute to a deeper understanding of LAMP's capabilities but also lay the groundwork for future advancements in WEC testing methodologies. By providing robust and reliable performance data within a controlled laboratory setting, the findings are expected to significantly enhance the development and commercialization of marine energy technologies. This report presents the initial findings of the LAMP Characterization work and proposed steps to further understand and characterize LAMP. Data collected during this work can be found on MHKDR at: https://mhkdr.openei.org/submissions/602 Note that this report shares the measured/found instantaneous maximum operating range of LAMP. For most applications the maximum operating range cannot be used for system health and longevity. The operating range and capabilities of LAMP will be evaluated on a case-by-case basis, single-DOF position, velocity, and acceleration values presented in Table 4a-c, and Table 5 should be taken as instantaneous absolute maximum values. Future use of LAMP will likely be limited to smaller values.

16 TIDAL AND WAVE POWER

Vacuum-ultraviolet light source for enhanced production of metastable krypton and xenon beams

Here, we demonstrate excitation of metastable krypton and xenon beams using a vacuum ultraviolet lamp and directly compare the performance of this method to metastable excitation based on a radio-frequency-driven plasma discharge. In our apparatus, lamp-based metastable excitation outperforms the plasma discharge across a wide range of beam flux values relevant for atom trap trace analysis (ATTA). Moreover, we do not observe significant degradation in lamp performance after over 160 h of operation. We find that lamp-based excitation is particularly advantageous at the smallest and largest beam fluxes tested, demonstrating the utility of this approach both for improving krypton ATTA and for enabling the detection of radioactive xenon isotopes using ATTA. Finally, we demonstrate an additional enhancement to lamp-based metastable excitation efficiency and stability by applying an external magnetic field.

Metastable noble gases