At least 19 records

Novel Approach for Considering Ecosystem Services at Industrial Sites near Agricultural Lands

Natural resource damages from industrial operations have been studied for years at legacy sites, including the U.S. Department of Energy Hanford site in southeastern Washington State. Encompassing nearly 1,500 km2 (600 mi2), this site represents one of the world’s largest cleanup projects with an estimated cost exceeding $320 billion and perhaps double that. The site includes an extensive buffer zone beyond the relatively limited portion (15%) used for nuclear materials production and associated waste storage and disposal. Before Hanford existed, most of the local lands were used for agriculture, and that use has continued nearby. Historical data relevant to the natural resource damage assessment process include location-specific irrigation practices, rates of groundwater withdrawal, and sustainable yields. The potential for considering the benefit of an ecosystem service is also being explored. Undeveloped areas of the site have long provided natural habitat for a wide variety of species, including pollinators. Thus, adjacent agricultural lands have benefited from pollinator services for years. This study describes a novel approach for considering the benefit of increased crop value due to this pollinator service. The approach combines spatial data for local pollinator-dependent crops with pollinator abundance data. A production function is then applied to estimate the agro-economic value resulting from crop pollination. A preliminary analysis indicates that the increased value for apple crops alone near Hanford could be on the order of $80 million a year. The benefits from this ecosystem service could offer practical context as a complement to the assessment of natural resource damages.

MacDonell, Margaret M.↗

Novel Approach for Considering Ecosystem Services at Industrial Sites near Agricultural Lands - 19482

Natural resource damages from industrial operations have been studied for years at legacy sites, including the U.S. Department of Energy Hanford site in southeastern Washington State. Encompassing nearly 1,500 km{sup 2} (600 mi{sup 2}), this site represents one of the world's largest cleanup projects with an estimated cost exceeding $320 billion and perhaps double that. The site includes an extensive buffer zone beyond the relatively limited portion (15%) used for nuclear materials production and associated waste storage and disposal. Before Hanford existed, most of the local lands were used for agriculture, and that use has continued nearby. Historical data relevant to the natural resource damage assessment process include location-specific irrigation practices, rates of groundwater withdrawal, and sustainable yields. The potential for considering the benefit of an ecosystem service is also being explored. Undeveloped areas of the site have long provided natural habitat for a wide variety of species, including pollinators. Thus, adjacent agricultural lands have benefited from pollinator services for years. This study describes a novel approach for considering the benefit of increased crop value due to this pollinator service. The approach combines spatial data for local pollinator-dependent crops with pollinator abundance data. A production function is then applied to estimate the agro-economic value resulting from crop pollination. A preliminary analysis indicates that the increased value for apple crops alone near Hanford could be on the order of $80 million a year. The benefits from this ecosystem service could offer practical context as a complement to the assessment of natural resource damages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Update: M Area Closure

A progress update of the Recovery Act at work at the Savannah River Site. The celebration of the first area cleanup completion with the help of the Recovery Act.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges Achieved By Innovative Technologies Our Link to a Safer, Cleaner, Healthier Tomorrow - 12369

The River Corridor Closure Project is the nation's largest environmental cleanup closure project where innovative technologies are being utilized to overcome DOE's environmental clean-up challenges. DOE provides a Technology Needs Statement that specifies their on-site challenges and the criteria to overcome those challenges. This allows for both the private sector and federally funded organizations to respond with solutions that meet their immediate needs. DOE selects the company based on their ability to reduce risk to human health and the environment, improve efficiency of the cleanup, and lower costs. These technologies are our link to a cleaner, safer, healthier tomorrow. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

From Pushing Paper to Pushing Dirt - Canada's Largest LLRW Cleanup Gets Underway - 13111

The Port Hope Project is the larger of the two projects in the Port Hope Area Initiative (PHAI), Canada's largest low level radioactive waste (LLRW) cleanup. With a budget of approximately $1 billion, the Port Hope Project includes a broad and complex range of remedial elements from a state of the art water treatment plant, an engineered waste management facility, municipal solid waste removal, remediation of 18 major sites within the Municipality of Port Hope (MPH), sediment dredging and dewatering, an investigation of 4,800 properties (many of these homes) to identify LLRW and remediation of approximately 450 of these properties. This paper discusses the status of the Port Hope Project in terms of designs completed and regulatory approvals received, and sets out the scope and schedule for the remaining studies, engineering designs and remediation contracts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

River Corridor Closure at DOE's Hanford Site - 12503

The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permitted low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Near Real-Time Two and Three-Dimensional Electrical Geophysical Monitoring of Natural and Engineered Processes Associated with Subsurface Remediation - 16052

Legacy soil and groundwater contamination associated with nuclear weapons production is projected to be one of the largest cleanup liabilities to the U.S. Department of Energy for the foreseeable future. Remediation of subsurface contaminants is complicated by the combined effects of geochemical heterogeneity, geological heterogeneity, and the difficulty and expense of adequate borehole access. Each of these complications contributes to uncertainty in the distribution of contaminants and the performance of in situ treatments, which increases risk to human health and the environment and cost to closure in general. Electrical resistivity tomography (ERT) is a method of remotely imaging the electrical properties of the subsurface, which are governed by both geochemical and geological structure, thereby providing useful proxies for understanding contaminant distribution and the behavior in situ remediation processes. Recent advancements in both data collection and data processing capabilities are enabling ERT monitoring to be executed and provided to site operators in near real-time. To summarize the process, ERT surveys are rapidly and continuously collected during a time-sensitive operation such as an amendment injection. At the completion of each survey, data are transferred by wireless internet to offsite supercomputing resources for parallel tomographic inversion. Inversion results are then transferred back to onsite operators and/or other locations for visualization. In this paper, we demonstrate the utility of time-lapse ERT for monitoring fluid transport (both gas and liquid phase). We then demonstrate two real-time imaging applications for monitoring both natural and engineered processes at the Hanford Site within the vadose and the saturated zones. We expect this new capability for autonomous real-time imaging to enable ERT to be used as a cost-effective, short-term rapid feedback mechanism for guiding subsurface remediation injections, in addition to longer term monitoring of post-injection performance and environmental impact, all using the same electrode array and instrumentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D knowledge management information tool - a web based system developed to share D and D knowledge worldwide

Deactivation and decommissioning (D and D) work is a high risk and technically challenging enterprise within the U.S. Department of Energy complex. During the past three decades, the DOE's Office of Environmental Management has been in charge of carrying out one of the largest environmental restoration efforts in the world: the cleanup of the Manhattan Project legacy. In today's corporate world, worker experiences and knowledge that have developed over time represent a valuable corporate asset. The ever-dynamic workplace, coupled with an aging workforce, presents corporations with the ongoing challenge of preserving work-related experiences and knowledge for cross-generational knowledge transfer to the future workforce [5]. To prevent the D and D knowledge base and expertise from being lost over time, the DOE and the Applied Research Center at Florida International University (FIU) have developed the web-based Knowledge Management Information Tool (KM-IT) to capture and maintain this valuable information in a universally available and easily accessible and usable system. The D and D KM-IT was developed in collaboration with DOE Headquarters (HQ), the Energy Facility Contractors Group (EFCOG), and the ALARA [as low as reasonably achievable] Centers at Savannah River Sites to preserve the D and D information generated and collected by the D and D community. This is an open secured system that can be accessed from https://www.dndkm.org over the web and through mobile devices at https://m.dndkm.org. This knowledge system serves as a centralized repository and provides a common interface for D and D-related activities. It also improves efficiency by reducing the need to rediscover knowledge and promotes the reuse of existing knowledge. It is a community-driven system that facilitates the gathering, analyzing, storing, and sharing of knowledge and information within the D and D community. It assists the DOE D and D community in identifying potential solutions to their problem areas by using the vast resources and knowledge base available throughout the global D and D community. The D and D KM-IT offers a mechanism to the global D and D community for searching relevant D and D information and is focused on providing a single point of access into the collective knowledge base of the D and D community within and outside of the DOE. Collecting information from subject matter specialists, it builds a knowledge repository for future reference archiving Lessons Learned, Best Practices, ALARA reports, and other relevant documents and maintains a secured collaboration platform for the global D and D community to share knowledge. With the dynamic nature and evolution of the D and D knowledge base due to multiple factors such as changes in the workforce, new technologies and methodologies, economics, and regulations, the D and D KM-IT is being developed in a phased and modular fashion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HANFORD SITE CENTRAL PLATEAU CLEANUP COMPLETION STRATEGY

Cleanup of the Hanford Site is a complex and challenging undertaking. The U.S. Department of Energy (DOE) has developed a comprehensive vision for completing Hanford's cleanup mission including transition to post-cleanup activities. This vision includes 3 principle components of cleanup: the {approx}200 square miles ofland adjacent to the Columbia River, known as the River Corridor; the 75 square miles of land in the center of the Hanford Site, where the majority of the reprocessing and waste management activities have occurred, known as the Central Plateau; and the stored reprocessing wastes in the Central Plateau, the Tank Wastes. Cleanup of the River Corridor is well underway and is progressing towards completion of most cleanup actions by 2015. Tank waste cleanup is progressing on a longer schedule due to the complexity of the mission, with construction of the largest nuclear construction project in the United States, the Waste Treatment Plant, over 50% complete. With the progress on the River Corridor and Tank Waste, it is time to place increased emphasis on moving forward with cleanup of the Central Plateau. Cleanup of the Hanford Site has been proceeding under a framework defmed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In early 2009, the DOE, the State of Washington Department of Ecology, and the U.S. Environmental Protection Agency signed an Agreement in Principle in which the parties recognized the need to develop a more comprehensive strategy for cleanup of the Central Plateau. DOE agreed to develop a Central Plateau Cleanup Completion Strategy as a starting point for discussions. This DOE Strategy was the basis for negotiations between the Parties, discussions with the State of Oregon, the Hanford Advisory Board, and other Stakeholder groups (including open public meetings), and consultation with the Tribal Nations. The change packages to incorporate the Central Plateau Cleanup Completion Strategy were signed by the Parties on October 26,2010, and are now in the process of being implemented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Risk to Ecological Resources on Burial Waste Sites on the Hanford Site, Washington - 20248

The US and other nations have a large nuclear and chemical waste remediation task remaining from World War II, the Cold War, and industrial activities. The US Department of Energy (DOE) has the largest task in the U.S., with Hanford (Washington State) being the most contaminated site, with the longest and most costly cleanup program projected to extend to the end of the century. One of the greatest remediation problems at Hanford are the burial waste facilities, some of which are inside the 200 Areas on the Central Plateau, while others are outside the 200 Areas. These areas are associated with waste sites, pipes, and contaminated trenches, posing technical cleanup challenges to meet DoE's remediation goals, including protection of human health and the environment commensurate with Tri- Party Agreement and current regulatory requirements. In this paper we select one of the legacy waste sites (the BC Cribs and Trenches) as a case study to explore how risk to ecological resources varies during and as a consequence of remediation on sites primarily considered legacy waste sites. We used the risk methodology developed by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP) during the Hanford Site-wide Risk Review. The CRESP methodology included evaluating the risk to receptors, including human health, the Columbia River, groundwater, and ecological and cultural resources. The risk evaluation process for ecological receptors included defining the boundaries of each evaluation unit (EU) to be remediated, definition of a suitable buffer area that might be affected, and consideration of the known resource value based on field work. This information, coupled with known remediation options or strategies, allowed us to develop a risk rating for ecological resources. Site risks were evaluated on a scale of 'not discernible' to 'very high' risk. Consideration of the risks at the buried waste sites was complicated by uncertainties in remediation methods and the degree of restoration that would occur as part of the remediation process. We use the BC Cribs and Trenches as a case study to explore why the risks are low currently but increase during remediation. The current 'not discernible to low' risk rating is due to the lack of high quality ecological resources on the BC Cribs and Trenches EU, except for edge areas (with some state-listed species). During remediation the risks increase to 'medium', mainly due to high quality resources on adjacent buffer lands, which could be disrupted during active remediation. Medium and high quality resources on the edge of the site are continuous with higher quality native shrub-steppe habitat on the buffer. Ecological resources on some of the areas surrounding the 200 East and West Areas are some of the highest quality shrub-steppe areas on the Hanford Site, and risk to these resources could be prevented by planning before and during remediation to minimize disruption. For example, lay down areas for the BC Cribs and Trenches can be minimized by careful planning. Heavy truck and other vehicular traffic can be minimized. Spread of the noxious weeds now on some of the site can be prevented, and the spread of invasive species into the site (particularly near undisturbed shrub-steppe habitat) can be reduced. Further, the areas around and between the 200 East and West Areas have been largely undisturbed and can serve as a source of seeds and propagules for any revegetation that occurs as part of the remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2020 Vision for Tank Waste Cleanup (One System Integration) - 12506

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of waste are a by-product of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. The Cleanup of Hanford's 56 million gallons of radioactive and chemical waste stored in 177 large underground tanks represents the Department's largest and most complex environmental remediation project. Sixty percent by volume of the nation's high-level radioactive waste is stored in the underground tanks grouped into 18 'tank farms' on Hanford's central plateau. Hanford's mission to safely remove, treat and dispose of this waste includes the construction of a first-of-its-kind Waste Treatment Plant (WTP), ongoing retrieval of waste from single-shell tanks, and building or upgrading the waste feed delivery infrastructure that will deliver the waste to and support operations of the WTP beginning in 2019. Our discussion of the 2020 Vision for Hanford tank waste cleanup will address the significant progress made to date and ongoing activities to manage the operations of the tank farms and WTP as a single system capable of retrieving, delivering, treating and disposing Hanford's tank waste. The initiation of hot operations and subsequent full operations of the WTP are not only dependent upon the successful design and construction of the WTP, but also on appropriately preparing the tank farms and waste feed delivery infrastructure to reliably and consistently deliver waste feed to the WTP for many decades. The key components of the 2020 vision are: all WTP facilities are commissioned, turned-over and operational, achieving the earliest possible hot operations of completed WTP facilities, and supplying low-activity waste (LAW) feed directly to the LAW Facility using in-tank/near tank supplemental treatment technologies. A One System Integrated Project Team (IPT) was recently formed to focus on developing and executing the programs that will be critical to successful waste feed delivery and WTP startup. The team is comprised of members from Bechtel National, Inc. (BNI), Washington River Protection Solutions LLC (WRPS), and DOE-ORP and DOE-WTP. The IPT will combine WTP and WRPS capabilities in a mission-focused model that is clearly defined, empowered and cost efficient. The genesis for this new team and much of the 2020 vision is based on the work of an earlier team that was tasked with identifying the optimum approach to startup, commissioning, and turnover of WTP facilities for operations. This team worked backwards from 2020 - a date when the project will be completed and steady-state operations will be underway - and identified success criteria to achieving safe and efficient operations of the WTP. The team was not constrained by any existing contract work scope, labor, or funding parameters. Several essential strategies were identified to effectively realize the one-system model of integrated feed stream delivery, WTP operations, and product delivery, and to accomplish the team's vision of hot operations beginning in 2016: - Use a phased startup and turnover approach that will allow WTP facilities to be transitioned to an operational state on as short a timeline as credible. - Align Tank Farm (TF) and WTP objectives such that feed can be supplied to the WTP when it is required for hot operations. - Ensure immobilized waste and waste recycle streams can be received by the TF when required to support 2016 production of immobilized low-activity waste (ILAW). - Ensure the required baseline and additional funding is provided beginning in fiscal year 2011. - Modify TF and WTP contracts to adequately address this vision. The 2020 Vision provides a summary of strategies and key actions that optimize the approach to startup, commissioning, and turnover of WTP facilities. This vision focuses on the legally enforceable requirement to achieve the Consent Decree milestones of starting radioactive operations in 2019, and achieving initial WTP operations in 2022. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Indoor Radon Measurements from Residential Buildings with Basements in a Community with Potential LLRW Contamination - 19566

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities-Port Hope and Clarington. The PHAI (see reference for internet address) is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. Canadian Nuclear Laboratories (CNL) is implementing the PHAI on behalf of Atomic Energy of Canada Limited, a Federal Crown Corporation. An initial characterization and remediation program in the urban area of Port Hope was conducted from 1976 to 1981. The waste is the result of radium and uranium processing in Port Hope by the former Federal Crown Corporation Eldorado Nuclear Limited between 1933 and 1988. One contaminant of concern in the LLRW is radium-226 (Ra-226) which may lead to elevated indoor levels of radon-222 (Rn-222) indoors. As part of CNL's implementation of the PHAI, Arcadis is conducting the Port Hope Project Property Radiological Survey of approximately 4,800 small-scale sites to identify 1) properties that have not been affected by historic operations and 2) properties that have residual historic low-level radioactive waste impacts requiring remediation either for soils or for interior contamination or both. Over the last six years, a component of the Small Scale Sites (SSS) characterization surveys have measured radon concentrations in essentially all buildings in Port Hope using alpha-track detectors. All properties had subsurface characterization including analytical characterization and lithology following the radon measurement reporting to measure if soil concentrations exceeded the PHAI Cleanup Criteria (PHAI CC) for Ra-226 of 0.29 Bq/g. Buildings with radon gas exceeding a trigger level of 200 becquerels per cubic meter (Bq/m{sup 3}) or those with ventilation systems required investigation of soil concentrations around the perimeter of the building. Ra-226 concentrations above the background level of 0.05 Bq/g due to LLRW sources were forwarded to create remedial action plans (RAPs) to remove the contamination near the building. The SSS surveys provide a substantive data set on the approximately 3,000 properties measured to date with interior Rn-222 gas measurements and descriptions of the physical characteristics of the buildings, the lithology of soils near the buildings and the measurements of Ra-226 concentration in the soils on the property. Consideration of the potential for contribution from non-LLRW Ra-226 from natural sources or coal ash was required on some properties. This paper describes the data and exploratory analysis of the relationship(s) between LLRW and non-LLRW factors that affect the variation in indoor radon concentrations. Historical information on the urban area, the measured Ra-226 concentration and the age of the building were correlated with radon concentrations. A large variety of native soils are found in the complex terrain and the type of native soil was correlated with the radon concentrations. A statistical analysis to address the impact of co-related explanatory variables to model indoor radon concentrations is planned when the SSS activities are complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative: Information Management for A Very Large Radiation Survey - 19567

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities - Port Hope. The PHAI is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. The PHAI is being implemented by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. The waste is the result of radium and uranium processing in Port Hope by the former federal crown corporation Eldorado Nuclear Limited between 1933 and 1988. The waste has been distributed in the Municipality of Port Hope through placement of contaminated materials (e.g. fill), reuse of contaminated objects (e.g. tailings use in concrete, steel posts, structural wood) and air-borne deposition. Signature contaminants of potential concern (COPCs) are Ra-226, Th-230, uranium and arsenic; however, there are an additional 17 COPCs that also need to be considered. A very large amount of information has been collected during the survey and effectively managing and analyzing this information is critical to the success for the property owners, CNL's implementation of the PHAI, and Arcadis. Data collected during the survey includes information pertaining to long-term interior radon gas measurements, interior gamma radiation surveys, contaminated objects and surfaces, exterior gamma radiation and subsurface investigations. exterior gamma radiation surveys. The information management (IM) is structured with SharePoint as a focal point supported by an EQuIS database, mobile data collection and GIS support. The IM process for this project is being advanced using recent software developments to assist with internal activities (e.g. QA) and interactions with CNL including notifications and scheduling and status of property completion. Different applications have been developed to help automate, visualize, actively track, and QA different processes using recent software developments by Microsoft. We have used SharePoint to organize and track our data. Power BI has been used to actively track and visualize our data from Interior gamma surveying to exterior drilling. The creation of dynamic/advanced visualizations in Power BI gathers data daily from our multiple sources and analyzes it for anomalous data and trends. Microsoft Flow syncs with Power BI and has been implemented to automate many processes including the QA of surveys and soil results for identification of LLRW. To tie everything together, our GIS and EQuIS systems are our primary data compilation source that makes our advanced analytics/visualization and automation/tracking our data possible. Specific examples will be discussed, as will challenges encountered during the continuing development of the IM system. The incorporation of software advancements to the existing IM system for Port Hope characterization has improved the quality of the surveys, the tracking of completion, meeting schedule requirements and providing the required data for tracking, report preparation and supporting remediation of contamination on the properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Making a Lasting Impression: Recovery Act Reporting At Hanford - 12528

The award of American Recovery and Reinvestment Act funding came with an unprecedented request for transparency to showcase to the American public how the stimulus funding was being put to work to achieve the goals put forth by the U.S. Government. At the U.S. Department of Energy Hanford Site, this request manifested in a contract requirement to provide weekly narrative, photos and video to highlight Recovery Act-funded projects. For DOE contractor CH2M HILL Plateau Remediation Company (CH2M HILL), the largest recipient of Hanford's funding, the reporting mechanism evolved into a communications tool for documenting the highly technical cleanup, then effectively sharing that story with the DOE and its varying stakeholder audiences. The report set the groundwork for building a streaming narrative of week-by-week progress. With the end of the Recovery Act, CH2M HILL is applying lessons learned from this stringent, transparent reporting process to its long-term reporting and communications of the progress being made in nuclear decommissioning at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Community Based Concepts Become Reality - 16538

The Port Hope Area Initiative (PHAI) involves the cleanup of historic low-level radioactive waste (LLRW) resulting from radium and uranium processing by the former Crown Corporation, Eldorado Nuclear Limited, and its predecessor companies, during the period between 1932 and 1988. The PHAI, which is based on a legal agreement between the Government of Canada and the adjacent municipalities of Port Hope and Clarington in Ontario, Canada, comprises two separate community-initiated projects for the long-term management of the historic LLRW located in each of these municipalities. The Port Hope Project involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from various sites within the urban area of Port Hope, the construction and operation of an engineered aboveground mound where the waste will be safely contained, and the long-term maintenance and monitoring of the new waste management facility. The waste is currently located in 13 large-scale sites and an estimated 375 small-scale sites within the community. In contrast, the Port Granby Project involves the relocation of approximately 450,000 cubic metres of historic LLRW from the existing waste site on the north shore of Lake Ontario in rural Clarington, to a new engineered aboveground mound to be built 700 metres north of the shoreline. The work also involves the restoration of the existing site and long-term maintenance and monitoring the new facility. The PHAI entered Phase 2 (construction) of a three-phase program in early 2012, when $1.28 billion (Canadian) in federal funding was announced by the Minister of Natural Resources Canada. The funding, together with regulatory approval from the Canadian Nuclear Safety Commission (CNSC), which granted 10-year waste management licences to both projects, have permitted the PHAI to move forward with construction and remediation. Waste water treatment plants based on best-available technologies have been constructed for each project to remove a wide range of contaminants from groundwater, surface water and leachate collected during construction and operation of the aboveground mounds. Each treatment process has been designed to ensure the quality of treated water being discharged into Lake Ontario meets or exceeds stringent regulatory requirements, resulting in the enhanced protection of the Great Lakes Basin ecosystem. In 2015, the contract to build the Port Granby long-term waste management facility and remediate the existing waste site was awarded, and the long-awaited facility development will soon begin. The use of a dedicated internal waste transportation route along, which the LLRW will be trucked from the existing site to the new facility, is a key component of the design to minimize the impact on the local, rural community. In Port Hope, the removal of contaminated soil within the site for the new long-term management facility commenced in the fall of 2015. Over the next several years, multiple contracts will be awarded for construction and operation of the new waste management facility and remediation of the large and small-scale sites. In short, the Port Hope and Port Granby community-based concepts have matured into tangible projects with appropriate regulatory approvals and federal funding in place. Ongoing communications with the two communities have resulted in a well-informed public that understands the work to be done and is eager to see their projects take shape and become reality. As Canada's largest environmental remediation and restoration undertaking, the PHAI has never been closer to fulfilling its vision - working with the local communities to fulfil Canada's commitment for the cleanup of historic waste in Port Hope and Port Granby to leave an honourable legacy for future generations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Infrastructure and Mission Capability at Hanford - 19048

As Hanford celebrates its 75. anniversary, the challenge to complete the cleanup mission and simultaneously prepare for new nuclear operations puts increasing pressure on an infrastructure system that in some places is nearly the same age. While the cleanup mission began in earnest in 1989 and continues today, completing construction of the country's largest Waste Treatment and Immobilization Plant will put nuclear operations back into the Hanford footprint. Ensuring that the infrastructure originally built to support plutonium production as part of the Manhattan Project is the right size and reliable for the remaining missions is a delicate balance of funding priorities, strategy and a predictable project delivery. The DOE Richland Operations Office (DOE-RL) and other sites across the DOE complex have recognized the need for increased investment in site infrastructure. Combined with this increasing need is the funding reality of variable fiscal budgets that creates challenges for even the best strategists. The current Hanford infrastructure priority list has approximately 100 reliability projects with a combined value over $380 million dollars. At current funding levels, there is a 10 to 15-year backlog. To meet this challenge head on, DOE-RL and Mission Support Alliance (MSA) regularly evaluate project priorities and ongoing maintenance actions to ensure the highest risk systems are addressed. This is done by integrating historical and operational knowledge, system health reports, and maintenance records then coordinating with the Facility Information Management System (FIMS). Sometimes with decades old infrastructure, it can seem as if everything is a number one priority. Recently, in a random testing of approximately 20% of the wooden power poles on site, approximately 92% of the poles were found to be in satisfactory condition with 8% percent failing. MSA Electrical Utilities group immediately replaced one pole, found to have only 8% strength remaining. This type of severely degraded infrastructure is not conducive to reliable mission execution. Given the historical prioritization of funding for cleanup, then operations, followed by infrastructure, it is not surprising that the commitment of funds on infrastructure projects such as sewer collection systems or replacing old electrical transformers has been hard fought. The acknowledgement and re-prioritization of limited funds will work towards creating a more reliable and sustainable infrastructure portfolio that will support and even enhance the cleanup and operations missions. This paper/presentation will outline Hanford's approach to executing reliability projects that will serve the remaining missions on site for years to come. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing 5,000 Properties to Determine which Require Radiological Remediation - 19152

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (hLLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. Conducting work safely, while delivering the PHAI on time and within budget, is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.7 million cubic metres of hLLRW from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale sites (SSS) - primarily residential - in the Municipality of Port Hope for the presence or absence of hLLRW. This paper provides an overview of the characterization, delineation and design for remediation of historic LLRW for the SSS, a grouping of sites within the municipality comprised of residential properties, municipal properties including municipal road allowances, private road allowances and temporary storage sites. Comprising over 4,800 parcels of land, a robust remedial process was designed to identify, characterize, delineate and remediate interior and exterior hLLRW contamination found in soils and building materials. The process adheres to the framework of the Port Hope Project Waste Nuclear Substance Licence (License) and its associated governance frameworks and regulatory requirements [1]. The overall goal is for CNL to be able to issue the owner of each parcel of land a Compliance Letter stating that the site meets the PHAI Clean-up Criteria, either after completion of characterization (if no hLLRW is identified) or after completion of remediation and verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗