Search NASASearch

SEARCH · Search NASA

Results for “LAUNCH VEHICLE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Launch Vehicle Implications for Mars Exploration

The objectives of this paper are to give a brief insight into the launch vehicle implications for a manned Mars expedition and follow-on exploration; and secondly, to show the effects of such a mission requirement on the launch vehicle system. Due to the complexity and intricacy of the overall mission, vehicle system, and their interrelationships, only the very broad and salient points will be discussed.

F L Williams

Minimum Heating Re-Entry Trajectories for Advanced Hypersonic Launch Vehicles

Optimal re-entry trajectories are generated for reusable launch vehicles which minimize: (1) the heat absorbed at the vehicle surface, (2) the lower surface temperature, and (3) the heat absorbed by the internal structure. The approach uses the energy state approximation technique and a finite control volume heat transfer code coupled to a flight path integration code. These trajectories are compared to the optimal re-entry trajectory minimizing the integrated convective heat rate to determine which trajectory produces the minimum internal structural temperatures for a given thermal protection system. Three different thermal protection systems are considered: tile, blanket, and metallic.

Robert Windhorst

From Peenemuende to Outer Space

Commemorating the Fiftieth Birthday of Wernher von Braun. Launch vehicles and spacecraft for exploration of space and planets

SPACECRAFT

NASA Space Launch System Artemis I & II Post Flight Ascent Aerothermal Environments Overview

Since 2011 the Aerosciences Branch/EV33 at NASA Marshall Space Flight Center has been involved with the development of ascent external aerothermal environments for the NASA Space Launch System (SLS) Block 1 launch vehicle for the purposes of supporting thermal analysis and the design of thermal protection systems. The SLS Block 1 Artemis I and II launch vehicles successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022 and April 1st, 2026, respectively. Over 70 aerothermal islands, consisting of over 265 operational instruments captured aerodynamic heating and plume induced environments throughout the launch vehicles. Gauges consisted of calorimeters, radiometers, gas temperature probes, pressure transducers, bi-directional pressure probes and thermocouples. Prior to launch, aerothermal design environment models were generated to predict ascent aerodynamic heating and plume induced environments over a design space that covered a range of vehicle trajectories that varied atmospheric, vehicle performance, and off-nominal, engine-out conditions. Post flight reconstruction models were developed for each flight island using the Day-of-Launch (DOL) Best Equivalent Trajectory (BET) that provided freestream conditions and propulsion system boundary conditions. This paper discusses a summary of the ascent aerothermal environments observed during the flights and the respective modelling approaches and the performance of them through comparisons of flight data and predictions.

aerothermodynamics

Risk Reduction Project in Pad Abort-1 Launch Vehicle Loads & Dynamics

The Pad Abort (PA-1) system includes the Launch Abort System (LAS) and the Command Module (CM). The PA-1 abort flight test will launch from the White Sands Missile Range. Prior to the ignition, the vehicle will be resting, without restraints, on a short support structure. The Launch Abort Motor will ignite and burn for less than 5 seconds before a 20 second coast. Then the LAS will separate from the CM and the CM will descend via parachute to a soil landing. The static firing of the Abort Motor (ST-1) for PA-1 Launch Vehicle resulted in unexpected higher levels that superseded the environment predictions and all the design and test loads of all subassemblies and components. A rapid project was put in place to develop the flight environments, loads and associated uncertainties for the Verification Load Cycle (VLC) of PA-1. An acoustic test and shaker test of the CM were planned and executed in support of the developments of damping and transfer functions. Instead of using the traditional structure-borne envelops, the actual ST-1 pressures and forces were used to develop the internal accelerations. The PA-1 motor was cooled to 60 Deg F using thermal conditioning to reduce the thrust profile. The plumes of the abort motor were studied to determine if the airborne environments would be reduced. The combination of all items, noted above, allowed a reduction in loads for VLC.

Sasan C Armand

Advanced Composite Structures and Materials Technologies for Launch Vehicles

The NASA's Advanced Composites Technologies (ACT) Project has the potential to develop composite materials and structures technologies for the largest composite aerospace structures ever made. The objective the ACT Project of is to develop mid-technology readiness level (TRL) composite materials and structures technologies to TRL 6 for specific heavy lift Ares V launch vehicle and Altair lunar lander applications. To accomplish this objective, the ACT Project has four major technical elements: materials and manufacturing; structural concepts development and assessment of lightweight components; testing and evaluation; and highly loaded composite struts. The Project uses capabilities from across NASA to form multi-disciplinary, cross-center teams to meet the milestones of these technical elements. This presentation will describe the activities and plans for the ACT Project. Studies from the first execution year of the project will be summarized including results from materials selection and structural concept evaluation studies. Plans for continuing activities include studies for nondestructive evaluation/structural health monitoring, damage tolerance, joints, and material and structural testing, and these studies will be described. A major emphasis this fiscal year is the start of work for a manufacturing demonstration barrel. This structure will be composed of six, 5-m-diameter, 3-m-long curved panels that when assembled, result in a 10-m-diameter barrel. Activities related to the development of this structure will also be described.

Mark J Shuart

Ares I-X Ground Diagnostic Prototype

The automation of pre-launch diagnostics for launch vehicles offers three potential benefits: improving safety, reducing cost, and reducing launch delays. The Ares I-X Ground Diagnostic Prototype demonstrated anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage Thrust Vector Control and for the associated ground hydraulics while the vehicle was in the Vehicle Assembly Building at Kennedy Space Center (KSC) and while it was on the launch pad. The prototype combines three existing tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool from Qualtech Systems Inc. for fault isolation and diagnostics. The second tool, SHINE (Spacecraft Health Inference Engine), is a rule-based expert system that was developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification, and used the outputs of SHINE as inputs to TEAMS. The third tool, IMS (Inductive Monitoring System), is an anomaly detection tool that was developed at NASA Ames Research Center. The three tools were integrated and deployed to KSC, where they were interfaced with live data. This paper describes how the prototype performed during the period of time before the launch, including accuracy and computer resource usage. The paper concludes with some of the lessons that we learned from the experience of developing and deploying the prototype.

Machine Learning

Artemis I Space Launch System Base Heat Shield Thermal Protection System Performance

The Space Launch System (SLS) Core Stage base heat shield experienced the highest external heating environments on the entire launch vehicle during Artemis I ascent flight. This result was consistent with design predictions. The base heat shield experiences P50 cork combustion dynamics at low altitudes, plume-induced recirculation at moderate altitudes and then in-space base flow physics out to Main Engine Cut-Off (MECO). The base heat shield thermal protection system (TPS) is composed of a P50 cork ablator which is bonded to a substrate. The heat shield protects the gimbal actuation system, RS-25 turbomachinery systems and other aft section sensitive components during ascent. This paper estimates the base heat shield TPS performance from Artemis I using flight data from the NASA Langley Research Center’s Scientifically Calibrated In-Flight Imagery (SCIFLI) Airborne Multispectral Imager (SAMI), development flight instrumentation (DFI) and other TPS recession flight measurements. Predictions from computational and ground test-derived engineering ablation models and observations are also applied. Since no base heat shield substrate thermocouple data were obtained for Artemis I, an estimate of the TPS performance data is derived here. This data assesses thermal margin of the SLS Core Stage base heat shield and best informs the Artemis II Crewed mission to the moon.

aerothermodynamics

Manufacturing Research in Support of Saturn V

Research achievements applicable to the production of Saturn V components a r e described in this report. Leakage at the mechanical connections in high-pressure lines has been minimized or eliminated through the use of precisely flared tubes. Flaring to close tolerance is done with a n orbital flaring adapter, and the forming operation is precisely controlled with an electronic control console. A technique of “aging” or heat-treatment hardening of aluminum materials has been used to form cylindrical-tank segments and double-contoured gore segments precisely, and to remove weld distortions). The control of weld porosity has been improved as a result of research which demonstrated the close correlation between electrical energy input per inch of weld and weld porosity and metallurgical quality. Based on this information, the gas metallic arc method has been used successfully for two-pass welding, and thinner gage aluminum has been welded (LOX tunnel to fuel bulkhead) with an MSFC designed gas metallic arc unit.

COMPOSITE MATERIAL

General Purpose Data-Driven System Monitoring for Space Operations

Modern space propulsion and exploration system designs are becoming increasingly sophisticated and complex. Determining the health state of these systems using traditional methods is becoming more difficult as the number of sensors and component interactions grows. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. The Inductive Monitoring System (IMS) is a data-driven system health monitoring software tool that has been successfully applied to several aerospace applications. IMS uses a data mining technique called clustering to analyze archived system data and characterize normal interactions between parameters. This characterization, or model, of nominal operation is stored in a knowledge base that can be used for real-time system monitoring or for analysis of archived events. Ongoing and developing IMS space operations applications include International Space Station flight control, spacecraft vehicle system health management, launch vehicle ground operations, and fleet supportability. As a common thread of discussion this paper will employ the evolution of the IMS data-driven technique as related to several Integrated Systems Health Management (ISHM) elements. Thematically, the projects listed will be used as case studies. The maturation of IMS via projects where it has been deployed or is currently being integrated to aid in fault detection will be described. The paper will also explain how IMS can be used to complement a suite of other ISHM tools, providing initial fault detection support for diagnosis and recovery

Space Propulsion

General Purpose Data-Driven System Monitoring for Space Operations

Modern space propulsion and exploration system designs are becoming increasingly sophisticated and complex. Determining the health state of these systems using traditional methods is becoming more difficult as the number of sensors and component interactions grows. Data-driven monitoring techniques have been developed to address these issues by analyzing system operations data to automatically characterize normal system behavior. The Inductive Monitoring System (IMS) is a data-driven system health monitoring software tool that has been successfully applied to several aerospace applications. IMS uses a data mining technique called clustering to analyze archived system data and characterize normal interactions between parameters. This characterization, or model, of nominal operation is stored in a knowledge base that can be used for real-time system monitoring or for analysis of archived events. Ongoing and developing IMS space operations applications include International Space Station flight control, satellite vehicle system health management, launch vehicle ground operations, and fleet supportability. As a common thread of discussion this paper will employ the evolution of the IMS data-driven technique as related to several Integrated Systems Health Management (ISHM) elements. Thematically, the projects listed will be used as case studies. The maturation of IMS via projects where it has been deployed, or is currently being integrated to aid in fault detection will be described. The paper will also explain how IMS can be used to complement a suite of other ISHM tools, providing initial fault detection support for diagnosis and recovery.

Satellites

Moon Base Transportation - Deliveries to the Lunar Surface

Development of the Moon Base will enable a home away from home for astronauts who will live and work at humanity’s first lunar outpost. In this effort, NASA’s Moon Transportation Office is responsible for enabling the transformational missions required to deliver habitats, supplies, science payloads, and all other elements needed to cultivate a permanent presence on the Lunar Surface. The Mission Concept (MC) is characterized through evaluation of an end-to-end architecture that can successfully deliver a generalized heavy large-volume payload, in excess of 4000 kg, to a precision landing and touchdown on the lunar surface. The mission architecture utilizes a single launch configuration of a Lunar Lander (LL) with a unique propellant system. The LL has an integral orbital transfer capability and features jettisonable elements. The design circumvents the need for prop transfer on orbit and multiple launch configurations. The launch vehicle (LV) for this work will assume the capability to deliver a payload in excess of 40,000 kg to orbit, affording multiple LV solutions. Considerations for the LL and payload deployment from the fairing are assumed to be handled through compliance with a launch providers’ Interface Requirements Document (IRD). The MC will span from launch at Kennedy Space Center (KSC) to terminal descent and touchdown on the lunar surface, requiring a total ΔV on the order of 6 km/s beyond what is required to get the vehicle stack to a 200 km circular Low Earth Orbit (LEO). Major mission phases include: launch and launch vehicle separation, transfer operations, pre-landing navigation, and lunar descent and touchdown. A Concept of Operations (ConOps) is used as the primary design driver for defining architecture of the vehicles necessary to achieve final payload delivery. Numerous ground rules and assumptions will be provided for each phase of the mission. Concept designs for the LL is presented. An emphasis of the design maximizes a feasible path for maturation, manufacturing, and operation. A self-imposed practical consideration for this effort is the incorporation of legacy designed hardware to minimize expensive, time-intensive, and high-risk hardware development cycles. The propulsion system of the LL adopts a conventional storable bipropellant configuration of monomethyl hydrazine (MMH) and mixed oxides of nitrogen (MON3). This effort will showcase a unique propellant delivery system to minimize the reliance on propellant management devices (PMDs) during descent. Numerous key constraints have been considered, across the multiple segments of the mission. These include the unique aspects of center of gravity (CG) management, thruster plume effects including self-impingement, propulsion system hardware limitations, navigation during multiple mission phases, and landing gear geometry for uneven terrain. These constraints shape the trades necessary for precision landing of heavy cargo and ensure compatibility with broader Moon Base Transportation concepts. The resulting insights inform future transportation strategies for the Moon and beyond; directly contributing to the development of cargo‑delivery standards that will support the long‑term buildup of a sustainable, continuously inhabited Moon Base.

Lunar Habitat

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. In a previous publication, we discussed how we selected the three tools based primarily on their ability to be certified for human spaceflight and described our plans for the prototype. This abstract is due October 23, 2009, and the Ares I-X launch is currently scheduled for October 27, 2009. If this abstract is accepted, then the full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes. Also, the paper will describe the three tools and how they are used in the prototype. It will include a description of the TEAMS models of the Ares I-X first-stage TVC and associated ground hydraulics and how we adapted the TVC model for use in real-time diagnostics. It will describe the SHINE rules used for fault detection and mode identification and the software architecture that interfaces the various pieces of existing software that are part of the prototype to one another. It will describe how we selected the sensor values and commands that were used to train the IMS model and how we optimized the number of clusters in the IMS model. It will include screen shots of the graphical display that we developed in Java to display the outputs of the three tools. Because Ares I-X data was not yet available to us while we were developing the prototype, we used historical data from the Space Shuttle's Solid Rocket Booster (SRB) TVCs and the associated ground hydraulics to train IMS and to test the entire prototype. Because most of the failure modes that we modeled have never occurred in the Shuttle we inserted simulated failures into the Shuttle data. The Ares I-X first-stage TVC is very similar to the SRB TVC and we expect the data will be very similar. After the launch, we will determine how similar the data actually is and report how any differences in the data affected the diagnostic accuracy of the prototype. Finally, although we did not get the prototype certified, we designed it in a way that it could be certified and wrote a preliminary certification plan. The paper will include a brief summary of how we considered the need for certification in the design of the prototype, how we tested the prototype before deploying it to Hangar AE, and how we would propose to get it certified if it were deployed as an operational system. The paper will conclude with a description of some of the challenges we faced and some of the lessons learned in developing and deploying the prototype.

International Space Station

The Micrometeoroid Satellite Explorer XIII (1961 CHI)

Papers on the spacecraft, experiments, telemeter, and power supply systems, as well as the launch vehicle, for the Explorer XIII micrometeoroid satellite are presented. In addition to the major contributions from the Langley Research Center, two papers from the Goddard Space Flight Center are included. The preflight test program and results are discussed. Ascent flight data and orbital performance are also presented. Finally, separate sections describe the aims of the experiments, discuss the design development, construction, and performance of the apparatus used, and report the results.

Micrometeoroid

Enhancing Nasa Sounding Rocket Capabilities Through Composite Material Adoption

Sounding rockets are a suborbital research platform employed by NASA for heliophysics, astrophysics, and geospace science investigations, and for technology development. They follow semi-parabolic trajectories and are launched using surplus military, and commercial, solid-propellant rocket motors. NASA sounding rocket payloads are comprised of standard, modular subassemblies, designed to perform specific functions critical to achieving mission success criteria. Since the program’s inception, payload length and mass have trended upwards, limiting the capability of the platform to reach exospheric apogees and decreasing the time above critical altitudes to observe solar and celestial targets. To offset this trend, composite materials may be of use in payload and subsystem design to decrease payload mass. This investigation seeks to understand if there is a practical benefit to introducing composite materials on the NSRP by assessing mission specific impacts to those missions conducted in fiscal year 2024. To accurately estimate the mass of a composites-based payload, a standard subsystem (NIACS) underwent structural reconfiguration. Materials were selected that align with NSRP design, manufacturing, and testing standards. NIACS reconfiguration resulted in a mass reduction of 19.6% which was then applied to the payload system in entirety. Using vehicle performance carpet plots, delta apogee and time above the Kármán line were determined. Performance improvements were then evaluated against that mission’s success criteria to determine if that mission would have benefitted from using composite materials. On average, each mission would have gained 59.8 kilometers apogee and 62.9 seconds above the Kármán line. However, only nine of the seventeen missions would have benefitted from these performance improvements. Two of the missions could have used a lower-impulse launch vehicle to achieve mission success. Upleg stability met programmatic criteria; downleg instability and dynamic pressure improved, showing that ballast would not offset the mass reduction of using composite materials. Cost analysis showed that production costs will increase 39%. For the two missions that could have used a lower-impulse launch vehicle, the cost of the launch vehicle would have offset payload production costs. In summary, composite materials are not recommended for universal use on NASA sounding rocket payloads due to unclear programmatic benefits and added cost. However, they are justified for optical astrophysics and heliophysics missions, high-apogee (exosphere) requirements, or when they reduce payload costs versus higher impulse launch vehicles. Reflown, recoverable subsystems should use composites to enhance apogee and observation time.

Robert Henry Burth

Manned Lunar Landing Via Rendezvous

In any mission description, the vehicles, the flight profiles, and the astrionics hardware to im- plement the mission are all tightly interwoven things. A final result evolves only after many iterations to the solution are made. This paper will describe one of these iterations in the Saturn C-5 Earth Orbit Rendezvous approach to the Manned Lunar Landing Program. Since the iter- ation to be described in an nthone, there exists some basis for the hope that the perturbation from the final solution is small. This paper is not concerned with the landing itself, but only with those operations leading to injection of the space craft into the lunar trans- fer trajectory. However, as is to be expected, it is the target conditions which set the pace for the overall operation. The entire operation must be sized to culminate at a time and place which places the lunar target in an attainable position. The procedure would call for a burst of activity lasting over a relatively short time as compared to the long and extensive preparations leading up to it. The activity must be aimed at the opening of the lunar "launch window". Figure 1 illustrates the variation in the velocity increment required to launch a vehicle into a lunar transfer trajectory from a 485 kilometer earth orbit. The minima are at irregularly spaced intervals and are a func- tion of the inclination of the lunar and the earth satellite planes and of the position of the moon in its orbit around the earth (i. e. , the day of the month). In an operations analysis these spacings will influence the number of vehicles on the launch pad (primary and back-up) , their state of readi- ness, the firing rate, and also the flight profile to be chosen. Whether it is decided to go by "con- necting" or by "tanking" mode, the objective must be to get the spacecraft in the launch ready state at the opening of one of these launch windows. It may be desired that the first vehicle be capable of remaining in a functionally capable state even after bridging one or more of the gaps between the windows. This consideration will influence the design of the vehicles as well as the operational modes to be designed into the flight control hard- ware. For example, a sleep switch may be de- sirable from the standpoint of savings in battery we ight.

LUNAR LANDING

NASA Talks: Space Shuttle Columbia - Lessons Learned: Columbia Launch and Recovery

On February 25, 2026, this NASA Talk was held regarding the Space Shuttle Columbia (Columbia Launch & Recovery). Crew & Thermal System Division (EC) partnered with Kennedy Space Center (KSC) and Engineering Directorate (EA) to bring this talk to Johnson Space Center (JSC) centering on what led up to and transpired after the Space Shuttle Columbia accident. Some recovered debris was on exhibit during the talk. Retired NASA Columbia Vehicle Manager Scott Thurston presented this talk. Mr. Thurston brings a wealth of knowledge from his mission experience. This talk was timely and a solemn reminder of the critical importance of diligence, safety, and excellence in our work. EA Director Julie Kramer White welcomed the 400+ center-wide in-person audience, and EC Division Chief Rubik Sheth introduced the speakers. This event was held in the JSC Teague Auditorium, recorded, and executed by the EC in-house STAR Productions team. This record includes an mp4 video presentation with a run time of 36 min. 20 sec.; in color; with sound.

NASA Talks

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins