At least 19 records

Statistical Modeling of Peak Accelerating Gradients in LCLS-II and LCLS-II-HE

In this report, we study the vertical test gradient performance and the gradient degradation between vertical test and cryomodule test for the 1.3 GHz LCLS-II cavities. We develop a model of peak gradient statistics, and use our understanding of the LCLS-II results and the changes implemented for LCLS-II-HE to estimate the expected gradient statistics for the new machine. Finally, we lay out a plan to ensure that the LCLS-II-HE cryomodule gradient specifications are met while minimizing cavity disqualification by introducing a variable acceptance threshold for the accelerating gradient.

43 PARTICLE ACCELERATORS↗

Science Opportunities and Capabilities Enabled by LCLS-II and LCLS-II HE

X-Ray Science with LCLS-II and LCLS-II HE: Chemical dynamics: Reaction dynamics, charge transfer, molecular photocatalysts, natural & artificial photosynthesis; Catalysis: Homogeneous and heterogeneous catalysis, interfacial & geo/environmental chemistry; Materials Physics: Heterogeneity, spontaneous fluctuations, nonequilibrium dynamics, extreme environments; Quantum Materials: Emergent phenomena & collective excitations; Biological Function & Structural Dynamics: Dynamics in physiological environments.

43 PARTICLE ACCELERATORS↗

Multipacting Processing in Cryomodules For LCLS-II And LCLS-II-HE

Multipacting (MP) is a phenomenon which can affect stability in particle accelerators and limit performance in superconducting radio frequency cavities. In the TESLA shaped, 1.3 GHz, 9-cell cavities used in the LCLS-II (L2) and LCLS-II-HE (HE) projects, the MP-band (~17-24 MV/m) lies within the required accelerating gradients. For HE, the operating gradient of 20.8 MV/m lies well within the MP-band and cryomodule testing has confirmed that this is an issue. As such, MP processing for the HE cryomodule test program will be discussed. Early results on MP processing in cryomodules installed in the L2 linac will also be presented, demonstrating that the methods used in cryomodule acceptance testing are also successful at conditioning MP in the accelerator and that this processing is preserved in the mid-term.

43 PARTICLE ACCELERATORS↗

LCLS-II Cryomodules Production Experience and Lessons Learned Towards LCLS-II-HE Project

LCLS-II is an upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac consists of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF (SRF) continuous wave (CW) cryomodules with high quality factor cavities. Cryomodules were produced at Fermilab and at Jefferson Lab in collaboration with SLAC. Fermilab successfully completed the assembly, testing and delivery of seventeen 1.3 GHz and three 3.9 GHz cryomodules. LCLS-II-HE is a planned upgrade project to LCLS-II. The LCLS-II-HE linac will consist of twenty-three 1.3 GHz cryomodules with high gradient and high quality factor cavities. This paper presents LCLS-II-HE cryomodule production plans, emphasizing the improvements done based on the challenges, mitigations, and lessons learned from LCLS-II.

43 PARTICLE ACCELERATORS↗

LCLS-II-HE Cryomodule Testing at Fermilab

22 Linac Coherent Light Source II (LCLS-II) cryomodules were successfully tested at the Cryomodule Test Facility (CMTF) at Fermilab. Following the completion of the LCLS-II testing program, CMTF has shifted to testing cryomodules for the LCLS-II High Energy upgrade (LCLS-II-HE). The first LCLS-II-HE cryomodule, the verification cryomodule (vCM), was successfully tested and verified the readiness of LCLS-II-HE cryomodule testing at CMTF, and production cryomodule testing has begun. Presented here are the production cryomodule test acceptance criteria, testing plan, and cryomodule test results so far.

43 PARTICLE ACCELERATORS↗

Measuring Q₀ in LCLS-II Cryomodules Using Helium Liquid Level

The nitrogen-doped cavities used in the Linac Coherent Light Source II (LCLS-II) cryomodules have shown an unprecedented high Q₀ in vertical and cryomodule testing compared with cavities prepared with standard methods. While demonstration of high Q₀ in the test stand has been achieved, maintaining that performance in the linac is critical to the success of LCLS-II and future accelerator projects. The LCLS-II cryomodules required a novel method of measuring Q₀, due to hardware incompatibilities with existing procedures. Initially developed at Jefferson Lab during cryomodule acceptance testing before being used in the tunnel at SLAC, we use helium liquid level data to estimate the heat generated by cavities. We first establish the relationship between the rate of helium evaporation from known heat loads using electric heaters, and then use that relationship to determine heat from an RF load. Here we present the full procedure along with the development process, lessons learned, and reproducibility while demonstrating for the first time that world record Q₀ can be maintained within the real accelerator environment.

43 PARTICLE ACCELERATORS↗

Overview of CW electron guns and LCLS-II RF gun performance

Various continuous-wave (CW) electron gun technologies are reviewed, including DC, superconducting radio frequency RF (SRF), hybrid DC-SRF and normal-conducting RF. Also, the SLAC Linac Coherent Light Source II (LCLS-II) normal-conducting RF gun and injector are described, and the performance to date, including the bunch emittance achieved and the dark current observed, is presented.

43 PARTICLE ACCELERATORS↗

Status of the LCLS-II Cryogenic Distribution System

The LINAC Coherent Light Source II (LCLS-II) located at SLAC National Accelerator Laboratory (SLAC) in Menlo Park, CA, is a U.S. Department of Energy project tasked to design and build a world-class x-ray free-electron laser facility for scientific research. The Linac has superconducting radio frequency cryomodules that are connected to the cryogenic plant by the Cryogenic Distribution System (CDS), which consists of distribution boxes with heat exchangers and reliefs, feed caps, end caps, and surface, vertical, and bypass transfer lines. The CDS components were designed and built to specification by industry. The components have been delivered and their installation at SLAC will be discussed. The as-built relief system design will be presented, showing minimization of relief inlet pressure drops while meeting capacity requirements. The relieving flow pressure drops along the lengths of the CDS to centrally located reliefs at the distribution box were analysed to satisfy Pressure Vessel and Process Piping Code criteria to ensure relief performance. The sub-atmospheric 2 K circuit relieving approach will be discussed, which includes a three-way diverter isolation valve suitable for sub-atmospheric service. The component anchoring load design approach and installation into concrete floor will be discussed. This addresses loading, including seismic loading, along the component’s load path to floor anchoring system.

43 PARTICLE ACCELERATORS↗

Results from extended range SRF cavity tuner tests for LCLS-II-HE

The LCLS-II HE superconducting linac can produce multi-energy beams by supporting multiple undulator lines simultaneously. This could be achieved by using the cavity SRF tuner in the off-frequency detune mode. This off-frequency operation method was tested in 8 cryomodules at Fermilab at 2 K. In all the tests the tuners successfully achieved a frequency shift of -565±80 kHz from the 1.3 GHz value. This study discusses the cavity frequency during each stage of assembly from the cryomodule string to when they are finally tested at 2 K. Monitoring the cavity frequency from this initial stage contributed in reaching this large frequency shift. The specific procedures of tuner setting during assembly will be presented.

43 PARTICLE ACCELERATORS↗

Results from Extended Range SRF Cavity Tuner Tests for LCLS-II HE

The LCLS-II HE superconducting linac can produce multi-energy beams by supporting multiple undulator lines simultaneously. This could be achieved by using the cavity SRF tuner in the off-frequency detune mode. This off-frequency operation method was tested in 8 cryomodules at Fermilab at 2 K. In all tests, the tuners achieved a frequency shift of -565±80 kHz. This study will discuss cavity frequency during each step as it is being assembled in the cryomodule string and finally when it is being tested at 2 K. Tracking the cavity frequency helped enable the tuners to reach this large frequency shift. The specific procedures of tuner setting during assembly will be presented

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Microphonics in the LCLS-II Superconducting Linac

The LCLS-II project has installed a new superconducting linac at SLAC that consists of 35 1.3 GHz cryomodules and 2 3.9 GHz cryomodules. The linac will provide a 4 GeV electron beam for generating soft and hard X-ray pulses. Cavity detuning induced by microphonics was a significant design challenge for the LCLS-II cryomodules. Cryomodules were produced that were within the detuning specification (10 Hz for 1.3 GHz cryomodules) on test stands. Here we present first measurements of the microphonics in the installed LCLS-II superconducting linac. Overall, the microphonics in the linac are manageable with 94% of cavities coming within the detune specification. Only two cavities are gradient limited due to microphonics. We identify a leaking cool down valve as the source of microphonics limiting those two cavities.

43 PARTICLE ACCELERATORS↗

LCLS-II-HE Vertical Acceptance Testing Plans

LCLS-II-HE has performance requirements similar to but generally more demanding than those of LCLS-II, with an operating gradient of 21 MV/m (up from 16 MV/m in LCLS-II) and tighter restrictions on field emission and multipacting. In this paper, we outline the requirements for the 1.3 GHz cavities and the plans for qualification of these cavities by vertical test. We discuss lessons learned from LCLS-II and highlight the changes implemented in the vertical test procedure for the new project.

43 PARTICLE ACCELERATORS↗

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

LCLS-II-HE Status at Fermilab

The LCLS-II-HE project is an upgrade to the Linac Coherent Light Source facility at SLAC National Accelerator Laboratory. Fermilab is part of the LCLS-II-HE collaboration and will deliver 14 cryomodules to SLAC for LCLS-II-HE. These cryomodules consist of eight 1.3 GHz 9-cell cavities. Cryomodule production is in progress, and four cryomodules have been delivered to SLAC. One of the cryomodules already delivered is the verification cryomodule that reached 200 MV total voltage in continuous wave mode. Status of cryomodule production, and lessons learned will be presented. Fermilab is also designing a buncher cryomodule as part of a low emittance injector design for the project. The design is near completion, and status will be reported.

Kaluzny, Joshua↗

Multibunch Studies for LCLS-II High Energy Upgrade

The Linac Coherent Light Source (LCLS) X-ray free-electron laser at SLAC is being upgraded to LCLS-II with a superconducting linac and 1 MHz bunch repetition rate. The proposed high-energy upgrade (LCLS-II-HE) will increase the beam energy from 4 to 8 GeV, extending the reach of accessible X-ray photon energies. With the increased repetition rate and longer linac of LCLS-II-HE, multi-bunch effects are of greater concern. We use recently introduced capabilities in the beam transport code ELEGANT to study dipole and monopole beam breakup effects for LCLS-II HE beam parameters. The results indicate that resonant dipole kicks have steady-state settle times on the order of 500 bunches or less and appear manageable. We also consider a statistical variation of the cavity frequencies and transverse offsets of cavities and quadrupoles. Resonant emittance growth driven by monopole kicks is found to be disrupted by frequency variation between cavities.

43 PARTICLE ACCELERATORS↗

Cryomodules for LCLS-II High Energy

1.3 GHz cryomodules for LCLS-II High Energy (HE) at SLAC will utilize the proven design from LCLS-II. There will be a number of small changes to capture the as-built design for LCLS-II and optimize assembly, but the overall design concept is the same.

43 PARTICLE ACCELERATORS↗

LCLS-II Helium Refrigeration System Commissioning Results

SLAC National Accelerator Laboratory has upgraded to LCLS-II, featuring a 4 GeV superconducting linear accelerator composed of 37 cryomodules and two large helium refrigeration systems with a cooling capacity of 4 kW at 2.0 K. The LCLS-II Helium Refrigeration System (HRS) consists of two compressor stations, each with a power of approximately 4.5 MW, two 4.5 K cold boxes, each with a power of 18 kW equivalent at 4.5 K, and two sets of cold compressors that can each produce a flow of 230 g/s at 31 mbar (2.0K). Performance tests of the HRS were meticulously planned and successfully carried out, with results demonstrating that it exceeded the process requirements for LCLS-II operations. This paper provides a detailed presentation of the LCLS-II HRS performance and the challenges encountered during the commissioning phase.

42 ENGINEERING↗