Search NASA⌕ Search

SEARCH · Search NASA

Results for “LICENSING PROCEDURES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Development of the Licensing Procedure and Regulatory Framework for the Spent Fuel Storage facility in Korea - 16423

The Public Engagement Commission on SNF management (PECOS) published the recommendation report on the spent fuel management of Korea in June, 2015. Based on this report, the future national policy for spent fuel management of Korea has been established, taking into consideration the national/international trends on policy and technology development. Regardless of the recommendation report of PECOS, Spent fuel storage casks are necessary in Korea. Therefore, various types of spent fuel storage casks are now being developed by Korea vendors. For example, Concrete storage casks and dual purpose metal casks are now under development by the KORAD (Korea Radioactive waste agency) for future use in the interim storage facility. Unfortunately, there is no independent licensing procedure for spent fuel storage casks in Nuclear Safety Act (NSA) because is the casks are considered an integral part of the interim storage facility safety equipment. Furthermore, the definition of radioactive waste in the NSA was changed recently. Now, spent fuel is separated from the definition of 'radioactive waste'. Spent fuel can only become radioactive waste by the decision through the meeting of the relative ministers of Korea government. For that reason, the licensing procedure for interim spent fuel storage facilities was separated from the current 'disposal facility, etc.' in accordance with the article 63 of NSA. The aim of this study is to develop the licensing procedure for the storage cask, and also to develop a revised draft of interim storage facility procedure within the NSA. Once this independent licensing procedure on the spent fuel storage cask is introduced to the NSA, it is expected that developers or operators can develop and commercialize the storage cask in Korea. In this study, an independent licensing procedure for the spent fuel storage facility was developed including the storage cask licensing procedure for the NSA. The procedure was composed of the permit for construction and operation of interim storage facility, criteria for permit, inspection criteria, periodic safety review, and decommissioning criteria, etc. The detailed contents of these requirements were also developed to introduce the regulatory framework for the interim storage facility. Particularly, periodic safety review and decommissioning criteria were developed in accordance with the recommendation of IRRS (International Regulatory Review Service) of IAEA. The developed licensing procedure for spent fuel storage facility will be introduced in NSA in response to the revised definition of NSA and the recommendation report of PECOS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Nuclear Waste Management in Germany - Licensing Procedures for storage of SNF and Public Involvement - 19612

According to article 6 of the German Atomic Energy Act (AtG), storage of Spent Nuclear Fuel requires a license. The competent licensing authority in this field is the Federal Office for Safety of Nuclear Waste Management (BfE). According to the Act for selecting a repository site for heat-generating radioactive waste (HAW) (Site Selection Act - StandAG) dating from 2017, BfE has been assigned the task of developing, conducting, and evaluating public participation procedures in the process of site search and selection for a deep geological repository for radioactive waste and SNF. Article 6 AtG applies to interim storage of SNF. If the legally defined licensing conditions by article 6 (2) AtG are met, the storage license applied for has to be granted. For on-site facilities, interim storage has been limited to 40 years. The licensing procedures for interim storage of SNF are carried out in accordance with the general administrative procedural rules. In certain cases due to the Environmental Impact Assessment Act (EIA Act), an EIA has to be carried out. In these cases, a formalized licensing procedure including an involvement of the public is conducted. The Nuclear Licensing Procedure Ordinance (AtVfV) originating from 1977 and reformulated in 1995 defines formalized rules for the public participation procedure which have to be followed strictly. These include a public hearing. The risen objections are evaluated by the licensing authority and taken account of in the licensing decision. The process of repository site selection defined by the StandAG exceeds these formalized procedures significantly: The objective of this process is to achieve a broad social consensus about the site selection procedure and about a repository site that will offer the best possible safety for one million years. Therefore, the process has to be particularly transparent, and involvement of the public - including newly developed forms of public involvement - is an essential part of it. BfE as competent authority in both the fields of repository site search and selection and licensing of interim storage of SNF has recently developed new strategies of involving the public concerning interim storage of SNF. Supplementing the standard licensing procedures, BfE presently informs and involves the public about topical issues regarding the present state and recent developments in the field of interim storage of SNF. Current central topics are for example the return of HAW and MAW from reprocessing of SNF in France and UK as well as perspective longer interim storage periods on the interface with final disposal. Regarding longer interim storage, host communities of interim storage facilities are concerned that interim storage might be extended indefinitely. Additionally, there is a strong fear of transports of radioactive waste and SNF from one place to another. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development blind spots and environmental impact assessment: Tensions between policy, law and practice in Brazil's Xingu river basin

This paper explores the tensions involved in Environmental Impact Assessments (EIAs) and environmental licensing through a detailed analysis of the legal disputes and public contestations surrounding two projects, a large hydroelectric dam and a gold mine, which are proximately located to each other. Broadly, we argue that EIAs may function to reinforce rather than genuinely inform or potentially resist prevailing developmental logics. The research extends David Mosse's argument that development self-perpetuates “success” through participation and procedural licensing mechanisms while on-the-ground realities diverge significantly. It offers a critical examination of EIA utility and processes through identifying three general mechanisms within EIA and environmental licensing procedures that contribute to approval of projects and promote a perception of their legitimacy, while detracting from the intended purposes of EIAs as opportunities for meaningful public discussion and sustainability-oriented decision making. These mechanisms include discourses that entrench project necessity and make them appear inevitable, public participation, and the isolated treatment of related projects. This work situates an understanding of particular EIAs within a deeper process of regional territorial development and resource extraction.

54 ENVIRONMENTAL SCIENCES↗

HAZARD ANALYSIS OF DIGITAL ENGINEERED SAFETY FEATURES ACTUATION SYSTEM IN ADVANCED NUCLEAR POWER PLANTS USING A REDUNDANCY-GUIDED APPROACH

Replacing the existing aging analog instrumentation and control (I&C) systems with modern safety control and protection digital technology offers one of the foremost means of performance improvements and cost reductions for the existing nuclear power plants (NPPs). However, the qualification of digital I&C systems remains a challenge, especially considering the issue of software common-cause failures (CCFs), which are difficult to address. With the application and upgrades of advanced digital I&C systems, software CCFs have become a potential threat to plant safety because most redundant designs use similar digital platforms or software in the operating and application systems. With complex designs of multilayer redundancy to meet the single-failure criterion, digital I&C safety systems (e.g., engineered safety-features actuation system [ESFAS]) are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. This paper applies a modularized approach to conduct redundancy-guided systems-theoretic hazard analysis for an advanced digital ESFAS with multilevel redundancy designs. Systematic methods and risk-informed tools are incorporated to address both hardware and software CCFs, which provide guidance to eliminate the triggers of potential single points of failure in the design of digital safety systems in advanced plant designs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Seven good practices for the environmental licensing of coastal interventions: Lessons from the Italian, Cuban, Spanish and Colombian regulatory frameworks and insights on coastal processes

Highlights: • Environmental licensing procedures (ELP) line up by projects instead of environments. • The ELP of four countries was compared according to the generic EIA stages. • The study relies upon the revision of EIA legislation and technical guidelines. • Seven EIA good practices were extracted from the ELP analysis of the four countries. • A changing approach is proposed for the EPL performance on coastal interventions. - Abstract: Environmental licensing is the regulatory procedure that enforces the environmental impact assessment (EIA) of human activities inside a given country. Despite worldwide acceptance of EIA as a valid tool, its application in coastal environments is still too diverse and limited regarding the specificity of the natural processes influencing the shore. This paper compares the Environmental Licensing Procedure (ELP) of four countries, focusing on the activities that could affect the coastal geomorphology. The acquisition and validation of information were done through interviews with EIA representatives in each country, who signalized the official documents of environmental licensing and coastal management to be considered in the documentary review. The results present those differences and similarities among ELP stages in each country, based on the principles of the International Association of Impact Assessment and the national documents analyzed. In sum, 59 interventions associated with human uses and activities in the coastal zone were compared according to the prescriptive character of the environmental licensing in Italy, Spain, Cuba and Colombia. The natural processes influencing coastal geomorphology were also analyzed within the technical criteria included in the official guidelines for the EIA, finding a generalized weakness in processes associated with geochemical courses on coastal environments. By way of discussion, seven good practices are illustrated, according to their pertinence to the impact assessment of the coastal zone: 1) The integration of screening and scoping; 2) Evaluation focusing on the environment rather than the intervention; 3) Binding the coastal zone delimitation; 4) Institutional articulation; 5) Accreditation of environmental consultancies; 6) Official guidelines by types of environment; 7) The integration of environmental geographic information. Finally, general conclusions to assist EIA practitioners operating in the four countries and recommendations to lead further research are provided, introducing a novel process-oriented approach for ELP.

54 ENVIRONMENTAL SCIENCES↗

U.S. Nuclear Regulatory Commission Historical Perspectives of Very Low-Level Radioactive Waste - 18367

The United States Nuclear Regulatory Commission (NRC), in Title 10 of the Code of Federal Regulations Part 61 (10 CFR Part 61), 'Licensing Requirements for Land Disposal of Radioactive Waste', provides licensing procedures, performance objectives, and technical requirements for the issuance of licenses for the land disposal of low-level radioactive waste. Low-level radioactive waste is divided into four categories based on its potential risk and need for isolation. Class A is the lowest category of low-level radioactive waste and poses the least risk. A large percentage of Class A low-level waste contains very low radionuclide concentrations and does not pose a significant health and safety risk. In the current regulatory framework, this waste, referred to as low-activity or very low-level waste, is managed in the same manner as much more hazardous waste. In 1986 and 1990, as a result of the Low-Level Radioactive Waste Policy Amendments Act of 1985, the NRC issued the Below Regulatory Concern (BRC) policy statement. This policy statement established an implementation plan regarding the expeditious handling of rulemaking petitions 'to exempt specific radioactive waste streams from regulation due to the presence of radionuclides in sufficiently low concentrations or quantities as to be below regulatory concern.' The BRC policy statement provided a consistent risk framework when considering regulatory exemption decisions, such as: (1) the release for unrestricted public use of lands and structures containing residual radioactivity; (2) the distribution of consumer products containing small amounts of radioactive material; (3) the disposal of very low-level radioactive waste at other than licensed disposal sites; and (4) the recycling of slightly contaminated equipment and materials. Due to concerns with the BRC policy that were raised by Congress, the States, the public, and others, Congress enacted the Energy Policy Act of 1992, which revoked the NRC's 1986 and 1990 BRC policy statements and led to the NRC's formal withdrawal of the BRC policy in 1993. Stakeholders raised concerns on NRC's potential deregulation of radioactive material. Additionally, in March 2005, the NRC staff proposed a rule to amend 10 CFR Part 20, 'Standards for Protection Against Radiation,' to include radiological criteria for controlling the disposition of solid materials with very small amounts of residual radioactivity. The NRC staff also proposed a limited disposition approach for the disposition of solid material, limiting the release of solid material meeting a 0.01 milli-Sievert per year (mSv/yr) [1 milli-rem (mrem/yr)] dose criterion, from licensed control. In June 2005, the Commission disapproved publication of the proposed rule and deferred the rulemaking until a later time, stating that the NRC's existing approach of reviewing specific cases on an individual basis was fully protective of public health and safety. This rulemaking effort was discontinued by the Commission in 2016. Recently, several nuclear power plant licensees have announced early decommissioning of their facilities. Some stakeholders have expressed concerns about the capacity and disposal costs associated with using the four existing low-level waste disposal sites for very low levels of radioactive waste (i.e., waste at the low end of the Class A category). A more risk-informed, performance based approach to waste disposal would allow more flexibility in managing this waste commensurate with its risk and hazard. A new approach would also allow the NRC to align with international standards for this type of waste. The NRC is presently conducting a scoping study to identify the actions the agency should take to strengthen its regulatory framework for very low-level waste disposal. The Very Low-Level Waste (VLLW) scoping study will consider divergent stakeholder comments; lessons learned from the BRC policy statements and the proposed rule on radiological criteria for controlling the disposition of solid materials; and best practices of other countries with respect to VLLW disposal. The NRC will also engage other government agencies to discuss regulatory options for VLLW. This paper offers a historical overview of past NRC initiatives to manage the lower end of Class A waste in a manner that is risk informed and performance based. It examines previous endeavors and discusses the regulatory challenges that arose. It also addresses lessons learned and introduces NRC's current effort regarding very low-level radioactive waste disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Activation Calculation for the Dismantling and Decommissioning of a Light Water Reactor Using MCNP{sup TM} with ADVANTG and ORIGEN-S

The boiling water reactor (BWR) Philippsburg 1 (KKP1) and the pressurized water reactor (PWR) Neckarwestheim 1 (GKN I), with a thermal power of 2575 MW{sub th} resp. 2497 MW{sub th}, were shut down and entered directly the post-operational phase which is covered by the operating license held by the nuclear power plant owner. The decommissioning of a nuclear power plant (NPP) which is licensed under chap. 7 of the German Atomic Energy Act, following the post-operational phase requires a comprehensive licensing procedure including in particular radiation protection aspects and possible impacts to the environment. Decommissioning requires a decommissioning license. This will include essential changes in requirements for the systems and components and will mainly lead to the immediate dismantling of the nuclear power plant which is now the only permitted decommissioning strategy in Germany. In this context, neutron activation calculations for the structural components of KKP1 and GKN I have to be carried out to predict occurring activities and to estimate future costs for conditioning and packaging. To avoid an overestimation of the radioactive inventory and to calculate the expenses for decommissioning as accurate as possible, modern state-of-the-art Monte-Carlo-Techniques (MCNP6) combined with automated variance reduction tools (ADAVANTG) are used and are coupled with the activation and decay module ORIGEN-S. This paper presents the calculation procedure and the obtained results with a validation by measured activations and gamma dose rates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience by BAM in the Transport Package Safety Assessment of German Waste Containers - 18469

Transport and storage containers for low and mid-level radioactive waste are getting more and more of relevance due to the nuclear phase out decision in 2011. For higher activities Type B(U) approved waste containers will be needed for the shut down and dismantling phases of NPPs. It is expected that large quantities are required in the near future. German waste containers are generally approved for transport and interim storage and are also intended for the final disposal in the Konrad repository. BAM is involved in the authority licensing of transport package designs in Germany. In this context, BAM is responsible for the assessment of safe containment, mechanical, thermal and quality management issues. BAM also operates test facilities and performs drop as well as thermal tests during package licensing procedures. This paper summarizes our experience in the transport package design assessment of Type B(U) waste containers. A general overview of the approval process, the requirements and approaches BAM applies are described. Some examples are used to illustrate different aspects and technical issues we are addressing during the package assessment. In the first part of the paper the specific design aspects of German waste containers are described. Here, a general overview is given e.g. about closure systems, impact limiter designs, and the handling concepts. Furthermore, the wide range of radioactive content and their physical behavior including the impact on the packages assessment are described. The second part is focused on questions about the licensing and assessment process of German waste containers from the BAM authority point of view. The general approaches for the strategy of demonstration are outlined on the basis of the test conditions according to IAEA Regulations SSR-6. Furthermore, particular issues of the mechanical and thermal assessment with respect to the specific test conditions are discussed. For accident conditions of transport, aspects to be mentioned are e.g. the assessment of the lid bolts, the axial gap applied between content and lid, and the thermal behavior of the wood filled impact limiter after the fire test. However, issues of the assessment for routine and normal conditions of transport are addressed in this paper, too. The intention of this paper is introduce recent approval procedure experience in Germany, describing technical evaluation issues and so reduce rounds of questions during applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FERC Hydropower Licensing: A Review of Utilization of the ILP, TLP, and ALP

A preliminary consideration for license applicants seeking to develop non-federal hydropower projects includes determining whether the Federal Energy Regulatory Commission (FERC) has authority over the development, and if so, what licensing procedures are required or may be an option for authorizing the project. Projects subject to FERC jurisdiction, which do not meet the qualification requirements for an exemption from FERC hydropower licensing, must complete the FERC hydropower licensing process utilizing one of FERC's three licensing processes: The Integrated Licensing Process (ILP), Traditional Licensing Process (TLP), or Alternative Licensing Process (ALP). Effective after July 23, 2005, the ILP became the default hydropower licensing process under the FPA [18 CFR Section 5.3(a)(2)] and any license applicant seeking to use the TLP or ALP is now required to submit to FERC a request to use the TLP or ALP with their Notice of Intent (NOI) and Pre-Application Document (PAD) and receive approval before initiating either of those processes.

13 HYDRO ENERGY↗

An Integrated Risk Assessment Process of Safety-Related Digital I&C Systems in Nuclear Power Plants

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems will greatly benefit existing light water reactors. However, the issue of software common cause failure (CCF) remains an obstacle in terms of qualification for digital technologies. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, design flaws could cause software CCFs to become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multilayer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission licensing procedures. In Fiscal Year 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy’s Light Water Reactor Sustainability Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades and designs. An integrated risk assessment for the DI&C process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. Here this paper summarizes these RISA efforts in the risk analysis of safety-related DI&C systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

INTEGRATED RISK ASSESSMENT OF DIGITAL I&C SAFETY SYSTEMS FOR NUCLEAR POWER PLANTS

Upgrading the existing analog instrumentation and control (I&C) systems to state-of-the-art digital I&C (DI&C) systems provides the foremost means to improve performance and reduce costs for existing light-water reactors (LWRs). However, qualification of digital technologies remains a challenge?especially the issue of software common cause failure (CCF), which has been difficult to address. Existing analyses of CCFs in I&C systems mainly focus on hardware failures. With the application and upgrading of new DI&C systems, software CCFs due to design flaws might become a potential threat to plant safety, considering that most redundancy designs use similar digital platforms or software in their operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of particular concern in U.S. Nuclear Regulatory Commission (NRC) licensing procedures. In 2019, the Risk-Informed Systems Analysis (RISA) Pathway of the U.S. Department of Energy?s (DOE?s) Light Water Reactor Sustainability (LWRS) Program initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, secure DI&C technologies for digital upgrades/designs. An integrated risk assessment for the DI&C (RADIC) process was proposed for this strategy to identify potential key digital-induced failures, implement reliability analyses of related digital safety I&C systems, and evaluate the unanalyzed sequences introduced by these failures (particularly software CCFs) at the plant level. This paper summarizes these RISA efforts in the risk analysis of safety-related DI& systems at Idaho National Laboratory.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hazard analysis for identifying common cause failures of digital safety systems using a redundancy-guided systems-theoretic approach

Replacing the existing aging analog instrumentation and control (I&C) systems with modern safety control and protection, digital technology offers one of the foremost means of performance improvements and cost reductions for the existing nuclear power plants (NPPs). However, the qualification of digital I&C systems remains a challenge, especially considering the issue of software common-cause failures (CCFs), which are difficult to address. With the application and upgrades of advanced digital I&C systems, software CCFs have become a potential threat to plant safety because most redundant designs use similar digital platforms or software in the operating and application systems. With complex designs of multilayer redundancy to meet the single-failure criterion, digital I&C safety systems (e.g., engineered safety-features actuation system [ESFAS]) are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Here, this paper applies a modularized approach to conduct redundancy-guided systems-theoretic hazard analysis for an advanced digital ESFAS with multilevel redundancy designs. Systematic methods and risk-informed tools are incorporated to address both hardware and software CCFs, which provide guidance to eliminate the causal factors of potential single points of failure in the design of digital safety systems in advanced plant designs.

42 ENGINEERING↗

Final report on the MAGARC software consulting support contract (WFO No. 15904) for ITER magnet safety assessment

he ITER (not an acronym but Latin for "the Way”) International Organization (IO) is building a large-scale scientific experiment that is now under construction in Cadarache, France. The ITER Tokamak fusion reactor aims to demonstrate that it is possible to produce energy from fusion. The ITER’s power output goal is to deliver ten times the power it consumes. During its operational lifetime, ITER will test key technologies necessary for the next step: the demonstration fusion power plant that will prove that it is possible to capture fusion energy for commercial use. General information on the ITER project can be found at http://www.iter.org. The ITER reactor’s superconducting magnet systems create ~41GJ of stored magnetic field energy when fully energized. The consequences of such energy dissipating via electrical arcs under faulted conditions gives rise to safety concerns even though these fault events are extremely unlikely. As part of the ITER licensing procedure, and as a result of such safety concerns, this contract was established to benchmark a developing magnet safety analysis tool at Culham Centre for Fusion Energy against the MAGARC computer code. MAGARC was developed by the U.S. Idaho National Laboratory (INL) under the ITER Engineering Design Activity (EDA) Project and was applied to produce previous analyses, in order to support magnet fault and safety assessment for the ITER design description document. This contract report documents the completion of requested modifications to the MAGARC code by the ITER IO, a time-step size sensitivity analysis with MAGARC during an unmitigated quench event, a comparison of the modeling approaches taken in developing MAGARC and the CCFE analysis package, and the data required for the benchmarking activity for these codes.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

CASTOR V casks: quiver for damaged fuel rods

After the accident at Fukushima in 2011, 8 nuclear power plants (NPPs) in Germany were shut down immediately and parliament decided a phase-out of nuclear energy by 2022. As prerequisite for a quick dismantling of the shut-down NPPs, all fuel has to be removed from the spent fuel pools as soon as possible. For over 20 years, spent fuel assemblies from German NPPs have already been stored in CASTOR dual purpose casks by GNS. Already more than 1200 CASTOR casks are stored in dry interim storage facilities worldwide, and there is an additional demand for several hundred more casks for the remaining spent fuel assemblies in Germany until the final phase-out. Furthermore the phase-out decision has triggered the demand for a complementary solution for the damaged fuel rods that have been collected separately in the pools for disposal after the NPP shut-down. In 2011, GNS started to develop a disposal concept for these damaged fuel rods. For that purpose, GNS designed 2 quivers for damaged fuel rods to fit into square tubes of the basket of the CASTOR V/19 (PWR) and the CASTOR V/52 (BWR) respectively. The customisable internal baskets of the quivers facilitate the disposal of a large variety of nuclear inventory. Furthermore, the quiver features a robust design and a welded closure system. This design has been affirmed by a series of tests and qualification processes, supervised by the German authorities. This first of its kind solution ensures the dry interim storage of damaged fuel rods. The package design approval for the quiver for CASTOR V/19 is expected for 2016. This presentation will focus on the design of the Quivers in combination with the CASTOR V casks and describe the challenges during the licensing procedures. We will show the components of the Quiver and explain their mechanical characteristics during accident conditions of transport as well as the drying and welding process necessary to enable the long term storage of the Quivers. (authors)

42 ENGINEERING↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Facilitator's Perspective on Government Public Meetings on the Environmental and Energy Issues: The U.S. Nuclear Regulatory Commission Example - 20428

Many Federal, and State agencies, are required by policy or regulation, to hold a public meeting on a proposed regulatory action. These may be on a specific licensing issue or they may be to obtain public advice on generic issues, such as a proposed rulemaking or policy issue. Environmental or energy issues may often involve emotional behavior on the part of the public, and sometimes anger or protests. Consequently, trained facilitators are often used to 'facilitate' the meeting to reduce the tension and to help the meeting run smoothly. The United States Nuclear Regulatory Commission ('NRC') has had considerable experience with public meetings, emotional behavior by the public, and the use of facilitators. This paper will describe the history of the NRC with public meetings and public engagement, the issues that raise concerns by certain segments of the public, and how a facilitator will attempt to reduce the concern and anxiety at the meeting and to run a fair and constructive meeting. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

WIPP PA Sensitivity Studies in Support of CRA-2014 Completeness Determination and Compliance Decision - 18209

The Waste Isolation Pilot Plant (WIPP) has been developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of transuranic (TRU) waste. Containment of TRU waste at the WIPP is regulated by the U.S. Environmental Protection Agency (EPA). The DOE demonstrates compliance with the containment requirements by means of performance assessment (PA) calculations. WIPP PA calculations estimate the probability and consequence of potential radionuclide releases from the repository to the accessible environment for a regulatory period of 10,000 years after facility closure. Since TRU waste was first received at the WIPP in 1999, compliance recertification applications (CRAs) have been required by the EPA on five-year cycle. The latest CRA (CRA-2014) was submitted by the DOE to the EPA in 2014. As part of the application, a formal set of PA calculations (CRA-2014 PA) was performed and results were documented in detail. The CRA-2014 PA incorporated several parameter updates based on new data, as well as the implementation of a different model for panel closures, barriers planned for the opening of each waste panel. The results presented as part of the CRA-2014 showed via the required complementary cumulative distribution function (CCDF) release curves that the estimated releases were within compliance limits. As part of their process for reviewing the completeness of the CRA-2014 [1], the EPA formally requested that the DOE perform sensitivity studies based on EPA-requested changes to model parameters. The DOE performed and documented the results of three sensitivity studies described below: CRA14-SEN2 [2], CRA14-SEN3 [3], and CRA14-SEN4 [4]. In each case, the new analysis results were compared to CRA- 2014 PA (CRA14) results to determine the impact of the EPA-requested changes. CRA14-SEN2: the application of EPA-requested modified parameters in the operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model resulted in increased pressures and decreased brine saturations in waste areas and increased pressures and brine saturations in the operations and experimental areas. However, the overall effects on total high-probability mean releases from the repository were entirely insignificant. It was concluded that the modeling assumptions associated with the operations and experimental areas of the repository have an insignificant effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN3: the application of EPA-requested modified parameters in the panel closure areas and operations and experimental (non-waste) areas of the repository to simulate an accelerated (instantaneous) creep closure, the inclusion of capillary pressure effects on relative permeability, and an increase in initial/residual brine saturation and residual gas saturation. The modifications to the repository model predominantly result in increased pressures and decreased brine saturations in waste areas, increased pressures and brine saturations in the operations and experimental areas, and decreased brine and gas flows across all panel closures. The pressure increases in repository waste regions yielded slightly decreased brine saturations (on average) in those areas. However, the overall effects on total high-probability mean releases from the repository are entirely insignificant. It was concluded that the modeling assumptions made for this sensitivity study which were associated with the panel closures and north end areas of the repository have only a small effect on the prediction of total releases from the repository and/or adequacy of the current (CRA14) model to demonstrate compliance with the regulatory limits. CRA14-SEN4: the application of several changes to the current WIPP PA model (CRA14), including: parameter changes, use of an updated code, and a revised computational grid for the BRAGFLO code. The modifications to the repository model resulted in increased releases in all primary release mechanisms. The impacts of each EPA-requested change to CRA14 were analyzed with respect to each release mechanism in the CRA14-SEN4 study. Overall, total high-probability predicted mean releases from the repository were increased by about 15%. Total low-probability predicted mean releases were increased by about 107%. It was concluded that the EPA-requested changes to the CRA14 result in increases to the predicted total releases from the repository. However, releases calculated in the CRA14-SEN4 analysis remained below regulatory limits, demonstrating continued compliance of the WIPP. In January 2017, the EPA determined that CRA-2014 was complete and then began a technical evaluation of CRA-2014 to determine whether the WIPP continued to comply with the radiation protection standards for disposal. During their evaluation, the EPA utilized the sensitivity study results to inform their ultimate determination in July 2017 that the WIPP continues to comply with regulatory standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗