Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Countdown”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The evolution of computer monitoring of real time data during the Atlas Centaur launch countdown

In the last decade, improvements in computer technology have provided new 'tools' for controlling and monitoring critical missile systems. In this connection, computers have gradually taken a large role in monitoring all flights and ground systems on the Atlas Centaur. The wide body Centaur which will be launched in the Space Shuttle Cargo Bay will use computers to an even greater extent. It is planned to use the wide body Centaur to boost the Galileo spacecraft toward Jupiter in 1985. The critical systems which must be monitored prior to liftoff are examined. Computers have now been programmed to monitor all critical parameters continuously. At this time, there are two separate computer systems used to monitor these parameters.

Thomas, W. F.↗

Artemis I Countdown 101

Before the Artemis I mission launches on its way around the Moon, the launch team at Kennedy Space Center and supporting teams across the country will begin the launch countdown about two days before liftoff. The launch countdown contains "L Minus” and "T Minus" times. "L minus" indicates how far away we are from liftoff in hours and minutes and does not include built-in holds. “T minus” time is a sequence of events that are built into the launch countdown where counting and holds are inserted. The 730,000 gallons of propellants that will be loaded into the rocket are liquid oxygen (LO2) and liquid hydrogen (LH2). Pauses in the countdown, or "holds," are built into the countdown to allow the launch team to target a precise launch window, and to provide a cushion of time for certain tasks and procedures without impacting the overall schedule. For the Artemis I countdown, planned built-in holds vary in length and occur at the following times: L-8 hours, 40 minutes, and L-40 minutes.

Madison Elizabeth Tuttle↗

Space Shuttle Launch Probability Analysis: Understanding History so We Can Predict the Future

The Space Shuttle was launched 135 times and nearly half of those launches required 2 or more launch attempts. The Space Shuttle launch countdown historical data of 250 launch attempts provides a wealth of data that is important to analyze for strictly historical purposes as well as for use in predicting future launch vehicle launch countdown performance. This paper provides a statistical analysis of all Space Shuttle launch attempts including the empirical probability of launch on any given attempt and the cumulative probability of launch relative to the planned launch date at the start of the initial launch countdown. This information can be used to facilitate launch probability predictions of future launch vehicles such as NASA's Space Shuttle derived SLS. Understanding the cumulative probability of launch is particularly important for missions to Mars since the launch opportunities are relatively short in duration and one must wait for 2 years before a subsequent attempt can begin.

Cates, Grant R.↗

Use of DES Modeling for Determining Launch Availability for SLS

The National Aeronautics and Space Administration (NASA) is developing new capabilities for human and scientific exploration beyond Earth's orbit. This effort includes the Space Shuttle derived Space Launch System (SLS), the Multi-Purpose Crew Vehicle (MPCV) "Orion", and the Ground Systems Development and Operations (GSDO). There are several requirements and Technical Performance Measures (TPMs) that have been levied by the Exploration Systems Development (ESD) upon the SLS, MPCV, and GSDO Programs including an integrated Launch Availability (LA) TPM. The LA TPM is used to drive into the SLS, Orion and GSDO designs a high confidence of successfully launching exploration missions that have narrow Earth departure windows. The LA TPM takes into consideration the reliability of the overall system (SLS, Orion and GSDO), natural environments, likelihood of a failure, and the time required to recover from an anomaly. A challenge with the LA TPM is the interrelationships between SLS, Orion, GSDO and the natural environments during launch countdown and launch delays that makes it impossible to develop an analytical solution for calculating the integrated launch probability. This paper provides an overview of how Discrete Event Simulation (DES) modeling was used to develop the LA TPM, how it was allocated down to the individual programs, and how the LA analysis is being used to inform and drive the SLS, Orion, and GSDO designs to ensure adequate launch availability for future human exploration.

Watson, Mike↗

Use of DES Modeling for Determining Launch Availability for SLS

The National Aeronautics and Space Administration (NASA) is developing new capabilities for human and scientific exploration beyond Earth's orbit. This effort includes the Space Shuttle derived Space Launch System (SLS), the Orion Multi-Purpose Crew Vehicle (MPCV), and the Ground Systems Development and Operations (GSDO). There are several requirements and Technical Performance Measures (TPMs) that have been levied by the Exploration Systems Development (ESD) upon the SLS, Orion, and GSDO Programs including an integrated Launch Availability (LA) TPM. The LA TPM is used to drive into the SLS, Orion and GSDO designs a high confidence of successfully launching exploration missions that have narrow Earth departure windows. The LA TPM takes into consideration the reliability of the overall system (SLS, Orion and GSDO), natural environments, likelihood of a failure, and the time required to recover from an anomaly. A challenge with the LA TPM is the interrelationships between SLS, Orion, GSDO and the natural environments during launch countdown and launch delays that makes it impossible to develop an analytical solution for calculating the integrated launch probability. This paper provides an overview of how Discrete Event Simulation (DES) modeling was used to develop the LA TPM, how it was allocated down to the individual programs, and how the LA analysis is being used to inform and drive the SLS, Orion, and GSDO designs to ensure adequate launch availability for future human exploration.

Staton, Eric↗

STS-114: Discovery L-2 Countdown Status Briefing

George Diller of NASA Public Affairs hosted this briefing. Pete Nickolenko, NASA Test Director; Scott Higgenbotham, STS-114 Payload-Mission Manager; Cathy Winters, Shuttle Weather Officer were present. Pete reports his team has completed the avionics system check ups, servicing of the cryogenic tanks will take about seven hours that day, and will perform engine system checks and pad close outs come evening. Pete also summarized other standard close out activities: check ups of the Orbiter and ground communications network, rotary service, structure retraction, and external tank load (ETL). Pete reported that the mission will be 12 days with two weather contingency days, and end of mission landing scheduled at Kennedy Space Center (KSC) at approximately 11:00 in the morning, Eastern time on July 25th. Scott briefly reported that all hardware is on board Discovery, closed out, and ready to fly. Cathy reported that hurricane Dennis moved to the North and looking forward to launch. She mentioned of a new hurricane looming and will be named Emily, spotted some crosswinds which will migrate to the west, there is 30% probability weather prohibiting launch. Cathy further gave current weather forecast supported with charts: the Launch Forecast, Tanking Forecast, SRB (Shuttle Solid Rocket Booster) Forecast, CONUS and TAL Launch Sites Forecast, and with 24 hours and 48 hours turn around plan. Launch constraints, weather, crosswinds, cloud cover, ground imagery system, launch countdown, launch crews, mission management simulations, launch team simulations were topics covered with the News Media.

Source record↗

Using Discrete Event Simulation to Model Integrated Commodities Consumption for a Launch Campaign of the Space Launch System

In May 2013, NASA's GSDO Program requested a study to develop a discrete event simulation (DES) model that analyzes the launch campaign process of the Space Launch System (SLS) from an integrated commodities perspective. The scope of the study includes launch countdown and scrub turnaround and focuses on four core launch commodities: hydrogen, oxygen, nitrogen, and helium. Previously, the commodities were only analyzed individually and deterministically for their launch support capability, but this study was the first to integrate them to examine the impact of their interactions on a launch campaign as well as the effects of process variability on commodity availability. The study produced a validated DES model with Rockwell Arena that showed that Kennedy Space Center's ground systems were capable of supporting a 48-hour scrub turnaround for the SLS. The model will be maintained and updated to provide commodity consumption analysis of future ground system and SLS configurations.

Commodities↗

STS-114: Discovery L-1 Countdown Status Briefing STS-114/Discovery L-2 Countdown Status Briefing

Bruce Buckingham from NASA Public Affairs introduces Jeff Spaulding, NASA Test Director and Kathy Winters, Shuttle Weather Officer in this L-2 countdown status briefing. Spaulding gives the Space Shuttle launch countdown status before lift-off on July 26th. He expresses that vehicle launch and ground systems are performing well and that there are no significant issues in preparation for the launch. The crew arrival time to the launching pad and the launch window for Discovery is also discussed. He ends his countdown status by expressing that the Discovery Orbiter is the safest Shuttle to date. Kathy Winters gives her weather forecast for the launch day. She presents a satellite picture of tropical storm Franklin and charts showing the STS-114 Tanking Forecast, Launch Forecast, Solid Rocket Booster (SRB) recovery, Continental United States (CONUS) launch, Transoceanic Abort Landing (TAL) launch, 24 and 48 Hour Delay, CONUS 24 and 48 hour delay, and TAL 24 and 48 hr delay. Questions from the news media about the mood of the test engineers as launch day is approached are answered. Jessica Rye from NASA Public Affairs introduces Pete Nikolento, NASA Test Director; Scott Higgenbotham, STS-114 Payload Mission Manager; and Kathy Winters, Space Shuttle Weather Officer in this L-1 Countdown Status Briefing. Nikolento expresses that the completion of the main engine system check-outs and servicing of on-board fuel-cell reactants have been completed. He also talks about pad closeouts and external cryogenic loads prior to launch. Scott Higgenbotham gives the payload status and Kathy Winters talks about her weather forecast for launch. Questions about the ecosensors, TAL sites, weather forecast and thoughts about return to flight are addressed.

Source record↗

STS-105 Pre-Launch Press Conference

George Diller, NASA Public Affairs, introduces Bill Gerstenmaier, Deputy Manager of the ISS Program, Dave King, NASA Director of Shuttle Processing, and Judy Konecky, Staff Meteorologist, in this STS-105 press conference. An overview is given of the success of the Expedition 2 crew, the expectations of the Expedition 3 crew, the launch countdown status, and the weather forecast for the Shuttle launch. They then answer questions from the press.

Source record↗

STS-114: Discovery Post MMT Press Conference

Bruce Buckingham, NASA Public Affairs hosted this conference. Bill Parsons, Space Shuttle Program Manager; John Muratore, Shuttle System and Integration Manager; Mike Wetmore, Shuttle Processing Director were present. The Panel summarizes that thorough effort of analysis and test techniques and great amount of work is being done to fix the sensor problem and will be ready to call the stations for a launch countdown process after the trouble shooting is fully completed. Launch time, grounding problem, sensor failure, trouble shooting, tanking test, pin swap, and heaters were topics covered with the News media. For clarification, Bruce Buckingham provided information that preferred launch time is at 10:39am on July 26, Eastern Time.

Source record↗

Climatological Study of the Short-Term Variation of the 0 C, -10 C, and -20 C Altitude Levels over the Florida Spaceport

For evaluation of the potential of cloud electrification, it is necessary to know the altitude of the 0, -10 and -20 degree Celsius levels. Cape Canaveral Air Force Station has recorded balloon launch data back to 1989. In support of rocket launches, often multiple balloons are launched within minutes of each other in the 4-6 hours leading up to launch. In the past, temperature data from sondes was typically available every hour or so through the launch countdown, allowing for frequent updates of these critical temperature thresholds. Recently, launch customers are relying on Jimsphere and wind profiler data that do not have a thermodynamic component in the latter 4-6 hours of a countdown. This study compares the altitude differences of the 0, -10 and -20 degree Celsius levels from consecutive balloon pairs not to exceed 6 hours apart. The analysis uses 9685 soundings from 1989 to 2013. Approximately 5 of the time the altitude of the temperature level in question (0, -10, -20 degrees C), varies by more than 500 feet (operationally significant threshold) within 6 hours. This study analyzes the altitude variability as a function of several meteorological parameters, such as change in sonde type, dew point depression, and solar zenith angle. Additionally, the study concludes with impacts to launch operations.

Huddleston, Lisa L.↗

Climatological Study of the Short-Term Variation of the 0 C, -10 C, AND -20 C Altitude Levels Over the Florida Spaceport

For evaluation of the potential of cloud electrification, it is necessary to know the altitude of the 0, -10 and -20 degree Celsius levels. Cape Canaveral Air Force Station has recorded balloon launch data back to 1989. In support of rocket launches, often multiple balloons are launched within minutes of each other in the 4-6 hours leading up to launch. In the past, temperature data from sondes was typically available every hour or so through the launch countdown, allowing for frequent updates of these critical temperature thresholds. Recently, launch customers are relying on jimsphere and wind profiler data that do not have a thermodynamic component in the latter 4-6 hours of a countdown. This study compares the altitude differences of the 0, -10 and -20 degree Celsius levels from GPS-tracked consecutive balloon pairs not to exceed 6 hours apart. The analysis uses 3,198 soundings from 2001 to 2013. Approximately 20, 17, and 13 percent of the time the altitude of the temperature level in question (0, -10, -20 degrees C respectively), varies by more than 500 feet (operationally significant threshold) within 6 hours. This study analyzes the altitude variability as a function of several meteorological parameters, such as dew point depression and solar zenith angle. Additionally, the study concludes with impacts to launch operations.

altitude of 0 degree C temperature level↗

An analysis of Space Shuttle countdown activities: Preliminaries to a computational model of the NASA Test Director

Before all systems are go just prior to the launch of a space shuttle, thousands of operations and tests have been performed to ensure that all shuttle and support subsystems are operational and ready for launch. These steps, which range from activating the orbiter's flight computers to removing the launch pad from the itinerary of the NASA tour buses, are carried out by launch team members at various locations and with highly specialized fields of expertise. The liability for coordinating these diverse activities rests with the NASA Test Director (NTD) at NASA-Kennedy. The behavior is being studied of the NTD with the goal of building a detailed computational model of that behavior; the results of that analysis to date are given. The NTD's performance is described in detail, as a team member who must coordinate a complex task through efficient audio communication, as well as an individual taking notes and consulting manuals. A model of the routine cognitive skill used by the NTD to follow the launch countdown procedure manual was implemented using the Soar cognitive architecture. Several examples are given of how such a model could aid in evaluating proposed computer support systems.

John, Bonnie E.↗

Temporal Variability of Upper-level Winds at the Eastern Range, Western Range and Wallops Flight Facility

Space launch vehicle commit-to-launch decisions include an assessment of the upper-level (UL) atmospheric wind environment to assess the vehicle's controllability and structural integrity during ascent. These assessments occur at predetermined times during the launch countdown based on measured wind data obtained prior to the assessment. However, the pre-launch measured winds may not represent the wind environment during the vehicle ascent. Uncertainty in the UL winds over the time period between the assessment and launch can be mitigated by a statistical analysis of wind change over time periods of interest using historical data from the launch range. Without historical data, theoretical wind models must be used, which can result in inaccurate wind placards that misrepresent launch availability. Using an overconservative model could result in overly restrictive vehicle wind placards, thus potentially reducing launch availability. Conversely, using an under-conservative model could result in launching into winds that might damage or destroy the vehicle. A large sample of measured wind profiles best characterizes the wind change environment. These historical databases consist of a certain number of wind pairs, where two wind profile measurements spaced by the time period of interest define a pair.

Decker, Ryan K.↗