Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Loads Lock Mechanism”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Launch Lock Mechanism for Resource Prospector Rover

The Resource Prospector Rover is being designed to carry the RESOLVE (Regolith Environment Science, and Oxygen Lunar Volatile Extraction) payload on a mission to the Moon to prospect for water ice. This is a joint project between KSC Swamp Works UB-R1 and JSC. JSC is building the Resource Prospector 2015 (RP15) rover and KSC designed and fabricated a Launch-Lock (LL) hold down mechanism for the rover. The LL mechanism will attach and support the rover on a Lunar Lander during launch and transit to the moon, then release the RP15 rover after touchdown on the lunar surface. This report presents the design and development of the LL mechanism and its unique features which make it suitable for this lunar exploration mission. An EDU (engineering development unit) prototype of the LL has been built and tested at KSC which is the subject of this paper.

Lunar Lander↗

Load measurement system with load cell lock-out mechanism

In the frame work of the project Shuttle Plume Impingement Flight Experiment (SPIFEX), a Load Measurement System was developed and fabricated to measure the impingement force of Shuttle Reaction Control System (RCS) jets. The Load Measurement System is a force sensing system that measures any combination of normal and shear forces up to 40 N (9 lbf) in the normal direction and 22 N (5 lbf) in the shear direction with an accuracy of +/- 0.04 N (+/- 0.01 lbf) Since high resolution is required for the force measurement, the Load Measurement System is built with highly sensitive load cells. To protect these fragile load cells in the non-operational mode from being damaged due to flight loads such as launch and landing loads of the Shuttle vehicle, a motor driven device known as the Load Cell Lock-Out Mechanism was built. This Lock-Out Mechanism isolates the load cells from flight loads and re-engages the load cells for the force measurement experiment once in space. With this highly effective protection system, the SPIFEX load measurement experiment was successfully conducted on STS-44 in September 1994 with all load cells operating properly and reading impingement forces as expected.

Le, Thang↗

A multipurpose satellite ejection system

A design is presented for a pneumatic ejection system capable of ejecting a spin stabilized satellite from the cargo bay of space vehicles. This system was orginally designed for use on the Spacelab 6 shuttle mission, but is now being considered for use with expendable rockets for launching satellites. The ejection system was designed to launch a 150 lb satellite at an initial ejection velocity of 32 ft/sec with a spin rate of 30 rev/min. The ejection system consists of a pneumatic cylinder, satellite retaining mechanism, and bearing assembly to allow the satellite to rotate during the spin up phase. As the cylinder is pressurized rapidly causing movement of the actuation piston, the mechanism automatically releases the spinning satellite by retracting a pneumatic locking pin and three spring loaded holddown pins. When the piston reaches the end of its stroke, it encounters a crushable aluminum honeycomb shock absorber which decelerates the piston and retaining mechanism. The assembly is designed for multiple uses except for the crushable shock absorber and pyrotechnic valves. The advantage of the design is discussed and patent no. and date given.

Moore, Michael B.↗

Preload Loss in a Spacecraft Fastener via Vibration-Induced Unwinding

Sound engineering practice requires that fasteners and bolted joints maintain preload in service. NASA recently concluded a series of vibration tests of a multicomponent structure intended to simulate an upper stage section of a launch vehicle. The stacked components were joined through six circumferentially placed bolted cup-cone-style pyrotechnic joint mechanisms designed to share spacecraft structural loads and then enable separation during ascent. Over the course of the vibration test campaign, all six bolted cup-cone mechanisms experienced some degree of preload loss with two mechanisms losing half of their original bolt preload. A subsequent forensic anomaly investigation concluded that vibration-induced unwinding of the preload nut-and-bolt assemblies occurred despite the use of safety wire and high levels of thread friction. A series of experiments were done to better understand how large, heavily preloaded fasteners could unwind. Additionally, thread friction torque was measured and the fastener locking capability of safety wire was evaluated. The friction coefficient between the clamped cup-cone components was characterized and finally a highly instrumented mechanism-level vibration test was done to reproduce the unwinding phenomenon to better understand the mechanism's behavior. The conclusion drawn was that vibration and structural forces led to relative motion (sliding) of the clamped components, resulting in self-loosening and unwinding effects on the nut-and-bolt assembly. To counter this phenomenon, more effective fastener locking methodologies were recommended and a follow-on effort was initiated to quantify the relationship between preload, component motion, and resulting unwinding forces. It is hoped that elucidation of these effects can be used to design more effective fastener locking features.

fasteners↗

Heliophysics Environmental & Radiation Measurement Experiment Suite (HERMES): A Small External Payload for the Lunar Gateway with Big Challenges

Currently scheduled for liftoff in 2024, Gateway will be an outpost orbiting the moon for astronauts headed to and from the lunar surface and serve as a staging point for deep space exploration. In January of 2020 NASA headquarters contacted Goddard Space Flight Center to request that they develop a Heliophysics instrumentation package for Gateway. This package would later become known as HERMES-Heliophysics Environmental & Radiation Measurement Experiment Suite. HERMES consists of a Miniaturized Electron pRoton Telescope (MERIT), an Electron Electrostatic Analyzer (EEA), Solar Probe Analyzers (SPAN)-A-ions, and Noise Eliminating Magnetometer Instrument in a Small Integrated System (NEMISIS), which consists of one fluxgate and two Magneto-Inductive Magnetometers. From the beginning the HERMES mission faced a number of Challenges. It was constrained to fit in a small, half meter, cube and it was required to weigh no more than 25kg. A new boom design for the magnetometer would be required and for safety reasons it must be able to retract autonomously with power removed. To complicate matters the location of the SORI-Small ORU- (Orbital Replacement Unit) Robotics Interface, the primary interface for the HERMES platform to the Gateway elements, was undetermined. Also, the mechanical, thermal and electrical interfaces are not fully defined. The Canadian Space Agency is still in process of designing the version of the SORI that will be flown on the Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO) elements, each of which are being developed by different contractors. At the time of initiating the HERMES project, neither of the Gateway module providers were under contract. Additionally, we would later learn the ISS heritage SORI modules were not originally designed for launching on the Gateway elements with a payload directly attached but rather were intended to be brought up on a separate carrier outfitted with launch locks and specialized launch structures from which the robotic arm on Gateway would then be used to detach the payload and install it on the SORI adapters while on orbit. Launching the integrated Payload/SORI on the PPE and HALO elements complicates the stiffness requirements and coupled loads analysis. Adding to this are serious constraints on Field-Of-View (FOV) for solar viewing and severe radiation exposure considerations brought on by slowly raising the orbit through the Van Allen Belts. Just to make things a little more challenging the budget for the entire project was intended to be a low-cost tailored Class-D mission approach. Plus, the effects of Corona VIrus Disease 2019 (COVID-19) were not factored in from the beginning. This paper will discuss what’s being done to overcome these challenges and put HERMES on track for a 2024 Launch Readiness Date (LRD).

Irving Joseph Burt↗

Structures and Mechanisms Design Concepts for Adaptive Deployable Entry Placement Technology

System studies have shown that large deployable aerodynamic decelerators such as the Adaptive Deployable Entry and Placement Technology (ADEPT) concept can revolutionize future robotic and human exploration missions involving atmospheric entry, descent and landing by significantly reducing the maximum heating rate, total heat load, and deceleration loads experienced by the spacecraft during entry [1-3]. ADEPT and the Hypersonic Inflatable Aerodynamic Decelerator (HIAD) [4] share the approach of stowing the entry system in the shroud of the launch vehicle and deploying it to a much larger diameter prior to entry. The ADEPT concept provides a low ballistic coefficient for planetary entry by employing an umbrella-like deployable structure consisting of ribs, struts and a fabric cover that form an aerodynamic decelerator capable of undergoing hypersonic flight. The ADEPT "skin" is a 3-D woven carbon cloth that serves as a thermal protection system (TPS) and as a structural surface that transfers aerodynamic forces to the underlying ribs [5]. This paper focuses on design activities associated with integrating ADEPT components (cloth, ribs, struts and mechanisms) into a system that can function across all configurations and environments of a typical mission concept: stowed during launch, in-space deployment, entry, descent, parachute deployment and separation from the landing payload. The baseline structures and mechanisms were selected via trade studies conducted during the summer and fall of 2012. They are now being incorporated into the design of a ground test article (GTA) that will be fabricated in 2013. It will be used to evaluate retention of the stowed configuration in a launch environment, mechanism operation for release, deployment and locking, and static strength of the deployed decelerator. Of particular interest are the carbon cloth interfaces, underlying hot structure, (Advanced Carbon- Carbon ribs) and other structural components (nose cap, struts, and main body) designed to withstand the pressure and extremely high heating experienced during planetary entry.

Yount, Bryan C.↗