Search NASA⌕ Search

SEARCH · Search NASA

Results for “Line trip event detection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Real-Time Detection and Localization of Line Trip Event Via Relative Phase Angles

Line trip events widely exist in power systems. They can result in power outages and a huge economic loss if not promptly detected and localized. To provide a fast and precise solution, this paper presents a Complete Coverage of Voltage Measurement (CCVM)-based line trip event detection algorithm and a Relative Phase Angle (RPA)-based line trip event localization algorithm. First, frequency and relative phase angle features during a line trip event are calculated. Then, the CCVM-based algorithm is proposed from both frequency and rate of change of frequency estimation algorithm aspects. Additionally, the RPA-based algorithm is presented, and two cases are studied to demonstrate the uniqueness of the proposed algorithm. Various experiments are conducted, where the simulation results demonstrate that the proposed CCVM-based algorithm can detect a line trip event as short as 2.07 ms. In addition, the RPA-based algorithm has 1.26 times higher localization accuracy compared with the frequency magnitude-based and phase angle-based algorithms. In conclusion, the experiment results on the examples from two interconnected power systems in the U.S. verified the performance of the proposed algorithms in wide-area power systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Disturbance Event Detection Based on Synchrophasors and Deep Learning

Power system frequency disturbances are caused by various generation and transmission events including generator trips, load disconnections, line trips, etc. Accurate detections of the events are crucial to bulk power system situation awareness and event investigation. This paper utilizes the recent advances of deep learning to build a convolutional neural network model to detect events in an accurate yet straightforward manner. Herein, the rate of change of frequency and the relative angle shift are converted to images as the inputs of the proposed model. Finally, this paper uses two convolutional neural networks and classifier fusion to achieve the detection result. Compared with the conventional event detection algorithm and the frequency only deep learning model, the proposed model improves the detection accuracy by over 48%. As a promising tool for bulk power system situation awareness, the proposed model requires a short decision time, which is suitable for practical scenarios.

42 ENGINEERING↗

Large Angle Deviation in Grid-Following IBRs Upon Grid Voltage Dip

In the 2021 Texas Odessa large-scale solar PV tripping events, phase-locked-loop (PLL) loss of synchronism is identified as a major cause of solar PV tripping. When solar PVs detected a large phase angle deviation (e.g., 10 degrees), tripping commands were initiated. Here, the large phase angle deviation was triggered by a transmission line fault 200 miles away, which in turn led to approximately 30% voltage drop in the 345-kV system. This paper offers a plausible reason why grid-following inverter-based resources (IBRs) may experience a large angle deviation upon grid voltage dip. Critical operating conditions contributing to such phenomena are identified via analysis and their effects are demonstrated using electromagnetic transient (EMT) simulation. Furthermore, the effect of converter control, e.g., grid-following control vs. grid-forming control, is examined. It is found from EMT simulation results that frequency and voltage control are helpful in mitigating angle deviation. Furthermore, linear block diagrams are derived to examine why frequency control can effectively suppress large angle deviation.

14 SOLAR ENERGY↗

Digital Grid Twin–Direct Communication Scheme Test Bed for Assessing Relay-to-Relay Radio Antenna and Optical Fiber Performance and Misoperations

This study introduces a novel “Digital Grid Twin–Direct Communication Scheme” test bed. This advanced platform evaluates point-to-point communication between transmitter and receiver relays with optical fiber and radio omnidirectional antenna systems, implemented at the Advanced Protection lab in the Grid Research Innovation and Development Center at Oak Ridge National Laboratory. The increased diversity of energy sources has led to more protective relay misoperations. In North America, microgrid protection schemes now use point-to-point communication along distribution lines between relays to implement advanced logic in nonradial grids that include both high- and low-inertia generators. This trend challenges utilities to minimize misoperations while ensuring rapid fault clearance and accurate selectivity coordination between primary and backup relays. This study assesses relay-to-relay communication schemes by introducing an advanced testing platform based on a digital grid twin protection test bed using a synchronized time source system. The platform evaluates the communication system using radio antennas or optical fiber links by integrating protective relays that operate breakers within the digital twin and record relay events and communication signals. In the experiments, transmitter and receiver relays were configured with inverse time overcurrent and breaker trip detection logic to assess the total time of the communication protection schemes based on the sum of the relay protection element operating time, radio latency, propagation delay, baud rate delay, and relay processing time. These delays were derived from recorded relay events and communication signals from the interface of a real-time simulator set as a digital grid twin. The test bed successfully simulated various electrical faults along a distribution line while ensuring effective and reliable point-to-point communication between transmitter and receiver relays. The radio antenna communication system exhibited latency because of the radio. This latency depends on the baud rate setting and type of radio application; in general, the higher the baud rate, the lower the radio latency. The measured radio latency (for Mirrored Bits with an encryption card at 9,600 bps) was about 9–10 ms. Additionally, calculated propagation delay per mile for radio antennas and optical fiber was 5.36 µs/mi and 8.04 µs/mi, respectively. Optical fiber communication did not demonstrate radio latency. Instead, the protection element operating time depends mainly on the protection logic function set in the relay, and the relay processing time depends on the processing rate of the relay in samples per power system cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Combinatorial Evaluation of Physical Feature Engineering, Classical Machine Learning, and Deep Learning Models for Synchrophasor Data at Scale

A major objective of the project was to train and evaluate the effectiveness of multiple event and anomaly detection, identification and classification deep temporal learning models for processing of real-time phasor measurement unit (PMU) data streams. A vast dataset, consisting of two years of phasor measurements from all three U.S. Interconnections, was curated and released by the Department of Energy (DOE) through Pacific Northwest National Laboratory (PNNL). The dataset also included an event log that provided event times and types (e.g. generator trips, line trips, planned service events, transformer operations, etc.). Our analysis of this dataset addressed six (6) of the eleven (11) research priorities identified in Funding Opportunity Announcement (FOA) DE-FOA-0001861 “Big Data Analysis of Synchrophasor Data” (FOA 1861). Rather than being limited to pre-determined specific algorithms, this project relied on the uniquely structured, highly performant underlying time series database capabilities of the PredictiveGrid platform to assess the vast dataset utilizing a wide variety of algorithms.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity for Distance Relay Protection

This project is a DOE follow-up effort on the CREDC workshop held on September 13, 2018 in Cambridge, MA to discuss cybersecurity of distance relays, which considered the benefits, vulnerabilities and risk mitigations for the use of communication systems in power system protection. The objectives of this project are to define the taxonomy of relay protection and associated communications; define use cases describing approaches to reduce the cyber-attack surface on those protective relays; and evaluate the loss of operational functional capability from changes to communication coverage. Mitigating controls will also be evaluated to understand if there are other approaches to reduce attack surfaces while maintaining communications or partial communications. Distance relays are used to protect transmission lines of approximately 10 to 300 miles in length, by detecting short circuits (i.e., faults) on the lines and then tripping circuit breakers in the substation. Such protection systems are a subset of the power system and they incorporate sensing, logic and communication functions. Protection system exposure to cyberattack could be drastically limited by disconnecting relays from all vulnerable communication systems, but this may adversely impact overall power system performance in the absence of cyberattack. This project began with a use case analysis of protection systems with communications, as summarized in this report. It continued with modeling, testing and evaluation in a miniature power system (MPS), located in the Western Area Power Administration (WAPA) Electric Power Training Center (EPTC). The project also incorporated feedback from two industry meetings held in February and September 2019. The suggested next steps account for and complement the work already underway with DOE/CESER funding: 1. Study the performance of LCD and PC vs. PUTT, which is less reliant on communication system performance and GPS timing references. The PUTT scheme could prove to be more resilient to cyberattack or communications-related disruption. It could also be more tolerant of message re-routing with SDN/SDR communication systems. On the other hand, it will be more vulnerable to false tripping during dynamic events or to loss of the voltage signal. The optimum choice of scheme may depend on the specific power system and risk assessment. This study could provide a new template for evaluation based on business functions. 2. Research and develop new methods to detect and monitor distributed physical attacks, possibly using drones, video sensors, thermal sensors, machine learning and other advanced techniques. This will help mitigate the impact of cyberattack on the protection system, and will also help mitigate the impact of wild fires. 3. Implement a scalable PKI for use in electric utility protection systems. This will encourage widespread adoption of secure authentication methods that are already available, but not widely used at present. This will help secure engineering access to the relays. 4. Investigate the use of SDN in combination with SDR to achieve better cybersecurity and electromagnetic security of the network, incorporating path variability. This would help secure both engineering access and peer-to-peer GOOSE messaging. 5. Perform additional testing, with operator evaluation of “red button” scenarios, PUTT vs. LCD, relay mis-operations, and other cyberattacks in the EPTC. This is an important advantage of testing in the EPTC rather than by computer simulation or even hardware-in-the-loop simulation; the EPTC is already dedicated to managing the situational awareness, operator response times and other human impacts. One of the project objectives was to settle on a common nomenclature for this problem space. We have concluded that the OSI layer model, supplemented by ANSI device numbers and other IEEE standards, is already well-accepted by the industry. The IEEE PSRC knowledge base provides a great deal of public information

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Spread Spectrum Time Domain Reflectivity for String Monitoring in PV Power Plants (Final Technical Report)

This final report describes the methods and results of applying Spread Spectrum Time Domain Reflectivity (SSTDR) for String Monitoring in PV Power Plants for DE-EE0008169. The project created a new system for both detecting and locating electrical faults in photovoltaic systems. In this work, we address photovoltaic electric faults that are both common and costly. Based on interviews with photovoltaic power plant owners, operators, and maintainers, three types of faults are common and of significant interest: disconnects, ground faults, and arc faults. Disconnects can originate from many sources. They are often due to everyday events, such as lawnmowing (accidentally running over a cable), animals eating through the cables, or degradation that occurs over time due to corrosion or general degradation. Ground faults occur when the cables (for example, due to frayed insolation) connect to the ground, relaying current into the ground. These faults are particularly problematic since the ground faults are often intermittent. That is, ground faults commonly appear during rain storms due to a change in soil conductivity and then disappear when the rain ends. This makes the ground fault difficult to find because while current systems can detect the overall change in voltage and current associated with a ground fault, technicians are necessary to locate the fault. As a result, ground faults may disappear before the technician arrives at the power plant. Hence, locating and fixing ground faults often require multiple trips. We also study arc faults, which can result when nearby conductors create an arc of electrical current through the air. While less common, arc faults can be extremely dangerous. The energetic electrical arc can cause fires and destroy equipment, costing significant damage. Overall all three types of faults cost owners and operators money, either from the destruction of equipment or from technician time. Furthermore, while devices exist for detecting ground faults (ground fault circuit interrupters) and arc faults (arc fault circuit interrupter), these systems only search patterns of electrical current that correspond to each fault. This information cannot be used to locate the fault. In addition, these protection systems experience nuisance trips due to nearby electromagnetic interference, such as from a lawn mower or other motors that produce significant amounts of electromagnetic radiation. Hence, the overall goal of this project is to create an SSTDR tool that provides photovoltaic power plants with more reliable fault detection in addition to the localization of faults. SSTDR works by transmitting electrical signals into the photovoltaic string. Those signals reflect from impedance discontinuities (i.e., disconnects, ground faults, and arc faults). These faults are then detected by measuring the presence of a reflection at the SSTDR and can be located by identifying the location of that reflection in time. In addition, unlike current protection systems, these systems do not experience nuisance trips since their low amplitude, high frequency, and coded signal can by analyzed without interference from the regular operational voltage on the photovoltaic string.

14 SOLAR ENERGY↗