Search NASA⌕ Search

SEARCH · Search NASA

Results for “M&V”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Status and Promise of Advanced M&V: An Overview of “M&V 2.0” Methods, Tools, and Applications

Advanced measurement and verification (M&V) of energy efficiency savings, often referred to as M&V 2.0 or advanced M&V, is currently an object of much industry attention. Thus far, however, there has been a lack of clarity about what techniques M&V 2.0 includes, how those techniques differ from traditional approaches, what the key considerations are for their use, and what value propositions M&V 2.0 presents to different stakeholders. The objective of this paper is to provide background information and frame key discussion points related to advanced M&V. The paper identifies the benefits, methods, and requirements of advanced M&V and outlines key technical issues for applying these methods. It presents an overview of the distinguishing elements of M&V 2.0 tools and of how the industry is addressing needs for tool testing, consistency, and standardization, and it identifies opportunities for collaboration. In this paper, we consider two key features of M&V 2.0: (1) automated analytics that can provide ongoing, near-real-time savings estimates, and (2) increased data granularity in terms of frequency, volume, or end-use detail. Greater data granularity for large numbers of customers, such as that derived from comprehensive implementation of advanced metering infrastructure (AMI) systems, leads to very large data volumes. This drives interest in automated processing systems. It is worth noting, however, that automated processing can provide value even when applied to less granular data, such as monthly consumption data series. Likewise, more granular data, such as interval or end-use data, delivers value with or without automated processing, provided the processing is manageable. But it is the combination of greater data detail with automated processing that offers the greatest opportunity for value. Using M&V methods that capture load shapes together with automated processing1 can determine savings in near-real time to provide stakeholders with more timely and detailed information. This information can be used to inform ongoing building operations, provide early input on energy efficiency program design, or assess the impact of efficiency by location and time of day. Stakeholders who can make use of such information include regulators, energy efficiency program administrators, program evaluators, contractors and aggregators, building owners, the investment community, and grid planners. Although each stakeholder has its own priorities and challenges related to savings measurement and verification, the potential exists for all to draw from a single set of efficiency valuation data. Such an integrated approach could provide a base consistency across stakeholder uses.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

From Theory to Practice: Lessons Learned from an Advanced M&V Commercial Pilot

Advanced measurement & verification (M&V), or M&V 2.0, is an energy data analysis method using advanced metering infrastructure (AMI) data in combination with analytics to quantify energy efficiency project savings. Advanced M&V is viewed as an enabler for underutilized behavioral, retrocommissioning, and holistic multi-measure efficiency efforts, as quantifying savings for these programs with existing methods has typically been very challenging. Despite its promise, there are still several unanswered questions about the use of advanced M&V such as: How accurately can these tools quantify energy savings? How can advanced M&V satisfy regulatory requirements for rigorous savings estimates? Where and how does advanced M&V intersect with traditional impact evaluation and the principles of ‘embedded’ evaluation, measurement & verification (EM&V)? Pilots are being pursued in various regions and program contexts to address these research questions. However, results from these pilots are rarely made public, meaning that lessons may not be widely shared and the scope of analyses varies widely. The paper presents encouraging results from a recent advanced M&V pilot and discusses key process-related aspects such as managing AMI data and refining analysis methodologies. An approach to reviewing and classifying projects based on savings characteristics and magnitude is demonstrated, as a potential risk management tool. The authors also demonstrate how advanced M&V can identify underperforming projects and non-routine events in a timely manner. The paper also outlines lessons learned from this and other recent pilot activity and barriers to be overcome in moving toward the goal of widespread adoption of holistic meter-based programs.

Crowe, Eliot↗

Bimetallic MOFs (H 3 O) x [Cu(MF 6 )(pyrazine) 2 ]·(4-x)H 2 O (M = V 4+ , x = 0; M = Ga 3+ , x = 1): co-existence of ordered and disordered quantum spins in the V 4+ system

We present that these title compounds are bimetallic MOFs containing [Cu(pyz) 2 ] 2+ square lattices linked by MF 6 n- octahedra. In each, only the Cu 2+ spins exhibit long-range magnetic order below 3.5 K (M = V 4+ ) and 2.6 K (M = Ga 3+ ). The V 4+ spins remain disordered down to 0.5 K.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Will the Measurement Robots Take Our Jobs? An Update on the State of Automated M&V for Energy Efficiency Programs

Trustworthy savings calculations are critical to convincing regulators of both the cost-effectiveness of energy efficiency program investments and their ability to defer supply-side capital investments. Today’s methods for measurement and verification (M&V) of energy savings constitute a significant portion of the total costs of energy efficiency programs. They also require time-consuming data acquisition. A spectrum of savings calculation approaches is used, with some relying more heavily on measured data and others relying more heavily on estimated, modeled, or stipulated data. The rising availability of “smart” meters and devices that report near-real time data, combined with new analytical approaches to quantifying savings, offers potential to conduct M&V more quickly and at lower cost, with comparable or improved accuracy. Commercial energy management and information systems (EMIS) technologies are beginning to offer M&V capabilities, and program administrators want to understand how they might assist programs in quickly and accurately measuring energy savings. This paper presents the results of recent testing of the ability to use automation to streamline some parts of M&V. Here in this paper, we detail metrics to assess the performance of these new M&V approaches, and a framework to compute the metrics. We also discuss the accuracy, cost, and time trade-offs between more traditional M&V, and these emerging streamlined methods that use high-resolution energy data and automated computational intelligence. Finally we discuss the potential evolution of M&V and early results of pilots currently underway to incorporate M&V automation into ratepayer-funded programs and professional implementation and evaluation practice.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

Prediction of the structures and heats of formation of MO 2 , MO 3 , and M 2 O 5 for M = V, Nb, Ta, Pa

Structures for the mono-, di-, and tri-bridge isomers of M 2 O 5 as well as those for the MO 2 and MO 3 fragments for M = V, Nb, Ta, and Pa were optimized at the density functional theory (DFT) level. Single point CCSD(T) calculations extrapolated to the complete basis set (CBS) limit at the DFT geometries were used to predict the energetics. Here, the lowest energy dimer isomer was the di-bridge for M = V and Nb and the tri-bridge for M = Ta and Pa. The di-bridge isomers were predicted to be composed of MO 2 + and MO 3 - fragments, whereas the mono- and tri-bridge are two MO 2 + fragments linked by an O 2 - . The heats of formation of M 2 O 5 dimers, as well as MO 2 and MO 3 neutral and ionic species were predicted using the Feller–Peterson–Dixon (FPD) approach. The heats of formation of the MF 5 species were calculated to provide additional benchmarks. Dimerization energies to form the M 2 O 5 dimers are predicted to become more negative going down group 5 and range from -29 to -45 kcal mol -1 . The ionization energies (IEs) for VO 2 and TaO 2 are essentially the same at 8.75 eV whereas the IEs for NbO 2 and PaO 2 are 8.10 and 6.25 eV, respectively. The predicted adiabatic electron affinities (AEAs) range from 3.75 eV to 4.45 eV for the MO 3 species and vertical detachment energies from 4.21 to 4.59 eV for MO 3 - . The calculated M[double bond, length as m-dash]O bond dissociation energies increase from 143 kcal mol -1 for M = V to ~170 kcal mol -1 for M = Nb and Ta to ~200 kcal mol -1 for M = Pa. The M–O bond dissociation energies are all similar ranging from 97 to 107 kcal mol -1 . Natural bond analysis provided insights into the types of chemical bonds in terms of their ionic character. Pa 2 O 5 is predicted to behave like an actinyl species dominated by the interactions of approximately linear PaO 2 + groups.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

M&V Tool Testing Portal v1

Software is an online self-service portal for testing M&V methods/tools using buildings' interval meter data. After registering as a user in the portal, that user can download test data files, run those test data files through their own M&V software, and then upload software modeling results to the online portal as a csv file. After the user has uploaded their modeling results the portal will develop statistical accuracy metrics for that M&V tool. The online portal will summarize test results for some or all of the submitted tests. This online portal has been developed by LBNL, and we have been collaborating with the Efficiency Valuation Organization (EVO) with the objective of EVO managing the portal as an ongoing service. Portal is currently posted at http://mvportal.evo-world.org/

Cholia, Shreyas↗

Detecting the undetected: Dealing with non-routine events using advanced M&V meter-based savings approaches

In a rapidly evolving energy industry, utilities are dealing with new challenges like integrating distributed energy resources and market saturation for advanced lighting retrofits. Demand-side management programs require new approaches to meet aggressive carbon reduction goals. Advanced measurement & verification (M&V) is an energy data analysis method using smart meter data in combination with analytics to quantify energy efficiency project savings. Advanced M&V shows great promise for supporting next generation commercial programs including retro commissioning, multi-measure retrofits, and behavior change programs. Advanced M&V captures real project impacts at the meter, but sometimes non-project events can also impact consumption (so-called “non-routine events” [NREs]). Accurately detecting and accounting for NREs is important for reducing uncertainty of savings estimates and helps manage investment risk for different stakeholders (e.g., utilities, building owners, ESCOs). Recent research has shown promise in establishing data-driven techniques to identify and adjust for NREs, but fundamental questions still remain, such as: how can you distinguish NREs from acceptable noise in energy consumption profiles? What is the frequency and magnitude of NREs? Can their detection and adjustment be automated and streamlined? This paper documents the state of the art in NRE quantification and analysis. The results of research to quantify the frequency, nature and direction of NREs, and methods and metrics for determining a trigger threshold for taking action on NREs are presented. The paper also documents the latest technical guidance on application of NRE detection and adjustment methods.

Fernandes, Samuel↗

Field Evaluation of the High Efficiency Dehumidification System (HEDS) at the Timken Museum of Art - Summary of Measurement and Verification (M&V) Results from Summer 2023

The National Renewable Energy Laboratory (NREL) is performing a measurement and verification (M&V) assessment of the Conservant High Efficiency Dehumidification System (HEDS) at the Timken Museum of Art in San Diego, California. The HEDS was selected for evaluation by the U.S. Department of Energy (DOE) High Impact Technology Catalyst (HIT) evaluation program in 2022. This report documents recently completed analysis of data collected as an initial assessment of the HEDS system performance. Data was collected for the summer M&V during several weeks in August and September 2023 while operating the Timken Museum's HVAC system in several operating modes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Non-routine adjustments – towards standardizing M&V approach for quantifying the effects of static factors

The success of an energy management program relies on ensuring that the energy savings can be verified with an adequate level of certainty. Energy savings cannot be directly measured and hence have to be deduced by comparing the pre-retrofit energy consumption with post-retrofit energy consumption data adjusted to account for differences in conditions. These adjustments are needed, since conditions that influence energy consumption may not stay the same between pre- and postinstallation phase of the project. These adjustments can often be routine when accounting for factors like production volume and weather that are expected to change and are included in the energy consumption adjustment model. Existing measurement and verification (M&V) resources and guidance mostly concentrate on developing models for routine adjustment of one or more factors that normally change. On the other hand, there are factors (static) like product mix, operating hours, gross square area, etc. that are assumed to stay constant during normal conditions. However, in order to adapt to dynamic market conditions, the industries are forced to react thereby leading to changes to these static factors. Identifying these static factors that warrant adjustment, called non-routine event, along with quantifying their effect on energy consumption can be complex and lack of proper guidance can exacerbate this issue. This paper reviews some of the current work in terms of how non-routine events are defined, characterized, detected and quantified based on a review of existing M&V guidelines, protocols and other relevant literature. This work also reviewed some of the existing non-routine events and adjustment practices to understand how these different aspects are addressed along with a discussion on some of the key challenges and gaps in the current guidance.

Earni, Shankar↗

VTK-m v. 2.0

VTK-m is a toolkit of scientific visualization algorithms for emerging processor architectures. VTK-m supports the fine-grained concurrency for data analysis and visualization algorithms required to drive extreme scale computing by providing abstract models for data and execution that can be applied to a variety of algorithms across many different processor architectures.

Moreland, Kenneth [Oak Ridge National Lab. (ORNL),↗

Ninth Annual V. M. Goldschmidt Conference

This volume contains abstracts that have been accepted for presentation at the Ninth Annual V. M. Goldschmidt Conference, August 22-27, 1999, hosted by the Department of Earth and Planetary Sciences, Harvard University, Cambridge, Massachusetts. The meeting is a forum for presenting and discussing new chemical and isotopic measurements, experimental and theoretical results, and discoveries in geochemistry and cosmochemistry.

Source record↗

Understanding Charge Storage in Hydrated Layered Solids MOPO 4 (M = V, Nb) with Tunable Interlayer Chemistry

Hydrated layered solids are interesting charge storage hosts with potentially high electrochemical activity and interlayer tunability. Although it is often possible to tune their interlayer distance by a pillaring strategy, the poor electrochemical stability of such artificial structures remains a major issue in device operation. Here we investigate the charge storage properties of MOPO 4 (M = V, Nb) hydrates with a nanosheet morphology to understand the influence of the interlayer environment on cycling stability, as well as ion selectivity. While in hydrated VOPO 4 interlayer H 2 O molecules act as compressible springs to enable fast Li-/Na-ion transport kinetics and reasonable structural reversibility, NbOPO 4 layers with bridging PO 4 groups serving as permanent linkers exhibit highly stable cyclability for Li-ions, owing to a zero-volume-change ion transport process. However, the latter suffers from a much larger migration energy barrier for Na-ions. Lastly, our findings not only highlight a structurally intriguing material system, but also provide insights into reviving materials with an originally unstable interlayer chemical environment, and shed light on the design principles for creating electrochemically stable charge storage hosts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A new perspective on the initial hydrogenation of $\mathrm{TiFe_{0.9}M_{0.1}}$ ($\mathrm{M = V, Cr, Fe, Co, Ni}$) gained from surface oxide analysis and nucleation thermodynamics

Despite the promise of TiFe-based alloys as low-cost solid-state hydrogen storage materials with mild operating conditions and reasonable hydrogen capacity, their initial hydrogenation process is difficult, hindering broad utilization. The effect of alloying element on the initial hydrogenation kinetics of TiFe alloys, TiFe 0.9 M 0.1 (M = V, Cr, Fe, Co and Ni), was evaluated by analyzing changes to the passivating surface oxide layer that inhibits hydrogen permeation, as well as the ease of initial-stage hydrogen absorption into the underlying matrix. X-ray photoelectron spectroscopy and atom probe tomography revealed key variations in surface oxide compositions and thinning of the passivating oxide layer compared to pure TiFe, which suggests suppressed oxide growth by alloying-induced elemental redistribution. At the same time, density functional theory calculations predicted exothermic formation of hydride nuclei when alloying with V or Cr, as well as a reduced nucleation barrier when alloying with Co or Ni. Overall, these results are consistent with the observed experimental trend of the activation kinetics. We propose that improvements in activation kinetics of TiFe with alloying arises from the combined effect of reduced passivating oxide thickness and easier hydride nucleation, offering a starting point for alloy design strategies towards further improvement.

25 ENERGY STORAGE↗