At least 19 records

Quantifying Uncertainty of Deep Reinforcement Learning Based Decision Making for Operations and Maintenance of Nuclear Power Plant

This paper summarizes research that integrates condition monitoring and prognostics with decision making for nuclear power plant operations and maintenance. As part of this research, we have developed an online asset management tool to help reduce life-cycle maintenance and repair costs. Using the latest advancements in condition monitoring, supply chain analytics, and deep reinforcement learning, we have created a predictive maintenance tool that can optimize the maintenance and spare-part management of a repairable nuclear system. To demonstrate these methods, preliminary studies were conducted on a simple, representative maintenance system undergoing a stochastic degradation process that requires repairs or replacement to continue operation. Through Monte Carlo simulations, we were able to reduce maintenance spending by approximately 50% compared to optimized, time-based maintenance strategies. Not only does the decision maker reduce the average life-cycle costs, it also minimizes the chance of high cost scenarios, lowering the variance of the expected cost distributions, and reducing overall financial risk. Furthermore, this work also studies the ability of the decision maker to handle various levels of noise from observation uncertainty. By introducing uncertainty into the decision-making process, we have quantified the robustness and resiliency of the decision maker, as well as identified necessary levels of observability to demonstrate cost effectiveness.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multiple aspects maintenance ontology-based intelligent maintenance optimization framework for safety-critical systems

Abstract Maintenance optimization is a process for improving the efficiency of maintenance strategies and activities, considering various aspects of the target system and components, such as the probabilities of system failures and the cost of repair and replacement of a failed component. The improvement of maintenance optimization algorithms generally requires information from various data sources. For example, it may require the system risk information derived from risk analysis tools or the residual lifetime of a component from fault prognosis tools. The requirements of data acquisition (DAQ) and aggregation pose new challenges for maintenance management systems (MMSs) that implement and use these maintenance optimization algorithms. This paper proposes a multiple aspects maintenance ontology-based framework to facilitate DAQ from MMSs, online monitoring systems, fault detection and discrimination tools, risk assessment tools, decision-making tools, and component identification tools, and accelerate the implementation and verification of contemporary maintenance optimization models and algorithms. The proposed framework consists of a multi-aspect maintenance ontology with critical information for maintenance optimization and application interfaces for collecting information from various data sources, such as fault prognosis tools, online monitoring tools, risk assessment tools, and decision-making algorithms. In addition, this paper proposes a heuristic method for integrating concepts and properties from other existing ontologies into the proposed framework when the existing ontology is not fully compatible with the ontology under construction. Finally, the paper verifies the proposed ontology framework using a feedwater system designed for nuclear power plants with valves and filters as the components under maintenance.

Diao, Xiaoxu (ORCID:0000000346726352)↗

Managing Maintenance Error: Six Lessons From Aviation Maintenance

There are clear parallels between the ground processing of spacecraft and the maintenance of airline aircraft. In both cases, reliable human performance is critical to safe outcomes. Examples of human factors in airline maintenance and spacecraft ground processing illustrate the similarities between these two domains. The worldwide aviation industry began to pay close attention to human factors in maintenance after several maintenance-related disasters in the 1970s and 80s. Rather than simply applying solutions that had been developed for flight crew and air traffic controllers, the aviation industry developed human factors interventions specifically tailored for maintenance personnel. These interventions have led to safety improvements, greater reliability, and significant cost savings. Six human factors approaches from airline maintenance that can be usefully applied to enhance the quality and safety of ground processing are outlined. These are 1) Design for assembly, test, and maintenance, 2) Non technical skills training, 3) Improved design of documentation, 4) Reduction of iatrogenic quality lapses, 5) Barrier and control analysis, and 6) Continuous improvement based on learning from quality lapses.

maintenance human factors↗

An Operations and Maintenance Roadmap for U.S. Offshore Wind: Enabling a Cost-Effective and Sustainable U.S. Offshore Wind Energy Industry Through Innovative Operations and Maintenance

The United States is currently targeting 30GW of offshore wind to be installed by 2030, and 150GW by 2050. Even considering future turbine sizes, this represents thousands of new turbines installed in a diverse set of environments, each with their unique design, installation, and maintenance challenges. While much can be learned from European and Asian experience with offshore wind over the past two decades, it is important to understand the unique circumstances of the U.S. This document explores operations and maintenance of offshore wind energy, specific to the U.S. and attempts to lay out a roadmap for needed activities to ensure reliability of future installations. The roadmap was informed through dozens of interviews with a wide cross-section of the industry, including representatives from OEMs, owner/operators, service companies, certification agencies, service providers, and researchers. The roadmap first describes the problem by component - blades, drivetrain and nacelle, structures and foundations, and electrical systems - through a look at current practices and opportunities for improvement in the areas of Failure Mode Analysis and Mitigation; Monitoring, Sensing, and Inspection; and Maintenance Execution. Crosscutting areas of Digitalization, Robotics and Automation, Prognostics and Health Management and O&M Optimization, Experimentation and Demonstration, Standardization, and Design Optimization Considering Reliability and O&M are then discussed. Finally, the roadmap summarizes all of these topics with recommendations for short (1-3 years), medium (4-7 years), and long term (8-12 years) activities, with a description of needed public and private sector contributions.

17 WIND ENERGY↗

Attitude Determination and Control System (ADCS) and Maintenance and Diagnostic System (MDS): A maintenance and diagnostic system for Space Station Freedom

The Maintenance and Diagnostic System (MDS) that is being developed at Honeywell to enhance the Fault Detection Isolation and Recovery system (FDIR) for the Attitude Determination and Control System on Space Station Freedom is described. The MDS demonstrates ways that AI-based techniques can be used to improve the maintainability and safety of the Station by helping to resolve fault anomalies that cannot be fully determined by built-in-test, by providing predictive maintenance capabilities, and by providing expert maintenance assistance. The MDS will address the problems associated with reasoning about dynamic, continuous information versus only about static data, the concerns of porting software based on AI techniques to embedded targets, and the difficulties associated with real-time response. An initial prototype was built of the MDS. The prototype executes on Sun and IBM PS/2 hardware and is implemented in the Common Lisp; further work will evaluate its functionality and develop mechanisms to port the code to Ada.

Toms, David↗

IMIS: Integrated Maintenance Information System. A maintenance information delivery concept

The Integrated Maintenance Information System (IMIS) will optimize the use of available manpower, enhance technical performance, improve training, and reduce the support equipment and documentation needed for deployment. It will serve as the technician's single, integrated source of all the technical information required to perform modern aircraft maintenance.

Vonholle, Joseph C.↗

Primary Mirror Figure Maintenance of the Hobby-Eberly Telescope using the Segment Alignment Maintenance System

The Segment Alignment Maintenance System (SAMs) was installed on McDonald Observatory's Hobby-Eberly Telescope (HET) in August 2001. The SAMs became fully operational in October 2001. The SAMs uses a system of 480 inductive edge sensors to correct misalignments of the HET's 91 primary mirror segments when the segments are perturbed from their aligned reference positions. A special observer estimated and corrects for the global radius of curvature (GroC) mode, a mode unobservable by the edge sensors. The SAMs edge sensor system and (GroC) estimator are able to maintain HET's primary figure for much longer durations than previously had been observed. Telescope image quality has improved, and the amount of overhead time required from primary mirror alignment has been reduced. This paper gives a functional description of the SAMs control system and presents performance verification data. This paper also describes how the SAMs has improved the operational efficiency of the HET.

Rakoczy, John↗

A NASA Perspective on Maintenance Activities and Maintenance Crews

Proactive consideration of ground crew factors enhances the designs of space vehicles and vehicle safety by: (1) Reducing the risk of undetected ground crew errors and collateral damage that compromise vehicle reliability and flight safety (2) Ensuring compatibility of specific vehicle to ground system interfaces (3) Optimizing ground systems. During ground processing and launch operations, public safety, flight crew safety, ground crew safety, and the safety of high-value spacecraft are inter-related. For extended Exploration missions, surface crews perform functions that merge traditional flight and ground operations.

Barth Tim↗

Facilities maintenance handbook

This handbook is a guide for facilities maintenance managers. Its objective is to set minimum facilities maintenance standards. It also provides recommendations on how to meet the standards to ensure that NASA maintains its facilities in a manner that protects and preserves its investment in the facilities in a cost-effective manner while safely and efficiently performing its mission. This handbook implements NMI 8831.1, which states NASA facilities maintenance policy and assigns organizational responsibilities for the management of facilities maintenance activities on all properties under NASA jurisdiction. It is a reference for facilities maintenance managers, not a step-by-step procedural manual. Because of the differences in NASA Field Installation organizations, this handbook does not assume or recommend a typical facilities maintenance organization. Instead, it uses a systems approach to describe the functions that should be included in any facilities maintenance management system, regardless of its organizational structure. For documents referenced in the handbook, the most recent version of the documents is applicable. This handbook is divided into three parts: Part 1 specifies common definitions and facilities maintenance requirements and amplifies the policy requirements contained in NMI 8831. 1; Part 2 provides guidance on how to meet the requirements of Part 1, containing recommendations only; Part 3 contains general facilities maintenance information. One objective of this handbook is to fix commonality of facilities maintenance definitions among the Centers. This will permit the application of uniform measures of facilities conditions, of the relationship between current replacement value and maintenance resources required, and of the backlog of deferred facilities maintenance. The utilization of facilities maintenance system functions will allow the Centers to quantitatively define maintenance objectives in common terms, prepare work plans, and develop management information in order to statistically identify and analyze variances from those plans. It will also add credibility to the NASA facilities maintenance budgeting process. The key to a successful maintenance program is the understanding and support of the senior Center managers.

Source record↗

Assessment of Crew Time for Maintenance and Repair Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, understanding how crew repair and maintenance timelines are impacted by mission operations and technology changes is vital for future mission planning. Past work has been done using historical International Space Station (ISS) data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available datasets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat (SH), and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA ISS maintenance and crew time data are logged into two central databases: the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS). Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair time for each failure and repair event. The entire maintenance activity dataset is then categorized based on the class of failed component to ensure a significant sample size for each class and accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time to Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. The authors applied these modeling methods to a case study of a crewed mission to the planned SH and produced expected corrective maintenance crew time distributions. The results produced an expected corrective maintenance crew time at over 24 hours per mission, and a maintenance crew time distribution that reflects the importance of planning for sufficient maintenance requirements each mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Big Data For Operation and Maintenance Cost Reduction

The purpose of this research is to develop a first-of-a-kind framework for integrating Big Data capability into the daily activities of our current fleet of nuclear power plants. Big Data is traditionally defined as data sets with high volume, velocity, and heterogeneity, and the existing Big Data analytics capabilities are now widely popular in fields such as finance, weather, e-commerce, healthcare and sports. In the nuclear industry, while the volume and velocity of data may present computational challenges for existing analytics capabilities, data heterogeneity are seen to present the major challenge. This research project mainly focuses on incorporating the wide range of data heterogeneities in nuclear power plants into an integrated Big Data Analytics capability. The primary end-product of this project is a Big Data framework that is capable of dealing with the large volume and heterogeneity of the data found in nuclear power plants to extract timely and valuable information on equipment performance. The framework can generate system insights that are actionable relations between measurable impacts and the corresponding maintenance action plans and enable optimization of plant operation and maintenance based on the extracted information. The developed framework is capable of handling heterogeneous data including both image data and time-series sensor data. Specifically, this developed framework includes the following components. The first component is an overarching maintenance ontology which includes system insights required by maintenance optimization. The maintenance ontology interacts with other components in the developed framework. The second component handles Piping & Instrumentation Diagram (P&ID) data. It can be used to extract system components and their relations automatically from the P&IDs. This extracted information is stored in the first component, i.e., maintenance ontology, and is also used as input to the third component, i.e., a tool for generating the fault tree for the corresponding system. The generated fault tree in turn is stored in the ontology for assessing risk that is used as a criterion in maintenance policy optimization. The fourth component is a tool for inferring the parameters in the Markov degradation model for a nuclear system. It uses basic information from the ontology. The fifth component is a tool for assessing the degradation level using sensor measurement data, for example, pressure, flowrate. This tool can be used for determining corrective maintenance actions. The results obtained from components four and five are returned to the ontology. The sixth component of the framework is a tool for optimizing the maintenance policy for a nuclear system of interest. It takes certain basic information from the ontology, e.g., costs of maintenance actions and system failures, as input, and returns the optimal maintenance policy to the ontology. This tool can be used for determining predictive maintenance actions. A set of experiments have also been conducted to verify the algorithms developed in this project for nuclear system degradation monitoring. The experiments are based on four solenoid valves, similar to the ones used in nuclear power plants. The analyses based on the experimental data using two algorithms, i.e., the Randomized Window Decomposition (RWD) algorithm and the particle filtering algorithm, and the results are introduced in the report. The Big Data framework developed in this project can be used as a support tool in daily activities of plant operation and maintenance and will reduce current costs while maintaining or improving safety levels. Overall, the project will not only benefit existing reactors, however it will open new frontiers to realize the long overdue value of Big Data Analytics in the nuclear sphere.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Assessment of Crew Time for Maintenance and Repairs Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, it will be necessary to understand how crew repair and maintenance timelines are impacted by mission operations and technology changes. Past work has been done using historical ISS data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available data sets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat, and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA International Space Station (ISS) maintenance and crew time data are logged into two central databases, the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS) respectively. Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. MDC provides a detailed catalog of failure events and an overview of the failure’s required maintenance and OPTimIS provides a description of crew activities and crew time durations dedicated to maintenance. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair times for each failure event. Data is also classified by the outcome of each repair event, whether the failed component was replaced or whether it was repaired in place. The entire maintenance activity dataset is then categorized based on the class of failed component to allow for a statistically significant sample size for each class and to provide accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time To Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

The Corrective Maintenance Paradigm Shift at Hanford's Tank Farms - 20077

Hanford's Tank Farms facilities have been used to safely store waste for over 70 years, with the first single-shell tanks being constructed in 1943. Tank Farm facilities consist of 149 single-shell tanks, 28 double-shell tanks, an evaporator facility, and wastewater treatment facilities. Tank Farm facilities are aging, with a tremendous corrective maintenance burden on the Tank Farm contractor. The mission of Tank Farm facilities is soon changing from waste storage to waste staging for the Hanford Waste Treatment and Immobilization Plant (WTP). WTP operations will demand a significant increase in Tank Farm facility operations, in which corrective maintenance outage windows will shrink drastically. This realization has forced the Tank Farm contractor to consider a paradigm shift in Tank Farm facilities Maintenance planning, and the use of reliability Engineering tools. The Tank Farm Production Operations Engineering Cognizant System Engineering (CSE) organization has led the way in motivating this paradigm shift. This shift has been realized through the use of: 1) technical exchange with other Department of Energy (DOE) contractors to develop improvements in the CSE program, 2) a shift from the use of lagging to leading system health indicators, and 3) a Plant Health Committee to unite Engineering, Operations, and Maintenance personnel toward a productive maintenance strategy. The CSE organization has held several technical exchanges with other DOE contractors to discuss CSE concepts, and how to better maintain aging infrastructure. The technical exchange with other contractors has greatly reduced the time required to make improvements in the Tank Farm CSE program. Other DOE contractors have already faced issues surrounding aging infrastructure, and have vast experience in improving the reliability and usable life of structures and components in nuclear facilities. The past CSE program used lagging health indicators to determine the health of systems. The key lagging indicator used to determine system health was availability, which is the percentage of time that a facility was ready for operation compared to the time the facility was demanded for operation. Availability was a good indicator of health in the waste storage mission of Tank Farms, where safe storage was the most important function of the facility, and where maintenance outage windows were typically long-duration. In current and future operations, outage windows are reducing, resulting in the need for much more reliable systems. Systems that have had high availability may suddenly become inoperable due to a failed component or sub-system. In several instances, the use of availability as an indicator of system health failed to predict system/equipment failure before its occurrence. In discussions with other DOE contractors, a set of reliability tools, including leading indicators of health, has been implemented in the CSE program. This primarily involves the use of failure modes and effects analysis and the study of equipment failure to develop system monitoring plans that focus on trending data to detect oncoming equipment failure ahead of time. In addition, the use of a Plant Health Committee has added significantly to the paradigm shift from a corrective maintenance philosophy to the use of predictive and preventive maintenance. The Plant Health Committee is a chartered team consisting of Engineering, Operations, and Maintenance personnel. CSEs use this forum to present the results of their performance monitoring, including the presentation of health via leading health indicators. The most positive aspect of this committee is the communication that it creates within these critical organizations. The Operations and Maintenance organization benefit from focusing maintenance on the reliability-centered focus provided by Engineering. Engineering benefits from the operational experience of the Operations organization and from the failure data that can be provided by Maintenance personnel. The continued use of the Plant Health Committee is expected to further decrease maintenance outage times, in better support of oncoming 24/7 operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Space shuttle maintenance program planning document

A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

Brown, D. V.↗

Nuclear Power Fault Diagnostics and Preventative Maintenance Optimization

Operation and maintenance costs for nuclear power plants are very large. Reactors are starting to shut down even after their operating licenses have been extended, because they are not price competitive compared to other energy sources. The nuclear industry is witnessing early closure of nuclear power plants due to economic reasons despite excellent safety records. Therefore, it is imperative to reduce costs to prevent these early closures. This paper showcases recent research into advanced fault diagnostics techniques and preventative maintenance optimization to reduce these maintenance costs. This report focuses on the condensate and feedwater system for both pressurized and boiling water reactor systems. The computerized maintenance management system, which contains the plant’s digital record of all the corrective- and preventative-maintenance work orders, was used as a ground truth to locate potential faults and label the process data as healthy or faulty. Various feature extraction techniques were utilized to further differentiate the faults from the healthy data. Support vectors machines were used to categorize other test sets of process data as healthy or faulty through a cross validation procedure. Similar faults were not found within this system leading to preventative maintenance optimization. Unnecessary amounts of preventative maintenance lead to inflated maintenance costs. This paper summarizes the steps for preventative maintenance optimization from component health determination to recommendation for action. This optimization was completed for condensate pumps, condensate booster pumps, and the respective motors that drive them.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗