An MILP-Based Distributed Energy Management for Coordination of Networked Microgrids

An MILP-based distributed energy management for the coordination of networked microgrids is proposed in this paper. Multiple microgrids and the utility grid are coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) update their schedules separately. Then, the price signals are updated according to the generation–load mismatch and distributed to MCs and DMS for the next iteration. The iteration continues until the generation–load mismatch is small enough, i.e., the generation and load are balanced under agreed price signals. Through the proposed distributed energy management, various microgrids and the utility grid with different economic, resilient, emission and socio-economic objectives are coordinated with generation–load balance guaranteed and the microgrid customers’ privacy preserved. In particular, a piecewise linearization technique is employed to approximate the augmented Lagrange term in the alternating direction method of multipliers (ADMM) algorithm. Thus, the subproblems are transformed into mixed integer linear programming (MILP) problems and efficiently solved by open-source MILP solvers, which would accelerate the adoption and deployment of microgrids and promote clean energy. The proposed MILP-based distributed energy management is demonstrated through various case studies on a networked microgrids test system with three microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A modified priority list-based MILP method for solving large-scale unit commitment problems

This paper studies the typical pattern of unit commitment (UC) results in terms of generator’s cost and capacity. A method is then proposed to combine a modified priority list technique with mixed integer linear programming (MILP) for UC problem. The proposed method consists of two steps. At the first step, a portion of generators are predetermined to be online or offline within a look-ahead period (e.g., a week), based on the demand curve and generator priority order. For the generators whose on/off status is predetermined, at the second step, the corresponding binary variables are removed from the UC MILP problem over the operational planning horizon (e.g., 24 hours). With a number of binary variables removed, the resulted problem can be solved much faster using the off-the-shelf MILP solvers, based on the branch-and-bound algorithm. In the modified priority list method, scale factors are designed to adjust the tradeoff between solution speed and level of optimality. It is found that the proposed method can significantly speed up the UC problem with minor compromise in optimality by selecting appropriate scale factors.

Ke, Xinda↗

A comparative evaluation plan for the Maintenance, Inventory, and Logistics Planning (MILP) System Human-Computer Interface (HCI)

The primary goal of this project was to develop a tailored and effective approach to the design and evaluation of the human-computer interface (HCI) to the Maintenance, Inventory and Logistics Planning (MILP) System in support of the Mission Operations Directorate (MOD). An additional task that was undertaken was to assist in the review of Ground Displays for Space Station Freedom (SSF) by attending the Ground Displays Interface Group (GDIG), and commenting on the preliminary design for these displays. Based upon data gathered over the 10 week period, this project has hypothesized that the proper HCI concept for navigating through maintenance databases for large space vehicles is one based upon a spatial, direct manipulation approach. This dialogue style can be then coupled with a traditional text-based DBMS, after the user has determined the general nature and location of the information needed. This conclusion is in contrast with the currently planned HCI for MILP which uses a traditional form-fill-in dialogue style for all data access and retrieval. In order to resolve this difference in HCI and dialogue styles, it is recommended that comparative evaluation be performed which combines the use of both subjective and objective metrics to determine the optimal (performance-wise) and preferred approach for end users. The proposed plan has been outlined in the previous paragraphs and is available in its entirety in the Technical Report associated with this project. Further, it is suggested that several of the more useful features of the Maintenance Operations Management System (MOMS), especially those developed by the end-users, be incorporated into MILP to save development time and money.

Overmyer, Scott P.↗

Planning Satellite Swarm Measurements for Climate Models: Comparing Dynamic Constraint Processing and MILP Methods

We present D-SHIELD, a challenging climate science application to plan coordinated measurements (observations) for a constellation of satellites, each containing two different sensors, each with 61 pointing angle options. The L-band and P-band radar sensors collect data fed into a soil moisture model which tracks and predicts soil moisture across 1.67 million Ground Positions (GP). Soil moisture is an important predictor of wildfires, and then a predictor of floods, landslides and debris flow after a fire. Each measurement covers multiple GP due to the sensor footprint. Each GP has a "model error" which represents the uncertainty of the the soil moisture state prediction. Model error changes at different rates for each GP as the time since last observation increases and after significant events like rain. The planner's goal is to select measurements which maximize soil moisture model improvement (reduce model uncertainty). This problem is combinatorically explosive, involving many degrees of freedom for planner choices. Good domain heuristics can find solutions within a reasonable time for our application needs but cannot be proven optimal. In this paper we compare two different planning approaches to this problem: Dynamic Constraint Processing (DCP) and Mixed Integer Linear Programming (MILP). We match inputs and metrics for both DCP and MILP algorithms to enable a direct apples-to-apples comparison. We demonstrate and discuss the trades between DCP flexibility and performance vs. MILP's promise of provable optimality.

Rich Levinson↗

Modeling of thermal storage systems in MILP distributed energy resource models

Thermal energy storage (TES) and distributed generation technologies, such as combined heat and power (CHP) or photovoltaics (PV), can be used to reduce energy costs and decrease CO 2 emissions from buildings by shifting energy consumption to times with less emissions and/or lower energy prices. To determine the feasibility of investing in TES in combination with other distributed energy resources (DER), mixed integer linear programming (MILP) can be used. Such a MILP model is the well-established Distributed Energy Resources Customer Adoption Model (DER-CAM); however, it currently uses only a simplified TES model to guarantee linearity and short run-times. Loss calculations are based only on the energy contained in the storage. This paper presents a new DER-CAM TES model that allows improved tracking of losses based on ambient and storage temperatures, and compares results with the previous version. A multi-layer TES model is introduced that retains linearity and avoids creating an endogenous optimization problem. The improved model increases the accuracy of the estimated storage losses and enables use of heat pumps for low temperature storage charging. Ultimately,results indicate that the previous model overestimates the attractiveness of TES investments for cases without possibility to invest in heat pumps and underestimates it for some locations when heat pumps are allowed. Despite a variation in optimal technology selection between the two models, the objective function value stays quite stable, illustrating the complexity of optimal DER sizing problems in buildings and microgrids.

25 ENERGY STORAGE↗

Strengthened MILP formulation for certain gas turbine unit commitment problems

In this study, we derive a strengthened MILP formulation for certain gas turbine unit commitment problems, in which the ramping rates are no smaller than the minimum generation amounts. This type of gas turbines can usually start-up faster and have a larger ramping rate, as compared to the traditional coal-fired power plants. Recently, the number of this type of gas turbines increases significantly due to affordable gas prices and their scheduling flexibilities to accommodate intermittent renewable energy generation. In this study, several new families of strong valid inequalities are developed to help reduce the computational time to solve these types of problems. Meanwhile, the validity and facet-defining proofs are provided for certain inequalities. Finally, numerical experiments on a modified IEEE 118-bus system and the power system data based on recent studies verify the effectiveness of applying our formulation to model and solve this type of gas turbine unit commitment problems, including reducing the computational time to obtain an optimal solution or obtaining a much smaller optimality gap, as compared to the default CPLEX, when the time limit is reached with no optimal solutions obtained.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A MILP-Based Distribution Optimal Power Flow Model for Microgrid Operation

This paper proposes a distribution optimal power flow (D-OPF) model for the operation of microgrids. The proposed model minimizes not only the operating cost, including fuel cost, purchasing cost and demand charge, but also several performance indices, including voltage deviation, network power loss and power factor. It co-optimizes the real and reactive power form distributed generators (DGs) and batteries considering their capacity and power factor limits. The D-OPF is formulated as a mixed-integer linear programming (MILP). Numerical simulation results show the effectiveness of the proposed model.

distributed generators↗

Evaluating demand response opportunities for power systems resilience using MILP and MINLP Formulations

While peak shaving is commonly used to reduce power costs, chemical process facilities that can reduce power consumption on demand during emergencies (e.g., extreme weather events) bring additional value through improved resilience. For process facilities to effectively negotiate demand response (DR) contracts and make investment decisions regarding flexibility, they need to quantify their additional value to the grid. We present a grid–centric mixed–integer stochastic programming framework to determine the value of DR for improving grid resilience in place of capital investments that can be cost prohibitive for system operators. We formulate problems using both a linear approximation and a nonlinear alternating current power flow model. Our numerical results with both models demonstrate that DR can be used to reduce the capital investment necessary for resilience, increasing the value that chemical process facilities bring through DR. Furthermore, the linearized model often underestimates the amount of DR needed in our case studies.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

An MILP framework for optimizing demand response operation of air separation units

Renewable electricity generation and consumer demand are desynchronized in time, posing a challenge for grid operators. Industrial demand response (DR), has emerged as a strong candidate for mitigating demand variability. In this paper, we demonstrate the application of DR to an air separation unit (ASU), a chemical process that consumes significant amounts of electricity. We develop a novel optimal production scheduling framework that accounts for day-ahead electricity prices to modulate the grid load presented by the plant. Our framework accounts for the dynamics of the plant using a novel dynamic modeling framework. Further, we present a new decomposition scheme that allows us to solve the corresponding optimization problem in a matter of minutes. Extensive simulation results show significant reductions in operating costs (that benefit the plant) and reductions in peak power demand (which benefits the grid).

24 POWER TRANSMISSION AND DISTRIBUTION↗

An efficient MILP framework for integrating nonlinear process dynamics and control in optimal production scheduling calculations

The emphasis currently placed on enterprise-wide decision making and optimization has led to an increased need for methods of integrating nonlinear process dynamics and control information in scheduling calculations. The inevitable high dimensionality and nonlinearity of first-principles dynamic process models makes incorporating them in scheduling calculations challenging. In this work, we describe a general framework for deriving data-driven surrogate models of the closed-loop process dynamics. Focusing on Hammerstein–Wiener and finite step response (FSR) model forms, we show that these models can be (exactly) linearized and embedded in production scheduling calculations. The resulting scheduling problems are mixed-integer linear programs with a special structure, which we exploit in a novel and efficient solution strategy. A polymerization reactor case study is utilized to demonstrate the merits of this method. Finally, our framework compares favorably to existing approaches that embed dynamics in scheduling calculations, showing considerable reductions in computational effort.

24 POWER TRANSMISSION AND DISTRIBUTION↗

New bounding and decomposition approaches for MILP investment problems: Multi-area transmission and generation planning under policy constraints

A novel two-phase bounding and decomposition approach to compute optimal and near-optimal solutions to large-scale mixed-integer investment planning problems is proposed and it considers a large number of operating subproblems, each of which is a convex optimization. Our motivating application is the planning of power transmission and generation in which policy constraints are designed to incentivize high amounts of intermittent generation in electric power systems. The bounding phase exploits Jensen’s inequality to define a lower bound, which we extend to stochastic programs that use expected-value constraints to enforce policy objectives. The decomposition phase, in which the bounds are tightened, improves upon the standard Benders’ algorithm by accelerating the convergence of the bounds. The lower bound is tightened by using a Jensen’s inequality-based approach to introduce an auxiliary lower bound into the Benders master problem. Upper bounds for both phases are computed using a sub-sampling approach executed on a parallel computer system. Numerical results show that only the bounding phase is necessary if loose optimality gaps are acceptable. But, the decomposition phase is required to attain optimality gaps. Moreover, use of both phases performs better, in terms of convergence speed, than attempting to solve the problem using just the bounding phase or regular Benders decomposition separately.

97 MATHEMATICS AND COMPUTING↗

Toward a MILP Modeling Framework for Distribution System Restoration

Large-scale blackouts and extreme weather events in recent decades raise the concern for improving the resilience of electric power infrastructures. Distribution service restoration (DSR), a fundamental application in outage management systems, allows restoration solutions for system operators when power outages happen. As distribution generators (DGs) and remotely controllable devices are increasingly installed in distribution systems, an advanced DSR framework is critical to perform optimally coordinated restoration that can achieve maximal restoration performance. This work introduces a DSR modeling framework, which can generate optimal switching sequences and estimated time of restoration in the presence of remotely controllable switches, manually operated switches, and dispatchable DGs. Two mathematical models, a variable time step model and a fixed time step model, are presented and compared. The proposed models are formulated as a mixed-integer linear programming model, and their effectiveness is evaluated via the IEEE 123 node test feeder.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PDPTW-DB: MILP-Based Offline Route Planning for PDPTW with Driver Breaks

The Pickup and Delivery Problem with Time Windows (PDPTW) involves optimizing routes for vehicles to meet pickup and delivery requests within specific time constraints, a challenge commonly faced in logistics and transportation. Microtransit, a flexible and demand-responsive service using smaller vehicles within defined zones, can be effectively modeled as a PDPTW. Yet, the need for driver breaks—a key human constraint—is frequently overlooked in PDPTW solutions, despite being necessary for regulatory compliance. This study presents a novel mixed-integer linear programming formulation for the Pickup and Delivery Problem with Time Windows and Driver Breaks (PDPTW-DB). To the best of our knowledge this formulation is the first to consider mandatory periodic driver breaks within optimized Microtransit routes. The proposed model incorporates regulatory compliant break scheduling directly within the vehicle routing optimization framework. By considering driver break requirements as an integral component of the optimization process, rather than as a post-processing step, the model enables the generation of routes that respect hours of service regulations while minimizing operational costs. This integrated approach facilitates the generation of schedules that are operationally efficient and prioritize driver welfare through driver breaks. We work with a public transit agency from the southern USA, and highlight the specific nuances of driver break optimization, and present a Pickup and Delivery Problem with Time Windows formulation for optimizing Microtransit operations and scheduling driver breaks. We validate our approach using real-world data from the transit agency. Our results validate our formulation in producing cost-effective, and regulation-compliant solutions.

Applied Computing, Transportation↗