Search NASA⌕ Search

SEARCH · Search NASA

Results for “MINING LAWS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Retrieval project Asse II - Lessons Learned in Radiological Protection - 18263

From 1967 to 1978 in total 125,787 drums and packages with low- and intermediate level waste were emplaced in the Asse II mine. The disposal operation ended in 1978 due to a revision of the Atomic Energy Act. For the disposal of radioactive waste, a plan approval procedure would have been mandatory due to the Atomic Energy Act, but the mining law was the legal basis for operating the Asse II mine, further on. A concept for a closure of the mine was not existing at that time. On January 1, 2009, the Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz BfS) became the new license-holder and operator of the Asse II mine under the Atomic Energy Act. The Act on the Organizational Restructuring in the Field of Disposal in Germany became effective on July 30, 2016. The act provides that a federally owned company, the Bundesgesellschaft fuer Endlagerung (BGE mbH, Federal Company for Radioactive Waste Disposal) is formed to carry out the operative tasks of searching for a High Level Waste (HLW) repository, the construction and operation of repositories (Konrad, Morsleben) and of the Asse II mine. Since April 25, 2017 BGE is in charge of the operative tasks that have so far been carried out by BfS. Up to now, the long-term safety of the Asse II mine has not been demonstrated in the case that all the waste will remain inside the mine. Further problems arise from a lack of host rock stability, the incomplete backfilling of the mining areas that have not been used for the emplacement of radioactive waste, and a continuous brine inflow into the mine of approx.12 m{sup 3} per day. For these reasons, according to chap. 57b of the Atomic Energy Act, the Asse II mine is to be closed without delay after retrieving the emplaced nuclear waste. Besides the recent organizational changes in Germany and the special problems giving rise to retrieve the waste, in this paper the operational experiences since 2009 on the way from mining law to atomic law will be described. This applies to the radiation protection regime, the release and clearance procedure, and some measures to boost efficiency. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gnome-Coach, New Mexico Site Fact Sheet

The Gnome-Coach Site is located in southern Eddy County, New Mexico, 11 miles east of the Pecos River and 25 miles southeast of the city of Carlsbad. The site is approximately 680 acres. The land is currently withdrawn from all forms of disposition under the public land laws, including U.S. mining laws and leasing under mineral leasing laws. On December 10, 1961, a 3-kiloton-yield nuclear device was detonated at a depth of 1,183 feet belowground surface in a thick, bedded salt deposit within the Salado Formation.

54 ENVIRONMENTAL SCIENCES↗

Clearance Measurements prior to the Shut-Down of ERAM

Low and intermediate level radioactive waste was emplaced in the Morsleben Repository (ERAM), a former salt mine, until 1998. Now the German Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS) has applied for the decommissioning of the plant. The ERAM's own radioactive waste requires clearance as far as it may not remain in the repository. The German Mining Law also demands all non-mining typical waste to be removed from the mine when being decommissioned and the Waste Avoidance, Recovery and Disposal Act demands waste to remain within the economy cycle if this is economically justifiable. Therefore new clearance measuring devices have to be applied using gamma and beta radiation to determine the contamination of objects and substances regarding the special nuclide spectra in the ERAM. Even if a very multifaceted radionuclide spectrum is to be expected due to the fact that the emplaced waste results from various applications such as nuclear engineering, medicine, research, and military, numerous investigations have confirmed that only a few radionuclides have to be considered. To facilitate this procedure the controlled area of the ERAM is to be classified according to different contamination categories. Assumptions about the radionuclide mixture are permanently controlled by routine measurements and the evaluation of possible contamination events. The considerations about the radionuclide mixture and the structure of the controlled area will be described in this presentation. Furthermore a new methodology to measure Sr-90 is discussed which uses the Cerenkov effect and the low level of background gamma radiation in the salt mine. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Temporal Approach to Monitor Surface Mine Reclamation Progress via LANDSAT

Using LANDSAT satellite imagery, the mine reclamation process can be studied on a temporal and continuing basis. Not only can the progress of reclamation be readily monitored, but also a breakdown in the mining reclamation process can be detected. In viewing reclamation, it is important to monitor the mined site well past initial revegation stages. With present mining law and bonding procedures, fast revegetational growth is encouraged, often leading to poor soil fertilizing and inappropriate stabilizing species. As a result, the initial reclamation may exhibit good qualities for one or two years but then may experience vegetational deterioration after the state has relinquished the mining company from it's responsibility. It is this small-scale breakdown in the reclamation process that was detected using an unsupervised classification technique with eight-year temporal LANDSAT imagery coverage.

Davis, A. L.↗

Central Nevada Test Area, Nevada Fact Sheet

The Central Nevada Test Area (CNTA) is in the Hot Creek Valley of south-central Nevada, approximately 70 miles northeast of Tonopah. The CNTA consists of three parcels totaling 2,560 acres. The parcels are spaced approximately 3 miles apart along a roughly north-south line. The total acreage is currently withdrawn from all forms of appropriation associated with mining laws and leasing. The U.S. Atomic Energy Commission, a predecessor agency of the U.S. Department of Energy (DOE), acquired the CNTA in the early 1960s to develop alternative sites to the Nevada National Security Site (formerly known as the Nevada Test Site) for underground nuclear testing. Three emplacement boreholes (UC-1, UC-3, and UC-4) were drilled on the three parcels at the CNTA for underground nuclear testing. The initial underground nuclear test at CNTA, Faultless, was conducted in borehole UC-1 at a depth of 3,199 feet below ground surface on January 19, 1968. The yield of the Faultless test was estimated to be 0.2 to 1 megaton. Its purpose was to evaluate the environmental and structural effects that might be expected if subsequent, higher-yield underground nuclear tests were conducted in this vicinity. The test resulted in a down-dropped fault block visible at land surface. In addition, seismic results supported the indication that the site was not favorable for larger detonations. The nuclear detonation created a cavity with a radius of approximately 328 feet. The Faultless test did not release any radioactivity at the surface, and no additional tests were conducted at the CNTA.

54 ENVIRONMENTAL SCIENCES↗

The Challenges of Repository Operation in an Existing Mine - 19339

A generally accepted principle related to long term management of radioactive waste/ spent fuel is the isolation in a geological repository. In Germany, the disposal operation of low-level waste (LLW) and intermediate-level waste (ILW) started in the Asse II mine in 1967 and in the former German Democratic Republic in the Morsleben repository in 1971. After the German reunification, the responsibility for the existing sites changed several times until the Bundesgesellschaft fuer Endlagerung (BGE) became new license holder for both sites in 2017. The BGE is responsible to carry out the operative tasks of searching for a high-level waste (HLW) repository, the planning and construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository. Nevertheless, the challenges of repository operation in an existing mine have not changed in all these years, as the regulatory framework is mainly written for Nuclear Power Plants (NPPs) and is difficult to adapt for a repository mine. In particular, conditions in a mine are substantially different from 'clean' above-ground nuclear installations. Dust due to mining activities, relatively high temperatures, and a corrosive atmosphere in a salt mine might be present. Therefore, the usability of the repository for several decades during the different operational phases, i.e. planning, construction, emplacement, and closure, can only be ensured by continuous maintenance. Furthermore, the atomic law is applicable for above-ground facilities and the mining law for mines of every description. The difficulty of geological repositories is to ensure that both laws are going to be applied above and below ground with no regulatory framework tailored especially for such sites. A special case is the Asse II mine where the mining law was applied from the very beginning, before the atomic law needed to be established later on and now requires the retrieval of the radioactive waste before decommissioning. In this presentation, similarities and differences in the legal framework of the repositories in the responsibility of BGE and some operational experiences throughout the years are described. This applies to the radiation protection regime, the excavation ratio, the host rock stability and the backfilling concepts of the mining areas. Further challenges arise from the demonstration of long term safety according to the state-of-the-art of science and technology for either existing repositories/ mines or those under construction or planned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hopping Robot with Wheels

A small prototype mobile robot is capable of (1) hopping to move rapidly or avoid obstacles and then (2) moving relatively slowly and precisely on the ground by use of wheels in the manner of previously reported exploratory robots of the "rover" type. This robot is a descendant of a more primitive hopping robot described in "Minimally Actuated Hopping Robot" (NPO- 20911), NASA Tech Briefs, Vol. 26, No. 11 (November 2002), page 50. There are many potential applications for robots with hopping and wheeled-locomotion (roving) capabilities in diverse fields of endeavor, including agriculture, search-and-rescue operations, general military operations, removal or safe detonation of land mines, inspection, law enforcement, and scientific exploration on Earth and remote planets. The combination of hopping and roving enables this robot to move rapidly over very rugged terrain, to overcome obstacles several times its height, and then to position itself precisely next to a desired target. Before a long hop, the robot aims itself in the desired hopping azimuth and at a desired takeoff angle above horizontal. The robot approaches the target through a series of hops and short driving operations utilizing the steering wheels for precise positioning.

Barlow, Edward↗

Indonesian coal mining

The article examines the opportunities and challenges facing the Indonesian coal mining industry and how the coal producers, government and wider Indonesian society are working to overcome them. 2 figs., 1 tab.

01 COAL, LIGNITE, AND PEAT↗

Policy Reforms to Unleash Domestic Critical Minerals Mining and Processing

The United States faces growing strategic and economic risks due to its limited ability to mine, process, and refine the minerals required for national defense, energy systems, advanced manufacturing, and emerging technologies. Although the country possesses significant geological resources, development has been slowed by long and unpredictable permitting timelines, fragmented regulatory responsibilities, limited midstream processing capacity, and a shrinking technical workforce. These structural barriers have created supply chain vulnerabilities that constrain industrial growth and reduce national resilience. This report presents a comprehensive set of reforms intended to modernize the nation’s approach to critical minerals. The recommendations address federal permitting, environmental review processes, the legal framework governing mining activities, interagency coordination, domestic processing and refining capacity, and the education and workforce systems needed to support long term industry development. The analysis emphasizes practical steps to shorten project timelines, improve regulatory clarity, expand processing infrastructure, enable recovery from both conventional and nontraditional sources, and update outdated requirements that hinder the development of essential materials. Taken together, the recommended reforms would strengthen domestic supply chains, improve investment certainty, and reduce dependence on external minerals and processing infrastructure. By aligning policy, regulatory frameworks, and workforce capabilities with national needs, the United States can build a more resilient and secure critical minerals ecosystem that supports long term economic competitiveness and technological leadership.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Improving mine safety technology and training in the U.S. recommendations of the Mine Safety Technology and Training Commission

The key issues studied focused on underground coal mining and included (1) prevention of explosions in sealed areas, (2) better emergency preparedness and response, (3) improvement of miners' ability to escape, (4) better protection of miners before and after a fire or explosion, (5) improved provision of oxygen, and (6) development and implementation of more robust post-incident communication. The U.S. Congress passed the Mine Improvement and New Emergency Response Act of 2006, which mandated new laws to address the issues. Concurrent with investigations and congressional deliberations, the National Mining Association formed the independent Mine Safety Technology and Training Commission to study the state-of-the-art relative to technology and training that could address the vulnerabilities exposed by the mine disasters. As discussed, the report outlined persistent vulnerabilities linked with significant hazards in underground coal mines, and made recommendations to provide a path for addressing them. Overall the commission report made 75 recommendations in the areas of risk-based design and management, communications technology, emergency response and mine rescue procedures, training for preparedness, and escape and protection strategies. In its deliberations, the commission importantly noted that mine safety in the U.S. needs to follow a new paradigm for ensuring mine safety and developing a culture of prevention that supports safe production at the business core. In the commission's viewpoint, the bottom line in protecting coal miners is not only adopting a culture of prevention but also systematically pursuing mitigation of significant risks. 4 refs., 2 figs.

01 COAL, LIGNITE, AND PEAT↗

Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming – 16614

By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM’s primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE “full administrative jurisdiction” and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites’ radiological safety and long-term public and environmental protection. This “shared-jurisdiction approach” will meet LM’s strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to “manage and conserve the lands under the mandate of multiple-use and sustained yield.” In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets.

54 ENVIRONMENTAL SCIENCES↗

Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614

By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17 sites remediated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) to the current inventory of 90 sites that it manages. Among the new sites are ones where federal public lands occur within the proposed long-term care boundary, the boundary determined by the Nuclear Regulatory Commission and LM as necessary to maintain site protectiveness for the entombed uranium mill tailings and residual groundwater contamination. For these sites, public land withdrawals for land and minerals will need to be established. LM's primary mission at UMTRCA sites is to protect the public and the environment from exposure to contamination at the sites. For the sites with public lands or federally controlled minerals that will be transferring to LM, the Office will apply to the Department of the Interior (DOI) Bureau of Land Management (BLM) for new, public land and mineral withdrawals. At most current LM UMTRCA sites that involved public lands and minerals, DOI granted DOE 'full administrative jurisdiction' and permanent withdrawals. Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing laws and regulations. LM is coordinating with DOI/BLM in Wyoming to permanently withdraw full and partial jurisdiction at future UMTRCA Title II sites in that state. This approach would allow LM to fully administer surface lands and minerals, where necessary, and DOI and LM to administer surface lands and leasable minerals where it would not jeopardize sites' radiological safety and long-term public and environmental protection. This 'shared-jurisdiction approach' will meet LM's strategic goal of protecting human health and the environment but also allow BLM to fulfill their mission to 'manage and conserve the lands under the mandate of multiple-use and sustained yield'. In addition, LM could also fulfill the fourth goal of its Strategic Plan, to optimize land use and assets. The portions of the sites where LM will ask for full jurisdiction are those that contain the disposal cell and any adjacent lands and minerals required to maintain and protect it. It is anticipated that the shared jurisdiction portion of the withdrawal would largely coincide with land where known or projected contaminated groundwater from the past ore processing exists or will migrate over time. Examples of BLM-authorized activities on the shared jurisdiction portions of the withdrawals may include livestock grazing, wildlife habitat improvement projects, recreation, and rights of ways for roads, pipelines, utilities, and communication sites. In addition, BLM could authorize subsurface uses such as oil and gas, coal, or geothermal development or groundwater pumping from deeper aquifers if the proposal would not disturb groundwater contamination. For areas of the withdrawal where the agencies will share jurisdictional authority, DOE LM and BLM will develop an interagency agreement (IA) to define acceptable uses and associated roles and responsibilities. To ensure maximum protection of human health and the environment, each site's IA will include a provision allowing DOE LM the right of first refusal against any action it believes might affect radiological safety at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote sensing in Michigan for land resource management

The Environmental Research Institute of Michigan is conducting a program whose goal is the large-scale adoption, by both public agencies and private interests in Michigan, of NASA earth-resource survey technology as an important aid in the solution of current problems in resource management and environmental protection. During the period from June 1975 to June 1976, remote sensing techniques to aid Michigan government agencies were used to achieve the following major results: (1) supply justification for public acquisition of land to establish the St. John's Marshland Recreation Area; (2) recommend economical and effective methods for performing a statewide wetlands survey; (3) assist in the enforcement of state laws relating to sand and gravel mining, soil erosion and sedimentation, and shorelands protection; (4) accomplish a variety of regional resource management actions in the East Central Michigan Planning and Development Region. Other tasks on which remote sensing technology was used include industrial and school site selection, ice detachment in the Soo Harbor, grave detection, and data presentation for wastewater management programs.

Lowe, D. S.↗

Technology applications

A summary of NASA Technology Utilization programs for the period of 1 December 1971 through 31 May 1972 is presented. An abbreviated description of the overall Technology Utilization Applications Program is provided as a background for the specific applications examples. Subjects discussed are in the broad headings of: (1) cancer, (2) cardiovascular disease, (2) medical instrumentation, (4) urinary system disorders, (5) rehabilitation medicine, (6) air and water pollution, (7) housing and urban construction, (8) fire safety, (9) law enforcement and criminalistics, (10) transportation, and (11) mine safety.

Anuskiewicz, T.↗

Congressional panel makes recommendations on belt safety

The Mine Improvement and New Emergency Response Act of 2006 (MINER Act) called for a Technical Study Panel to present a review and make recommendations on the use of belt air and the composition and fire retardant properties of belt materials in underground coal mining. In October 2007 the Panel released 20 recommendations publicly. These are presented in the article. Many recommendations encouraged the MSHA to enforce existing laws of maintenance and fire protection or example more vigorously. Maybe the biggest change recommended was that the industry should adopt the Belt Evaluation Laboratory Test (BELT) standard proposed in 1992. Another important recommendation was one that would help eliminate hazards associated with point feeding. 1 photo.

01 COAL, LIGNITE, AND PEAT↗

King Coal vs. Reclamation: federal regulation of mountaintop removal mining in Appalachia

This research focuses on the regulatory politics of mountaintop removal mining for coal within the Appalachian states of West Virginia and Kentucky. Based on Administrative Presidency concepts suggesting that chief executives seek more control and influence over agency program decisions, this article analyzes President George W. Bush's efforts to promote the development of coal resources within these states despite statutory constraints posed by federal environmental laws. The analysis demonstrates that President Bush effectively achieved his energy production goals by combining the use of discretionary authority with staff controls, executive orders, and regulatory initiatives to lessen industry compliance costs with environmental regulatory requirements.

01 COAL, LIGNITE, AND PEAT↗

Systems Life Cycle and Its Relation with the Triple Helix

This chapter examines the life cycle of complex systems in light of the dynamic interconnections among the university, industry and government sectors. Each sector is motivated in its resource allocation by principles discussed elsewhere in this book and yet remains complementary es-tablishing enduring and fundamental relationships. Industry and Government depend upon an educated workforce; universities depend upon industry to spark the R&D which is needed and to sponsor some basic research and much applied research. Government depends upon industry to address operational needs and provide finished products while universities offer government (along with industry) problem solving and problem solving environments. The life cycle of complex systems in this chapter will be examined in this context, providing historical examples. Current examples will then be examined within this multi-dimensional context with respect to the phases of program and project life cycle management from requirements definition through retirement and closeout of systems. During the explanation of these examples, the advances in research techniques to collect, analyze, and process the data will be examined.

and Law↗