Search NASA⌕ Search

SEARCH · Search NASA

Results for “Management planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Underground Test Area Activity Waste Management Plan; and Attachment 1 Fluid Management Plan for the Underground Test Area Activity

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office initiated the Underground Test Area Activity to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada National Security Site. The UGTA Activity is now administered by the DOE Environmental Management Nevada Program. This document is a revision to NNSA/NSO (2009). The new document and revision number reflect EM Nevada Program as the current UGTA Activity administrator.

54 ENVIRONMENTAL SCIENCES↗

Tank Farm Safety Programmable System Software Management Plan

This Software Management Plan (SMP) applies to the configurable programmable logic controller (PLC) software configured as the Tank Farms Safety Programmable System (TFSPS). The TFSPS is identified as a safety-significant (SS) system to prevent loss of the safety function of SS structures, systems, and components (SSC). The TFSPS software is classified as grade level A configurable safety software. The TFSPS consists of safety instrumented systems (SIS) and safety instrumented alarm (SIA) systems.The purpose of this management plan is to describe how Washington River Protection Solutions (WRPS) will configure and manage the TFSPS software and the associated software life cycle (SLC). TFSPS software shall be configured by Process and Control Systems Engineering (P&CSE) as grade level A safety software for use by Production Operations as the primary stakeholders.

97 MATHEMATICS AND COMPUTING↗

Y-12 Groundwater Protection Program Data Management Plan

This Data Management Plan (DMP) describes the processes in place to ensure the integrity of groundwater monitoring information collected by the U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), Y-12 National Security Complex (Y-12), Groundwater Protection Program (GWPP). This information includes program plans, reports, and computer systems used to capture monitoring station information and analytical data. The primary computer system used by the GWPP is the Groundwater Information Management System (GIMS). Procedures used to ensure the integrity of the data are included in this document by reference.

54 ENVIRONMENTAL SCIENCES↗

EMP, Attachment 2: Data Management Plan

This Data Management Plan (DMP) is an attachment to the Pacific Northwest National Laboratory Environmental Radiological Air Monitoring Plan (EMP). PNNL is a U.S. Department of Energy Office of Science national laboratory. Radioactive effluent monitoring and environmental surveillance for PNNL operations in Washington State are the responsibility of the PNNL Environmental Protection and Regulatory Programs division and are conducted by the Environmental Radiation Task staff. This DMP describes the data management processes for PNNL radioactive air emissions (stack) monitoring and environmental radiological ambient air surveillance activities.

40 CFR 61 Subpart H↗

Natural Resource Management Plan

This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

54 ENVIRONMENTAL SCIENCES↗

NIF Operations Management Plan, August 2011

Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the requirements, document flow down, organizational vision and mission, performance metrics, and interrelationship of the NIF Operations organization with other directorate and laboratory organizations. This document also provides a listing of roles and responsibilities, core processes, procedures, authority matrices, change control boards, and other information necessary for successfully functioning in the NIF Operations organization. This document, the NIF Shot Operations Plan, and the NIF Maintenance Plan together represent the primary documents satisfying our Conduct of Operations compliance requirement.

42 ENGINEERING↗

Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended).

54 ENVIRONMENTAL SCIENCES↗

Low-Level Waste Minimization and Management Planning at the Western Waste Management Facility, Ontario Power Generation - 19235

The purpose of this study was to examine the strategies intended to mitigate the temporary storage restrictions for Low-Level radioactive waste at the Western Waste Management Facility to enable continued accommodation of waste generation rates, and to recover storage capacity from 2018-2023 to optimize long-term sustainability for radioactive waste management. The management options considered were based on existing waste processing technologies and programs available at the Western Waste Management Facility, in combination with third party volume-reduction services. Completed analysis measured the consumption of Low-Level Waste storage space as influenced by the projected volumes from nuclear generating stations, and the various processing scenarios developed; such as reducing the volume of surplus processable waste on-site, and the reduction of specific waste streams previously considered to be non-processable. Results from the quantitative analysis indicated which strategies will be most effective for minimizing waste volumes for long-term storage and for recovering low-level storage space at the Western Waste Management Facility. The strategic path forward is presented in short- to long-term management objectives. Results from this study will contribute to the waste stream planning and management of major reactor refurbishment projects and to the technological advancements and innovation of radioactive waste processing and minimization. With further understanding of the refurbishment-specific waste types and volumes, it is expected that Nuclear Waste Management and the nuclear generating stations will achieve increasingly improved minimization results with the progression of each refurbished reactor. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-criteria evaluation in strategic environmental assessment for waste management plan, a case study: The city of Belgrade

Highlights: • The paper deals with the specific method of multi-criteria evaluation applied in drafting the SEA for the Belgrade WMP. • MCE of the planning solutions, assessed according to 37 objectives of the SEA and four sets of criteria, was presented in the matrix form. • The results are presented in the form of graphs so as to be easily comprehensible to all the participants in the decision-making process. • The results represent concrete contribution proven in practice. - Abstract: Strategic Environmental Assessment (SEA) is one of the key instruments for implementing sustainable development strategies in planning in general; in addition to being used in sectoral planning, it can also be used in other areas such as waste management planning. SEA in waste management planning has become a tool for considering the benefits and consequences of the proposed changes in space, also taking into account the capacity of space to sustain the implementation of the planned activities. In order to envisage both the positive and negative implications of a waste management plan for the elements of sustainable development, an adequate methodological approach to evaluating the potential impacts must be adopted and the evaluation results presented in a simple and clear way, so as to allow planners to make relevant decisions as a precondition for the sustainability of the activities planned in the waste management sector. This paper examines the multi-criteria evaluation method for carrying out an SEA for the Waste Management Plan for the city of Belgrade (BWMP). The method was applied to the evaluation of the impacts of the activities planned in the waste management sector on the basis of the environmental and socioeconomic indicators of sustainability, taking into consideration the intensity, spatial extent, probability and frequency of impact, by means of a specific planning approach and simple and clear presentation of the obtained results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wildland Fire Management Plan

The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

54 ENVIRONMENTAL SCIENCES↗

Sewer System Management Plan.

A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Incorporating adaptation and resilience into an integrated watershed and coral reef management plan

Changing environmental conditions are forcing natural resource managers and communities to adapt their strategies to account for global shifts in precipitation, temperature, sea level and more, all of which are occurring in addition to local human impacts. Adapting to threats from climate change requires a fundamental shift in the practice of natural resource management through the development of forward-looking “climate-smart” goals and strategies. Here we present a proof-of-concept application of a decision-support tool to help design climate-smart management actions for the watershed and coral reef management plan for Guánica Bay watershed in southwest Puerto Rico. We also explore the connection between adaptation planning and coral reef resilience, using a recently developed Puerto Rico-wide reef resilience assessment. In the first phase of the study, we used the publicly available Adaptation Design Tool to draft initial climate-smart versions of twelve proposed management actions. In the second phase, two actions (dirt road management on steep slopes, and coral reef restoration) were further refined through consultations with local experts to make more detailed design adjustments; this included the option to use information from the coral reef resilience assessment to inform design improvements. The first phase resulted in moderately detailed assessments that broadly accounted for anticipated direct and indirect effects of climate change on the planned management actions. The second phase resulted in more site-specific technical assessments and additional important design details. The expert panel charged with discussing climate-smart reef restoration around Guánica used the reef resilience assessment to guide discussion of reef restoration, highlighting the importance of having such information available for adaptation planning. This study demonstrates how climate change impacts can be effectively incorporated into a management plan at the most granular level of planning and how a structured, formalized process can be as valuable as the resulting adaptation information.

Gibbs, David A. (ORCID:0000000173898569)↗

Cultural Resource Management Plan for Brookhaven National Laboratory

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references the facets and interrelationships of cultural resources at BNL. Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a “living document.” Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation. The current (2023) update incorporates new findings and/or updated text based on completed or ongoing projects related to cultural resources at BNL since inception of the last updated CRMP in 2013. Historically, Brookhaven National Laboratory had little need for cultural resource management because many of its buildings were less than 50 years old. Most of the features that are potentially eligible for inclusion in the National Register of Historic Places were protected simply by avoiding the features. Compliance with cultural resource laws and regulations has included archeological surveys, such as those associated with the 1977 Final Environmental Impact Statement for Brookhaven National Laboratory and the 1978 Final Environmental Impact Statement for the Proton-Proton Storage Accelerator Facility (ISABELLE). In 1979, World War I trenches associated with the former Camp Upton and located near ISABELLE were determined to be eligible for inclusion in the National Register of Historic Places; however, many of these trenches had been destroyed by construction work. In 1991, the NYSHPO provided BNL with a letter indicating that only three structures and features were likely to be eligible for inclusion in the National Register of Historic Places. Between 1991 and 1999, little work associated with cultural resource management was accomplished. Beginning in 1999, awareness for the need of a program to manage cultural resources grew out of the realization that over half of the buildings at BNL were either 50 years old or were reaching that age and were, therefore, subject to the requirements in Section 106 of the National Historic Preservation Act. This fact, concomitant with the decontamination and decommissioning of the Brookhaven Graphite Research Reactor (BGRR) and the subsequent determination of BGRR’s eligibility for listing as an historical site, fueled the need for developing and implementing a more structured program for managing cultural resources at BNL.

54 ENVIRONMENTAL SCIENCES↗

Social Impact Management Plans: Innovation in corporate and public policy

Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community. • SIMPs link assessment to ongoing management and address social and community issues. • SIMPs clarify responsibilities in the management of impacts, opportunities and risks. • SIMPs demonstrate a shift to include management as a core component of SIA practice.

54 ENVIRONMENTAL SCIENCES↗

Federal Facility Agreement and Consent Order: Nevada National Security Site Use Restriction Management Plan with ROTC 1

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). (Note: This pertains to those FFACO sites not managed by the U.S. Department of Energy [DOE], Legacy Management.) The closure in place alternative is used for sites closed with residual contamination at levels requiring corrective action as determined using the FFACO process. The URs contain and control all requirements for long-term monitoring. This URMP also serves as the single repository of the URs implemented under the FFACO that identify use restricted areas and contain the current requirements for inspections, maintenance, and monitoring of the UR. The requirements in these URs replace all requirements listed in previous documentation. This consolidates post-closure monitoring requirements into a single source that ensures completeness and consistency of UR requirements and information. Standardized UR forms were developed to clearly document post-closure requirements that are consistent with current protocols and to ensure consistent information is contained in the URs. Standard notification, summary, and site controls statements were developed for all URs with provisions to insert site-specific options in the text. Current protocols for Industrial Sites and Soils URs are defined in this document and in the Soils Risk-Based Corrective Action (RBCA) Evaluation Process (DOE/EMNV, 2018). The standardized UR forms that have been approved to date are listed in Appendix A. Additional UR forms will be added once the review and approval process has been completed.

54 ENVIRONMENTAL SCIENCES↗

Federal Facility Agreement and Consent Order Nevada National Security Site Use Restriction Management Plan, Revision 2

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO). It addresses URs established under the FFACO for releases related to the development, testing, and production of nuclear weapons that are located on the NNSS and that are accessed through the NNSS main gate. FFACO URs are established at sites where contamination remains at levels exceeding final action levels (FALs) or is forecasted to exceed Safe Drinking Water Act (SDWA) maximum contaminant levels (CFR, 2025a) over the next 1,000 years following completion of corrective actions. Administrative URs are established at Industrial Sites and Soils sites where contamination remains at levels exceeding industrial action levels as defined in the Soils RBCA document. All URs stipulate restrictions sufficient to ensure the protection of human health, safety, and the environment.

54 ENVIRONMENTAL SCIENCES↗

2023 Risk Management Plan and Register for Low-Power WEC for Non-Grid Applications

This is an updated risk management plan and risk register for the design, build and test of a novel, remote, low-power wave energy converter (WEC) for non-grid applications. This Columbia Power Technologies project seeks to develop a prototype low-power WEC that lowers the total cost of ownership and provides robust, new capabilities for customers in the maritime environment. The testing location for this prototype is the U.S. Navy Wave Energy Test Site (WETS) in Kaneohe Bay, O'ahu, Hawai'i. Detailed in the Risk Management Plan document is a Failure Modes, Effects, and Criticality Analysis (FMEC) that systematically identifies all potential failure modes and their effects on the system. Risk registers for major subsystems were completed according to the methodology described in the Risk Management Plan and are also included here.

16 TIDAL AND WAVE POWER↗