Building Resiliency into Grand Canyon West Micro-Grid
The objective of the project was to improve the resilience of the non-regional-grid-connected electrical generation system at Grand Canyon West (GCW) to withstand short-term disruptions and rising energy costs by installing an 885-kW solar photovoltaic (PV) array and 750-kilowatts (kW)/2,145-kilowatt hour (kWh) battery energy storage system (BESS). The system is designed to provide 50% of the annual energy needed for the essential facilities at GCW, supplementing the existing diesel generators, saving approximately $\$$463,339 per year and an estimated $\$$11,583,475 over the 25-year life of the system. The project aligns with the Tribe’s conservation ethic and self-determination in the area of energy development.