Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mission Critical Workforce Infrastructure and Technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Space Launch System Development Status

Development of NASA's Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than three years after formal program approval. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of Core Stage test panels; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for testing the RS-25 Core Stage engine; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. Objectives of this Earth-orbit flight include validating the performance of Orion's heat shield and the MSA design, which will be manufactured again for SLS missions to deep space. The Program successfully completed Preliminary Design Review in 2013 and Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable, Exploration

Development of NASA's Space Launch System (SLS) exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated December 2017. SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. For the United States current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. This version will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. SLS is designed to evolve to a 130 t lift capability that can reduce mission costs, simplify payload design, reduce trip times, and lower overall risk. Each vehicle element completed its respective Preliminary Design Reviews, followed by the SLS Program. The Program also completed the Key Decision Point-C milestone to move from formulation to implementation in 2014. NASA hasthorized the program to proceed to Critical Design Review, scheduled for 2015. Accomplihments to date include: manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. This paper will discuss SLS Program successes over the past year and examine milestones and challenges ahead. The SLS Program and its elements are managed at NASA's Marshall Space Flight Center (MSFC).

Askins, Bruce R.↗

NASA's Space Launch System Takes Shape: Progress Toward Safe, Affordable Exploration

Development of NASA's Space Launch System exploration-class heavy lift rocket has moved from the formulation phase to implementation in 3 years and will make significant progress this year toward its first launch, slated for December 2017. In recognition of the current fiscal realities, SLS represents a safe, affordable, and evolutionary path to development of an unprecedented capability for future human and robotic exploration and use of space. Current development is focused on a configuration with a 70 metric ton (t) payload to low Earth orbit (LEO), more than double any operational vehicle. It is this version that will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back, as well as the first crewed Orion flight. This configuration is also designed to evolve to 130 t lift capability that offers several benefits, such as reduced mission costs, simplified payload design, faster trip times, and lower overall risk for missions of national significance. The SLS Program formally transitioned from the formulation phase to implementation during the past year, passing its Preliminary Design Review in 2013 and completion of Key Decision Point C in early 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015. Among the Program's many accomplishments are manufacture of core stage test hardware, as well as preparations for testing the world's most powerful solid rocket boosters and the main engines that flew 135 successful Space Shuttle missions. The Program's success to date is due to prudent use of existing technology, infrastructure, and workforce; streamlined management approach; and judicious use of new technologies. The result is a launch vehicle that will carry human and robotic exploration on the history-making missions in the coming decades. This paper will discuss the program and technical successes over the past year and provide a look at the milestones and challenges ahead.

Askins, Bruce↗

An Introduction to Flight Software Development: FSW Today, FSW 2010

Experience and knowledge gained from ongoing maintenance of Space Shuttle Flight Software and new development projects including Cockpit Avionics Upgrade are applied to projected needs of the National Space Exploration Vision through Spiral 2. Lessons learned from these current activities are applied to create a sustainable, reliable model for development of critical software to support Project Constellation. This presentation introduces the technologies, methodologies, and infrastructure needed to produce and sustain high quality software. It will propose what is needed to support a Vision for Space Exploration that places demands on the innovation and productivity needed to support future space exploration. The technologies in use today within FSW development include tools that provide requirements tracking, integrated change management, modeling and simulation software. Specific challenges that have been met include the introduction and integration of Commercial Off the Shelf (COTS) Real Time Operating System for critical functions. Though technology prediction has proved to be imprecise, Project Constellation requirements will need continued integration of new technology with evolving methodologies and changing project infrastructure. Targets for continued technology investment are integrated health monitoring and management, self healing software, standard payload interfaces, autonomous operation, and improvements in training. Emulation of the target hardware will also allow significant streamlining of development and testing. The methodologies in use today for FSW development are object oriented UML design, iterative development using independent components, as well as rapid prototyping . In addition, Lean Six Sigma and CMMI play a critical role in the quality and efficiency of the workforce processes. Over the next six years, we expect these methodologies to merge with other improvements into a consolidated office culture with all processes being guided by automated office assistants. The infrastructure in use today includes strict software development and configuration management procedures, including strong control of resource management and critical skills coverage. This will evolve to a fully integrated staff organization with efficient and effective communication throughout all levels guided by a Mission-Systems Architecture framework with focus on risk management and attention toward inevitable product obsolescence. This infrastructure of computing equipment, software and processes will itself be subject to technological change and need for management of change and improvement,

Gouvela, John↗

Workforce for the Future Development of Space Access Vehicles

The development of advanced vehicles that will travel between planetary surfaces with atmospheres and space requires the availability of experimental and computational capabilities that accomplish the research leading to new technologies and the development, test, and evaluation (RDT&E) of new flight systems. The United States is at risk of not having the required RDT&E workforce – qualified and in sufficient numbers – in place and ready to meet the future market’s commercial and defense needs. Systemic challenges include uncertain Federal budgets that limit and interrupt government research and development, the projectized nature of new space access systems that drive boom/bust cycles, an aging aerospace workforce (compounded by a mid-age demographic gap), limited to declining investment in sustaining and advancing experimental and computational tools infrastructure, lack of standards for sharing (and leveraging) data, dramatically changing technologies, changing social norms, and potentially large increases in commercial market needs. Flight systems have mission-based trajectories to and from space and designers must ensure risk is properly assessed across the entire trajectory. Thus, physics questions must be answered at each stage of flight, which requires a suite of experimental and computational tools. The RDT&E workforce utilizing these tools include subject matter experts from the producers, interested in acquiring data and information on the product, and from the capabilities being utilized, interested in addressing the product customer’s needs (providing robust data collection techniques, data quality, timeliness – available when needed, efficient with cost management, and teaming on data analysis). This requires a range of skills – in addition to aerospace, other engineers, and software developers, a highly trained and certified craft and technician workforce is critical to future success. This paper will present a human resources construct that addresses the system of needs for people – including, but more than just technical skills and an application of that construct in the hypersonic Test and Evaluation (T&E) community. This is part of a larger AIAA effort to document challenges and associated best practices for the aerospace RDT&E workforce.

Steven C Dunn↗

Enabling the Capture and Sharing of NASA Technical Expertise Through Communities of Practice

Historically, engineers at the National Aeronautics and Space Administration (NASA) had few opportunities or incentives to share their technical expertise across the Agency. Its center- and project- focused culture often meant that knowledge never left organizational and geographic boundaries. With increasingly complex missions, the closeout of the Shuttle Program, and a new generation entering the workforce, developing a knowledge sharing culture became critical. To address this need, the Office of the Chief Engineer established communities of practice on the NASA Engineering Network. These communities were strategically aligned with NASA's core competencies in such disciplines as avionics, flight mechanics, life support, propulsion, structures, loads and dynamics, human factors, and guidance, navigation, and control. This paper describes the process used to identify and develop communities, from establishing simple websites that compiled discipline-specific resources to fostering a knowledge-sharing environment through collaborative and interactive technologies. It includes qualitative evidence of improved availability and transfer of knowledge. It focuses on pivotal capabilities that increased knowledge exchange such as a custom-made Ask An Expert system, community contact lists, publication of key resources, and submission forms that allowed any user to propose content for the sites. It discusses the peer relationships that developed through the communities and the leadership and infrastructure that made them possible.

Topousis, Daria E.↗

NASA's Space Launch System: Momentum Builds Toward First Launch

NASA's Space Launch System (SLS) is gaining momentum toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. It will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017. Its first crewed flight follows in 2021. SLS can evolve to a130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. The SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015. In the NASA project life cycle process, SLS has completed 50 percent of its major milestones toward first flight. Every SLS element manufactured development hardware for testing over the past year. Accomplishments during 2013/2014 included manufacture of core stage test articles, preparations for qualification testing the solid rocket boosters and the RS-25 main engines, and shipment of the first flight hardware in preparation for the Exploration Flight Test-1 (EFT-1) in 2014. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd A.↗

NASA's Space Launch System: Momentum Builds Towards First Launch

NASA's Space Launch System (SLS) is gaining momentum programmatically and technically toward the first launch of a new exploration-class heavy lift launch vehicle for international exploration and science initiatives. The SLS comprises an architecture that begins with a vehicle capable of launching 70 metric tons (t) into low Earth orbit. Its first mission will be the launch of the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back. SLS will also launch the first Orion crewed flight in 2021. SLS can evolve to a 130-t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Managed by NASA's Marshall Space Flight Center, the SLS Program formally transitioned from the formulation phase to implementation with the successful completion of the rigorous Key Decision Point C review in 2014. At KDP-C, the Agency Planning Management Council determines the readiness of a program to go to the next life-cycle phase and makes technical, cost, and schedule commitments to its external stakeholders. As a result, the Agency authorized the Program to move forward to Critical Design Review, scheduled for 2015, and a launch readiness date of November 2018. Every SLS element is currently in testing or test preparations. The Program shipped its first flight hardware in 2014 in preparation for Orion's Exploration Flight Test-1 (EFT-1) launch on a Delta IV Heavy rocket in December, a significant first step toward human journeys into deep space. Accomplishments during 2014 included manufacture of Core Stage test articles and preparations for qualification testing the Solid Rocket Boosters and the RS-25 Core Stage engines. SLS was conceived with the goals of safety, affordability, and sustainability, while also providing unprecedented capability for human exploration and scientific discovery beyond Earth orbit. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets through the studied use of hardware, infrastructure, and workforce investments the United States has already made in the last half century, while selectively using new technologies for design, manufacturing, and testing, as well as streamlined management approaches that have increased decision velocity and reduced associated costs. This paper will summarize recent SLS Program technical accomplishments, as well as the challenges and opportunities ahead for the most powerful and capable launch vehicle in history.

May, Todd↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗