At least 19 records

Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

Mixed Integer Programming

Tightest Mixed-Integer Programming Formulations for Quadratic SCUC Optimization

In this project, we developed new, tighter Mixed-Integer Programming (MIP) formulations for the combined Alternating Current (AC) Security-Constrained Unit Commitment (SCUC) and Security-Constrained Optimal Power Flow (SCOPF). The work addresses a critical challenge in power system operations: efficiently determining which generation units to commit and how to optimally dispatch them while maintaining network reliability constraints for both normal and contingency scenarios. Our efforts: 1. Advance the Understanding of SCUC/SCOPF Modeling: By introducing tighter MIP formulations and leveraging cutting-edge optimization tools (Julia/JuMP, PowerModels.jl), this project has pushed forward the state of the art in efficient power systems scheduling. 2. Enhance Technical and Economic Feasibility: The methods developed provide more accurate and potentially faster solutions to large-scale, realistic scheduling and dispatch problems in electric power systems, which can translate into improved reliability and potentially lower costs for grid operations. 3. Benefit to the Public: Greater efficiency in power system operations leads to cost savings for utilities and end-users. Improved reliability and integration of advanced modeling approaches can facilitate the adoption of clean energy resources and better accommodate uncertainties in renewable generation. Because this technology could impact bulk power markets and reliability, these innovations have far-reaching public benefits in terms of cost savings, reliability, and sustainability.

24 POWER TRANSMISSION AND DISTRIBUTION

Mixed Integer Programming and Heuristic Scheduling for Space Communication

Optimal planning and scheduling for a communication network was created where the nodes within the network are communicating at the highest possible rates while meeting the mission requirements and operational constraints. The planning and scheduling problem was formulated in the framework of Mixed Integer Programming (MIP) to introduce a special penalty function to convert the MIP problem into a continuous optimization problem, and to solve the constrained optimization problem using heuristic optimization. The communication network consists of space and ground assets with the link dynamics between any two assets varying with respect to time, distance, and telecom configurations. One asset could be communicating with another at very high data rates at one time, and at other times, communication is impossible, as the asset could be inaccessible from the network due to planetary occultation. Based on the network's geometric dynamics and link capabilities, the start time, end time, and link configuration of each view period are selected to maximize the communication efficiency within the network. Mathematical formulations for the constrained mixed integer optimization problem were derived, and efficient analytical and numerical techniques were developed to find the optimal solution. By setting up the problem using MIP, the search space for the optimization problem is reduced significantly, thereby speeding up the solution process. The ratio of the dimension of the traditional method over the proposed formulation is approximately an order N (single) to 2*N (arraying), where N is the number of receiving antennas of a node. By introducing a special penalty function, the MIP problem with non-differentiable cost function and nonlinear constraints can be converted into a continuous variable problem, whose solution is possible.

Lee, Charles H.

Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

In this paper, we propose to solve the constrained optimization problem in two phases. The first phase uses heuristic methods such as the ant colony method, particle swarming optimization, and genetic algorithm to seek a near optimal solution among a list of feasible initial populations. The final optimal solution can be found by using the solution of the first phase as the initial condition to the SQP algorithm. We demonstrate the above problem formulation and optimization schemes with a large-scale network that includes the DSN ground stations and a number of spacecraft of deep space missions.

Communication Network Scheduling

Optimal sizing of battery energy storage systems for peak shaving and demand response using a degradation-aware Bayesian Optimization-Mixed-Integer Linear Programming framework

The increasing integration of renewable energy and rising electricity demand highlight the importance of battery energy storage systems for peak shaving and demand response. Unlike prior approaches that overlook operational impacts on degradation, this study proposes a Bayesian Optimization–Mixed Integer Linear Programming framework for optimal battery energy storage system sizing. In this framework, Mixed Integer Linear Programming determines short-term scheduling while a calibrated electrochemical model iteratively evaluates degradation. The central hypothesis is that the framework can efficiently identify optimal sizes that yield realistic and economically robust outcomes. The method is tested across three scenarios: peak shaving, peak shaving with energy-reduction demand response, and peak shaving with power-reduction demand response. Results show that the framework converge to the optimum within 20 iterations out of 150 possible sizes. Under baseline conditions, the framework consistently selects the smallest feasible system, minimizing unnecessary degradation costs from oversized storage. Sensitivity analyses reveal that larger systems are favored as demand rates or incentives increase. Comparisons of demand response programs indicate that power-reduction demand response offers greater economic benefits than energy-reduction demand response, although demand savings from peak shaving remain the dominant contributor to overall performance. This study demonstrates that the proposed framework balances computational tractability with degradation fidelity, identifies critical economic thresholds for investment, and offers a practical, flexible tool to guide industrial stakeholders in cost-effective battery energy storage system deployment.

Batteries

Mixed Integer Linear Programming in Planning

This project, Activity Planning with Resources for the Exploration of Space (APRES), uses a mixed-integer linear program (MILP) to solve planning problems. This work enables APRES to interpret a model file and output a solution with improved human readability. A plan model is optimized using a MILP solver and the best solution is taken. Once a plan is generated, it is parsed allowing it to retain only desired information and modified for swift human readability.

Christina Erwin

The role of service areas in the optimization of FSS orbital and frequency assignments

An implicit relationship is derived which relates the topocentric separation of two satellites required for a given level of single-entry protection to the separation and orientation of their service areas. The results are presented explicitly for circular beams and topocentric angles. A computational approach is given for elliptical beams and for use with longitude and latitude variables. It is found that the geocentric separation depends primarily on the service area separation, secondarily on a parameter which characterizes the electrical design, and only slightly on the mean orbital position of the satellites. Both linear programming and mixed integer programming algorithms are implemented. Possible objective function choices are discussed, and explicit formulations are presented for the choice of the sum of the absolute deviations of the orbital locations from some prescribed 'ideal' location set. A test problem involving six service areas is examined with results that are encouraging with respect to applying the linear programming procedure to larger scenarios.

Levis, C. A.

A Mixed Integer Linear Program for Solving a Multiple Route Taxi Scheduling Problem

Aircraft movements on taxiways at busy airports often create bottlenecks. This paper introduces a mixed integer linear program to solve a Multiple Route Aircraft Taxi Scheduling Problem. The outputs of the model are in the form of optimal taxi schedules, which include routing decisions for taxiing aircraft. The model extends an existing single route formulation to include routing decisions. An efficient comparison framework compares the multi-route formulation and the single route formulation. The multi-route model is exercised for east side airport surface traffic at Dallas/Fort Worth International Airport to determine if any arrival taxi time savings can be achieved by allowing arrivals to have two taxi routes: a route that crosses an active departure runway and a perimeter route that avoids the crossing. Results indicate that the multi-route formulation yields reduced arrival taxi times over the single route formulation only when a perimeter taxiway is used. In conditions where the departure aircraft are given an optimal and fixed takeoff sequence, accumulative arrival taxi time savings in the multi-route formulation can be as high as 3.6 hours more than the single route formulation. If the departure sequence is not optimal, the multi-route formulation results in less taxi time savings made over the single route formulation, but the average arrival taxi time is significantly decreased.

Montoya, Justin Vincent

Alternative mixed integer linear programming optimization for joint job scheduling and data allocation in grid computing

This paper presents a novel approach to the joint optimization of job scheduling and data allocation in grid computing environments. We formulate this joint optimization problem as a mixed integer quadratically constrained program. To tackle the nonlinearity in the constraint, we alternatively fix a subset of decision variables and optimize the remaining ones via Mixed Integer Linear Programming (MILP). We solve the MILP problem at each iteration via an off-the-shelf MILP solver. Our experimental results show that our method significantly outperforms existing heuristic methods, employing either independent optimization or joint optimization strategies. We have also verified the generalization ability of our method over grid environments with various sizes and its high robustness to the algorithm setting.

97 MATHEMATICS AND COMPUTING

Foraging with MUSHROOMS: A Mixed-integer Linear Programming Scheduler for Multimessenger Target of Opportunity Searches with the Zwicky Transient Facility

Electromagnetic follow-up of gravitational-wave detections is very resource intensive, taking up hours of limited observation time on dozens of telescopes. Creating more efficient schedules for follow-up will lead to a commensurate increase in counterpart location efficiency without using more telescope time. Widely used in operations research and telescope scheduling, mixed-integer linear programming is a strong candidate to produce these higher-efficiency schedules, as it can make use of powerful commercial solvers that find globally optimal solutions to provided problems. We detail a new target-of-opportunity scheduling algorithm designed with Zwicky Transient Facility in mind that uses mixed-integer linear programming. We compare its performance to gwemopt, the tuned heuristic scheduler used by the Zwicky Transient Facility and other facilities during the third LIGO–Virgo gravitational-wave observing run. This new algorithm uses variable-length observing blocks to enforce cadence requirements and to ensure field observability, along with having a secondary optimization step to minimize slew time. We show that by employing a hybrid method utilizing both this scheduler and gwemopt, the previous scheduler used, in concert, we can achieve an average improvement in detection efficiency of 3%–11% over gwemopt alone for a simulated binary neutron star merger data set consistent with LIGO–Virgo's third observing run, highlighting the potential of mixed-integer target of opportunity schedulers for future multimessenger follow-up surveys.

B Parazin

Multi-parametric analysis for mixed integer linear programming: An application to transmission upgrade and congestion management

Upgrading the capacity of existing transmission lines is essential for meeting the growing energy demands, facilitating the integration of renewable energy, and ensuring the security of the transmission system. This study focuses on the selection of lines whose capacities and by how much should be expanded from the perspective of the Independent System Operators (ISOs) to minimize the total system cost. We employ advanced multi-parametric programming and an enhanced branch-and-bound algorithm to address complex mixed-integer linear programming (MILP) problems, considering multi-period time constraints and physical limitations of generators and transmission lines. To characterize the various decisions in transmission expansion, we model the increased capacity of existing lines as parameters within a specified range. This study first relaxes the binary variables to continuous variables and applies the Lagrange method and Karush-Kuhn-Tucker (KKT) conditions to obtain optimal solutions and identify critical regions associated with active and inactive constraints. Moreover, we extend the traditional branch-and-bound (B&B) method by determining the problem’s upper and lower bounds at each node of the B&B decision tree, helping to manage computational challenges in large-scale MILP problems. Here, we compare the difference between the upper and lower bounds to obtain an approximate optimal solution within the decision-makers’ tolerable error range. In addition, the first derivative of the objective function on the parameters of each line is used to inform the selection of lines for easing congestion and maximizing social welfare. Finally, the capacity upgrades are selected by weighing the reductions in system costs against the expense of upgrading line capacities. The findings are supported by numerical simulations and provide transmission-line planners with decision-making guidance.

24 POWER TRANSMISSION AND DISTRIBUTION

Optimizing district energy systems by integrating Borehole Thermal Energy Storage Using a Mixed-Integer Linear Programming g-function framework with a Multi-Timescale Rolling Horizon method

Shallow geothermal has gained increasing attention in recent years; however, a reliable framework for its accurate incorporation into large-scale energy system optimization remains lacking. This study proposes a Mixed-Integer Linear Programming (MILP) framework combined with the g-function approach to integrate Borehole Thermal Energy Storage (BTES) technology into energy system optimization. Validation against a Modelica-based reservoir network simulation demonstrates that the proposed framework effectively captures the ground thermal response under varying energy loads and accurately estimates the borefield energy supply. To enhance scalability, a Rolling Horizon with Multi-Timescale (RH-MTS) method is further introduced, reducing computational time by 73 % for the 1-year optimization model with only minor loss of optimality. The framework is demonstrated through the case study of the UC Berkeley campus. Results indicate that BTES is a cost-effective and low-carbon solution: two borefields comprising 382 boreholes can meet 8.0 % and 6.6 % of the total campus heating and cooling demand, respectively, at an average energy rate of 0.70–0.77 USD/kWh and carbon intensity of 0.54 kg-CO2/kWh. Short-term analysis reveals a 35%–65% decline in BTES energy flow after 3–6 months of continuous heating/cooling operation, while long-term simulation shows that annual energy production of BTES can vary by up to 12.0 % after four years before stabilizing. Overall, this study develops a novel optimization framework that couples physics-based g-function method with MILP optimization framework, thereby advancing methodological development for shallow-geothermal integration and providing actionable guidance for BTES deployment in district-energy systems.

Yang, Jiahui

A Mixed Integer Linear Program for Airport Departure Scheduling

Aircraft departing from an airport are subject to numerous constraints while scheduling departure times. These constraints include wake-separation constraints for successive departures, miles-in-trail separation for aircraft bound for the same departure fixes, and time-window or prioritization constraints for individual flights. Besides these, emissions as well as increased fuel consumption due to inefficient scheduling need to be included. Addressing all the above constraints in a single framework while allowing for resequencing of the aircraft using runway queues is critical to the implementation of the Next Generation Air Transport System (NextGen) concepts. Prior work on airport departure scheduling has addressed some of the above. However, existing methods use pre-determined runway queues, and schedule aircraft from these departure queues. The source of such pre-determined queues is not explicit, and could potentially be a subjective controller input. Determining runway queues and scheduling within the same framework would potentially result in better scheduling. This paper presents a mixed integer linear program (MILP) for the departure-scheduling problem. The program takes as input the incoming sequence of aircraft for departure from a runway, along with their earliest departure times and an optional prioritization scheme based on time-window of departure for each aircraft. The program then assigns these aircraft to the available departure queues and schedules departure times, explicitly considering wake separation and departure fix restrictions to minimize total delay for all aircraft. The approach is generalized and can be used in a variety of situations, and allows for aircraft prioritization based on operational as well as environmental considerations. We present the MILP in the paper, along with benefits over the first-come-first-serve (FCFS) scheme for numerous randomized problems based on real-world settings. The MILP results in substantially reduced delays as compared to FCFS, and the magnitude of the savings depends on the queue and departure fix structure. The MILP assumes deterministic aircraft arrival times at the runway queues. However, due to taxi time uncertainty, aircraft might arrive either earlier or later than these deterministic times. Thus, to incorporate this uncertainty, we present a method for using the MILP with "overlap discounted rolling planning horizon". The approach is based on valuing near-term decision results more than future ones. We develop a model of taxitime uncertainty based on real-world data, and then compare the baseline FCFS delays with delays using the above MILP in a simple rolling-horizon method and in the overlap discounted scheme.

Gupta, Gautam

Optimal Electrification Using Renewable Energies: Microgrid Installation Model with Combined Mixture k-Means Clustering Algorithm, Mixed Integer Linear Programming, and Onsset Method

Optimal planning and design of microgrids are priorities in the electrification of off-grid areas. Indeed, in one of the Sustainable Development Goals (SDG 7), the UN recommends universal access to electricity for all at the lowest cost. Several optimization methods with different strategies have been proposed in the literature as ways to achieve this goal. This paper proposes a microgrid installation and planning model based on a combination of several techniques. The programming language Python 3.10 was used in conjunction with machine learning techniques such as unsupervised learning based on K-means clustering and deterministic optimization methods based on mixed linear programming. These methods were complemented by the open-source spatial method for optimal electrification planning: onsset. Four levels of study were carried out. The first level consisted of simulating the model obtained with a cluster, which is considered based on the elbow and k-means clustering method as a case study. The second level involved sizing the microgrid with a capacity of 40 kW and optimizing all the resources available on site. The example of the different resources in the Togo case was considered. At the third level, the work consisted of proposing an optimal connection model for the microgrid based on voltage stability constraints and considering, above all, the capacity limit of the source substation. Finally, the fourth level involved a planning study of electrification strategies based mainly on microgrids according to the study scenario. The results of the first level of study enabled us to obtain an optimal location for the centroid of the cluster under consideration, according to the different load positions of this cluster. Then, the results of the second level of study were used to highlight the optimal resources obtained and proposed by the optimization model formulated based on the various technology costs, such as investment, maintenance, and operating costs, which were based on the technical limits of the various technologies. In these results, solar systems account for 80% of the maximum load considered, compared to 7.5% for wind systems and 12.5% for battery systems. Next, an optimal microgrid connection model was proposed based on the constraints of a voltage stability limit estimated to be 10% of the maximum voltage drop. The results obtained for the third level of study enabled us to present selective results for load nodes in relation to the source station node. Finally, the last results made it possible to plan electrification using different network technologies and systems in the short and long term. The case study of Togo was taken into account. The various results obtained from the different techniques provide the necessary leads for a feasibility study for optimal electrification of off-grid areas using microgrid systems.

24 POWER TRANSMISSION AND DISTRIBUTION

Mixed-Integer Linear Programming Formulation with Embedded Machine Learning Surrogates for the Design of Chemical Process Families

In previous work, we introduced process family design. The main idea is to design a platform of common elements, and, allowing us to capture additional cost savings, simultaneously design a family of processes, and reducing both engineering and deployment timelines. We formulate this as an optimization problem, specifically a nonlinear generalized disjunctive program (GDP). We have proposed two approaches for reformulating and solving this problem: one based on full-discretization of the design space and one that uses Machine Learning (ML) surrogates to replace the nonlinear process models. Using ML surrogates to predict required system costs and performance indicators allows us to reformulate the nonlinearities in the GDP generate an efficient MILP formulation. In this work, we apply the ML surrogate approach to two case studies. One case study involves designing a family of carbon capture systems to cover a set of different flue gas flow rates and inlet CO 2 concentrations, where we consider the absorber and stripper as common unit module types. The second case study focuses on a water-desalination process, where we design a family of these processes for a variety of salt concentrations and flow rates. In both of these case studies, we demonstrate a scalable optimization approach that enables the design of multiple processes simultaneously, reducing the time-to-market and overall costs by maximizing the cost savings due to both economies of scale and economies of numbers.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

Engineering calculations for communications satellite systems planning

Computer-based techniques for optimizing communications-satellite orbit and frequency assignments are discussed. A gradient-search code was tested against a BSS scenario derived from the RARC-83 data. Improvement was obtained, but each iteration requires about 50 minutes of IBM-3081 CPU time. Gradient-search experiments on a small FSS test problem, consisting of a single service area served by 8 satellites, showed quickest convergence when the satellites were all initially placed near the center of the available orbital arc with moderate spacing. A transformation technique is proposed for investigating the surface topography of the objective function used in the gradient-search method. A new synthesis approach is based on transforming single-entry interference constraints into corresponding constraints on satellite spacings. These constraints are used with linear objective functions to formulate the co-channel orbital assignment task as a linear-programming (LP) problem or mixed integer programming (MIP) problem. Globally optimal solutions are always found with the MIP problems, but not necessarily with the LP problems. The MIP solutions can be used to evaluate the quality of the LP solutions. The initial results are very encouraging.

Reilly, C. H.