Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mixed-integer linear programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Foraging with MUSHROOMS: A Mixed-integer Linear Programming Scheduler for Multimessenger Target of Opportunity Searches with the Zwicky Transient Facility

Electromagnetic follow-up of gravitational-wave detections is very resource intensive, taking up hours of limited observation time on dozens of telescopes. Creating more efficient schedules for follow-up will lead to a commensurate increase in counterpart location efficiency without using more telescope time. Widely used in operations research and telescope scheduling, mixed-integer linear programming is a strong candidate to produce these higher-efficiency schedules, as it can make use of powerful commercial solvers that find globally optimal solutions to provided problems. We detail a new target-of-opportunity scheduling algorithm designed with Zwicky Transient Facility in mind that uses mixed-integer linear programming. We compare its performance to gwemopt, the tuned heuristic scheduler used by the Zwicky Transient Facility and other facilities during the third LIGO–Virgo gravitational-wave observing run. This new algorithm uses variable-length observing blocks to enforce cadence requirements and to ensure field observability, along with having a secondary optimization step to minimize slew time. We show that by employing a hybrid method utilizing both this scheduler and gwemopt, the previous scheduler used, in concert, we can achieve an average improvement in detection efficiency of 3%–11% over gwemopt alone for a simulated binary neutron star merger data set consistent with LIGO–Virgo's third observing run, highlighting the potential of mixed-integer target of opportunity schedulers for future multimessenger follow-up surveys.

B Parazin↗

Mixed Integer Linear Programming in Planning

This project, Activity Planning with Resources for the Exploration of Space (APRES), uses a mixed-integer linear program (MILP) to solve planning problems. This work enables APRES to interpret a model file and output a solution with improved human readability. A plan model is optimized using a MILP solver and the best solution is taken. Once a plan is generated, it is parsed allowing it to retain only desired information and modified for swift human readability.

Christina Erwin↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

A DSN optimal spacecraft scheduling model

A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's Method and a heuristic starting algorithm.

Webb, W. A.↗

An optimal spacecraft scheduling model for the NASA deep space network

A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's method and a heuristic starting algorithm.

Webb, W. A.↗

A method for nonlinear optimization with discrete design variables

A numerical method is presented for the solution of nonlinear discrete optimization problems. The applicability of discrete optimization to engineering design is discussed, and several standard structural optimization problems are solved using discrete design variables. The method uses approximation techniques to create subproblems suitable for linear mixed-integer programming methods. The method employs existing software for continuous optimization and integer programming.

Olsen, Gregory R.↗

A k-permutation algorithm for Fixed Satellite Service orbital allotments

A satellite system synthesis problem, the satellite location problem (SLP), is addressed in this paper. In SLP, orbital locations (longitudes) are allotted to geostationary satellites in the Fixed Satellite Service. A linear mixed-integer programming model is presented that views SLP as a combination of two problems: (1) the problem of ordering the satellites and (2) the problem of locating the satellites given some ordering. A special-purpose heuristic procedure, a k-permutation algorithm, that has been developed to find solutions to SLPs formulated in the manner suggested is described. Solutions to small example problems are presented and analyzed.

Reilly, Charles H.↗

Finding fixed satellite service orbital allotments with a k-permutation algorithm

A satellite system synthesis problem, the satellite location problem (SLP), is addressed. In SLP, orbital locations (longitudes) are allotted to geostationary satellites in the fixed satellite service. A linear mixed-integer programming model is presented that views SLP as a combination of two problems: the problem of ordering the satellites and the problem of locating the satellites given some ordering. A special-purpose heuristic procedure, a k-permutation algorithm, has been developed to find solutions to SLPs. Solutions to small sample problems are presented and analyzed on the basis of calculated interferences.

Reilly, Charles H.↗

Optimization Routine for Generating Medical Kits for Spaceflight Using the Integrated Medical Model

The Integrated Medical Model (IMM) is a MATLAB model that provides probabilistic assessment of the medical risk associated with human spaceflight missions.Different simulations or profiles can be run in which input conditions regarding both mission characteristics and crew characteristics may vary. For each simulation, the IMM records the total medical events that occur and “treats” each event with resources drawn from import scripts. IMM outputs include Total Medical Events (TME), Crew Health Index (CHI), probability of Evacuation (pEVAC), and probability of Loss of Crew Life (pLOCL).The Crew Health Index is determined by the amount of quality time lost (QTL). Previously, an optimization code was implemented in order to efficiently generate medical kits. The kits were optimized to have the greatest benefit possible, given amass and/or volume constraint. A 6-crew, 14-day lunar mission was chosen for the simulation and run through the IMM for 100,000 trials. A built-in MATLAB solver, mixed-integer linear programming, was used for the optimization routine. Kits were generated in 10% increments ranging from 10%-100% of the benefit constraints. Conditions wheremass alone was minimized, volume alone was minimized, and where mass and volume were minimizedjointly were tested.

Medical Kit↗

An Approach to Reasoning Service Migration in Data and Reasoning Fabric (DRF) Implementation

In this paper we consider service migration problem for Data and Reasoning Fabric (DRF) enabled airspace operations assuming a fixed cloud/edge infrastructure with allocated computing, storage and power resources, where cloud/edge servers, and communication stations are in a wired connected network, while vehicles use a wireless network for communication. The objective is to automatically select the best location for the requested service execution, which achieves minimum cost while satisfying the user quality of service (QoS) and available resources constraints. To this end, estimates of the response time, consumed energy and total cost are defined for each potential compute location. A mixed-integer linear program is then formulated and solved to identify optimal compute locations given QoS constraints, network infrastructure limitations, with worst-case vehicle positioning. The approach is applied to trajectory re-planning use case to avoid a collision with an emergency vehicle in real time.

Air mobility↗

Multi-Robot Assembly Scheduling for the Lunar Crater Radio Telescope on the Far-Side of the Moon

The Lunar Crater Radio Telescope (LCRT) is a pro- posed ultra-long-wavelength radio telescope to be constructed on the far side of the moon. The proposed telescope will be constructed by deploying a 1km wire mesh in a 3-5km crater using a team of wall-climbing DuAxel robots. In this work, we consider the problem of generating minimum-time assembly sequences for LCRT, using realistic models of travel speed and lighting. Specifically, we pose the assembly sequencing problem as a mixed-integer linear program (MILP), which we solve to global optimality using commercial solvers. We present methods for modeling time-varying travel and assembly times, based on variable lighting conditions (including crater shadowing), and show how such time-varying parameters can be incorporated into the MILP. Finally, we present numerical studies of our method, showing how makespan varies with the number of assembly robots.

Schwager, Mac↗

Efficient Trajectory Options Allocation for the Collaborative Trajectory Options Program

The Collaborative Trajectory Options Program (CTOP) is a Traffic Management Initiative (TMI) intended to control the air traffic flow rates at multiple specified Flow Constrained Areas (FCAs), where demand exceeds capacity. CTOP allows flight operators to submit the desired Trajectory Options Set (TOS) for each affected flight with associated Relative Trajectory Cost (RTC) for each option. CTOP then creates a feasible schedule that complies with capacity constraints by assigning affected flights with routes and departure delays in such a way as to minimize the total cost while maintaining equity across flight operators. The current version of CTOP implements a Ration-by-Schedule (RBS) scheme, which assigns the best available options to flights based on a First-Scheduled-First-Served heuristic. In the present study, an alternative flight scheduling approach is developed based on linear optimization. Results suggest that such an approach can significantly reduce flight delays, in the deterministic case, while maintaining equity as defined using a Max-Min fairness scheme.

Traffic Management Initiative (TMI)↗

Optimization of orbital assignment and specification of service areas in satellite communications

The mathematical nature of the orbital and frequency assignment problem for communications satellites is explored, and it is shown that choosing the correct permutations of the orbit locations and frequency assignments is an important step in arriving at values which satisfy the signal-quality requirements. Two methods are proposed to achieve better spectrum/orbit utilization. The first, called the delta S concept, leads to orbital assignment solutions via either mixed-integer or restricted basis entry linear programming techniques; the method guarantees good single-entry carrier-to-interference ratio results. In the second, a basis for specifying service areas is proposed for the Fixed Satellite Service. It is suggested that service areas should be specified according to the communications-demand density in conjunction with the delta S concept in order to enable the system planner to specify more satellites and provide more communications supply.

Wang, Cou-Way↗

The role of service areas in the optimization of FSS orbital and frequency assignments

A relationship is derived, on a single-entry interference basis, for the minimum allowable spacing between two satellites as a function of electrical parameters and service-area geometries. For circular beams, universal curves relate the topocentric satellite spacing angle to the service-area separation angle measured at the satellite. The corresponding geocentric spacing depends only weakly on the mean longitude of the two satellites, and this is true also for alliptical antenna beams. As a consequence, if frequency channels are preassigned, the orbital assignment synthesis of a satellite system can be formulated as a mixed-integer programming (MIP) problem or approximated by a linear programming (LP) problem, with the interference protection requirements enforced by constraints while some linear function is optimized. Possible objective-function choices are discussed and explicit formulations are presented for the choice of the sum of the absolute deviations of the orbital locations from some prescribed ideal location set. A test problem is posed consisting of six service areas, each served by one satellite, all using elliptical antenna beams and the same frequency channels. Numerical results are given for the three ideal location prescriptions for both the MIP and LP formulations. The resulting scenarios also satisfy reasonable aggregate interference protection requirements.

Levis, C. A.↗

Menu-Driven Solver Of Linear-Programming Problems

Program assists inexperienced user in formulating linear-programming problems. A Linear Program Solver (ALPS) computer program is full-featured LP analysis program. Solves plain linear-programming problems as well as more-complicated mixed-integer and pure-integer programs. Also contains efficient technique for solution of purely binary linear-programming problems. Written entirely in IBM's APL2/PC software, Version 1.01. Packed program contains licensed material, property of IBM (copyright 1988, all rights reserved).

Viterna, L. A.↗

Next Generation Aircraft Design Considering Airline Operations and Economics

Traditional approaches to design and optimization of a new system often use a system-centric objective and do not take into consideration how the operator will use this new system alongside other existing systems. When the new system design is incorporated into the broader group of systems, the performance of the operator-level objective can be sub-optimal due to the unmodeled interaction between the new system and the other systems. Among the few available references that describe attempts to address this disconnect, most follow an MDO (Multidisciplinary Design Optimization)-motivated sequential decomposition approach of first designing a very good system and then providing this system to the operator who, decides the best way to use this new system along with the existing systems. This paper addresses this issue by including aircraft design, airline operations, and revenue management "subspaces"; and presents an approach that could simultaneously solve these subspaces posed as a monolithic optimization problem rather than the traditional approach described above. The monolithic approach makes the problem an expensive Mixed Integer Non-Linear Programming problem, which are extremely difficult to solve. To address the problem, we use a recently developed optimization framework that simultaneously solves the subspaces to capture the "synergy" in the problem that the previous decomposition approaches did not exploit, addresses mixed-integer/discrete type design variables in an efficient manner, and accounts for computationally expensive analysis tools. This approach solves an 11-route airline network problem consisting of 94 decision variables including 33 integer and 61 continuous type variables. Simultaneously solving the subspaces leads to significant improvement in the fleet-level objective of the airline when compared to the previously developed sequential subspace decomposition approach.

Roy, Satadru↗

An optimization model for energy generation and distribution in a dynamic facility

An analytical model is described using linear programming for the optimum generation and distribution of energy demands among competing energy resources and different economic criteria. The model, which will be used as a general engineering tool in the analysis of the Deep Space Network ground facility, considers several essential decisions for better design and operation. The decisions sought for the particular energy application include: the optimum time to build an assembly of elements, inclusion of a storage medium of some type, and the size or capacity of the elements that will minimize the total life-cycle cost over a given number of years. The model, which is structured in multiple time divisions, employ the decomposition principle for large-size matrices, the branch-and-bound method in mixed-integer programming, and the revised simplex technique for efficient and economic computer use.

Lansing, F. L.↗