Search NASASearch

SEARCH · Search NASA

Results for “Modular Home”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Benefits Of Automated Construction And Energy Efficiency Measures In Modular Homes

This article builds on and adds to a Buildings XV publication that introduced the Transformative Efficiency and Automation in Modular Homes (TEAMH) project. The TEAMH project sought to develop a scalable solution for producing modular homes with 20-50% energy savings and similar cost relative to site-fabricated single-family home construction. A key aspect of the project was assessing the potential for labor cost reductions through automation-assisted construction using light gauge steel (LGS). To quantify the advantages of this approach, side-by-side comparisons were made between traditional wood-framed construction and automation-assisted LGS construction. This demonstration involved constructing one wood-framed wall and several LGS test walls, accompanied by a time-and-motion study. The results indicated that automation assistance could decrease construction time and associated labor costs by as much as 46%. High-performance envelope technologies for exterior insulation and air sealing were evaluated to compare modular homes with site-built homes that meet the International Energy Conservation Code (IECC). A key technology considered was vacuum insulation panels (VIPs) with fiberglass cores. Guarded hot box testing of multiple full-scale wall assemblies containing different combinations of exterior continuous insulation systems containing phenolic foam and VIPs. Testing on various full-scale wall assemblies revealed that, with LGS construction, cavity insulation had minimal impact on exterior wall performance. Omitting cavity insulation can reduce labor and material costs while streamlining manufacturing, as its installation is labor-intensive and not easily automated due to the need for precise placement around wiring and other internal components. Guarded hot box tests of multiple LGS test walls with foam and VIP-based exterior insulation systems achieved R-values of up to 31 hr-ft2-°F/Btu. Finally, building energy modeling of multiple modular home designs indicated that the upgraded envelope assemblies can yield heating energy savings of up to 50% and cooling energy savings of up to 30% compared to IECC 2018 standards.

Shrestha, Som [ORNL] (ORCID:0000000183993797)

Transformative Efficiency and Automation in Modular Homes (TEAMH)

This report documents the Transformative Efficiency and Automation in Modular Homes (TEAMH) project, which evaluates the integration of advanced building envelope technologies and automation-assisted modular construction to improve residential energy performance and construction efficiency. The study investigates high-performance insulation systems, including vacuum insulation panels (VIPs), combined with light gauge steel (LGS) modular construction and factory automation. Laboratory testing, whole-building energy modeling across multiple climate zones, and factory demonstrations were conducted to assess thermal performance, energy savings, and production efficiency. Results indicate that upgraded envelope assemblies can achieve up to ~50% heating and ~34% cooling energy savings relative to IECC 2018 code-compliant homes, while automation-assisted construction can reduce wall assembly time by 24%–46% compared to conventional wood framing. The findings demonstrate the potential for scalable, high-performance modular homes that deliver significant energy savings with competitive projected costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Halau Uma: Kahikinui Community Cultural, Educational, and Resilience Center Preliminary Design Technical Assistance Summary Report

The Kahikinui Homestead Community in Maui faces energy resilience challenges due to its remote, off-grid location. This report summarizes preliminary technical assistance to design a microgrid for six modular homes using solar PV, wind, and battery storage. Results indicate that a hybrid PV and battery system, supplemented by small wind turbines, offers a cost-effective, resilient solution supporting energy independence and disaster preparedness.

Quiroz, Jimmy Edward [Sandia National Laboratories

Kauhale 'O Kipapa: Kahikinui Community Cultural, Educational, and Resilience Center Preliminary Design Technical Assistance Summary Report

The Kahikinui Homestead Community in Maui faces energy resilience challenges due to its remote, off-grid location. This report summarizes preliminary technical assistance to design a microgrid for six modular homes using solar PV, wind, and battery storage. Findings show hybrid PV and battery systems, supplemented by small wind turbines, offer cost-effective, resilient solutions. This work supports enhanced energy independence and disaster preparedness for the community.

Quiroz, Jimmy Edward [Sandia National Laboratories

Construction Methodology Transformation for the Benefit of Workforce Development

Construction is a key economic engine driving both national and global economies. While manual, onsite construction methods dominate the U.S. construction industry, a major shift towards offsite methods has been underway due to its efficiency, speed, and potential cost savings. The workforce necessary for offsite construction growth does not exist in its current form because of the focus on onsite methodologies and the lack of exposure to offsite building methods at all levels of a student’s learning journey. The growth of the U.S. construction industry and competitiveness in an increasingly global construction market over the coming decades can only be supported by a dramatic increase in the use of offsite methods, which requires ramping up workforce training for certain skillsets. The goal of Construction Methodology Transformation for the Benefit of Workforce Development was to understand the opportunities and barriers in both education and industry and to identify best practices for offering curriculum and training to educators, industry, and students that would support skills needed for careers in offsite construction. Our team proposed combining three offsite construction workforce development needs: content development, exposure and training, and job placement - under a single Platform model that would increase experience and career opportunities for students and help match them with potential industry members. Through our proposed solution we expected to see: developed offsite curriculum being utilized by educators and students; an increase in the identification of construction technology and offsite construction methods; an average increase in knowledge gain of at least 25% after participation in pilots; better equipped candidates who are prepared for jobs in offsite construction; and a beta workforce development platform that helps build more pathways for students looking for careers in offsite construction. The two pilots included almost 250 students and resulted in an average knowledge gain of 37 percent. Our research has identified areas of opportunity, for both education and industry to make collaborative training programs more efficient and successful. The chosen techniques for this program are extremely effective when both the school and factory have solid processes and cultures in place to accept students into training programs. This project serves as an important stepping stone to industrywide collaboration to move workforce development for offsite construction forward across the country. With continued collaboration programs like this can provide much needed early exposure and training in offsite construction and we can begin to fill important positions for the future of construction.

99 GENERAL AND MISCELLANEOUS

Comparative life cycle assessment of a modular cross-laminated timber residential building designed for disassembly and reuse versus traditional wood frame construction

There is a need for affordable housing across the U.S., with high-performance modular and prefabricated buildings providing a logical avenue for meeting some of this demand. However, there is a need to balance high performance construction – including low emissions – with affordability. To provide a proof-of-concept in meeting these goals, the Circular Home is a cross-laminated timber (CLT)-based deconstructible and reconfigurable single-family residence that meets high performance targets in moisture, energy, design, economics, and life cycle assessment (LCA). This study focuses on the LCA, presenting a cradle-to-cradle whole-building life cycle assessment (WBLCA) for the Circular Home and a functionally equivalent Baseline Home constructed with traditional materials and methods. The functional unit is 1 m 2 of gross floor area across 60 years. Revit building information models (BIM) provided material quantities and Tally LCA was utilized for impact data (inclusive of biogenic carbon sequestration), supplemented with manufacturer environmental product declarations (EPDs). The Circular Home outperforms the baseline residence in most measured impact categories, including global warming potential (GWP), producing −2.73 kgCO 2 eq/m 2 in embodied emissions, whereas the modeled baseline has an embodied GWP of 428 kgCO 2 eq/m 2 . The careful material selection and advanced building design optimizes performance, with the Circular Home containing only −0.006 times the embodied emissions and −0.02 times the operational emissions of its traditional counterpart. Finally, the unique contribution of this work is in the environmental impact comparison of a high-performance modular CLT structure that can be affordably scaled and mass produced in a U.S. market, compared to typical single family home construction.

Circularity

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION

Principles and Options for Designing Battery Energy Storage Zoning Ordinances

Deployment of battery energy storage (BESS) systems, both standalone and as part of hybrid systems paired with generation, has rapidly increased in the United States in recent years as utilities and communities have deployed storage to improve electric grid reliability and act as a cost-effective alternative to larger grid infrastructure. The modular nature of BESS technologies means systems may be built near other existing land uses, creating the potential for conflicts with neighboring landowners that can be managed and mitigated through zoning and permitting requirements established by local jurisdictions. While many cities and counties have adopted ordinances specific to BESS into their local zoning codes, these ordinances vary significantly in their requirements and level of detail. Meanwhile, many other jurisdictions, including those home to proposed or existing BESS projects, lack any specific language related to BESS in their zoning codes. Local planning and zoning officials have limited capacity and may lack the familiarity with BESS technologies needed to develop ordinances or otherwise make reasonable zoning decisions that balance safety, community impacts, and other goals. The resulting uncertainty at the local zoning level has led developers to withdraw projects in some areas and has spurred moratoria or bans on energy storage projects in others. This report intends to provide practical resources for practitioners interested in reasonable and effective local regulation of battery energy storage. It does not present a model zoning ordinance, but rather is intended to complement model ordinances developed by others by providing additional context and analysis regarding the structure of energy storage zoning ordinances and the decision points for local officials. Zoning ordinances at the city, town, and county level across the U.S. were surveyed alongside two template model ordinances to identify common elements and options for regulating the zoning and siting of BESS. Common elements identified and analyzed include definitions and general requirements, including cutoffs or tiers used to apply regulations to different system sizes and the permitted zones where jurisdictions allow BESS to be sited; visual, noise, and aesthetic requirements, including property line setbacks, fencing and visual screening, noise, and lighting requirements; and safety and planning requirements, such as site plans, decommissioning plans or funds, and requirements for access by emergency services. The report also summarizes some of the more unique regulations, including those that place additional restrictions on BESS at the local level.

25 ENERGY STORAGE

All Systems Go: Regional Collaborations for Scaling AEC Innovation: Preprint

The high and rising cost of preserving and delivering housing in the U.S. requires changes to existing practices of finance, design, and construction. Innovative methods such as industrialized construction could offer the means to address housing undersupply while reducing delivery costs, operational costs and material waste in the building industry, but they face challenges to success and to scale. Simultaneously, construction and cleantech innovators themselves face skepticism from the traditional entrepreneurial ecosystem such as incubators and accelerators while attempting to navigate systems level challenges. To respond to this need, various public and private sector stakeholders have launched initiatives to support innovative companies. These include nonprofits such as Terner Labs and Ivory Innovations offering curated programming to architecture, engineering, and construction (AEC) startups; housing developers in Minnesota and California "bundling" multiple projects together to reach economies of scale with a consistent project team; public and private sector entities developing "catalogues" of pre-approved home designs in the U.S. and Canada. This exploratory paper documents several of these emerging ecosystem-development efforts to support innovative housing approaches, characterizing them by leading stakeholder and intervention strategy based on publicly available information. The paper finds that these initiatives share similar high level goals but vary in implementation, reflecting different stakeholder priorities, regional market and policy dynamics, and housing typologies. The early stage of these efforts offer limited data for comparing actual outcomes, but the paper highlights common qualitative themes and identifies opportunities for further research and potential coordination among these efforts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI