Atlas/Centaur flight performance reserve Monte Carlo analysis AC-7
Monte Carlo method for computing Atlas/Centaur flight performance reserve
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Monte Carlo method for computing Atlas/Centaur flight performance reserve
Recently, strong evidence of liquid water under the surface of Mars and a meteorite that might contain ancient microbes have renewed interest in Mars exploration. With this renewed interest, NASA plans to send spacecraft to Mars approx. every 26 months. These future spacecraft will return higher-resolution images, make precision landings, engage in longer-ranging surface maneuvers, and even return Martian soil and rock samples to Earth. Future robotic missions and any human missions to Mars will require precise entries to ensure safe landings near science objective and pre-employed assets. Potential sources of water and other interesting geographic features are often located near hazards, such as within craters or along canyon walls. In order for more accurate landings to be made, spacecraft entering the Martian atmosphere need to use lift to actively control the entry. This active guidance results in much smaller landing footprints. Planning for these missions will depend heavily on Monte Carlo analysis. Monte Carlo trajectory simulations have been used with a high degree of success in recent planetary exploration missions. These analyses ascertain the impact of off-nominal conditions during a flight and account for uncertainty. Uncertainties generally stem from limitations in manufacturing tolerances, measurement capabilities, analysis accuracies, and environmental unknowns. Thousands of off-nominal trajectories are simulated by randomly dispersing uncertainty variables and collecting statistics on forecast variables. The dependability of Monte Carlo forecasts, however, is limited by the accuracy and completeness of the assumed uncertainties. This is because Monte Carlo analysis is a forward driven problem; beginning with the input uncertainties and proceeding to the forecasts outputs. It lacks a mechanism to affect or alter the uncertainties based on the forecast results. If the results are unacceptable, the current practice is to use an iterative, trial-and-error approach to reconcile discrepancies. Therefore, an improvement to the Monte Carlo analysis is needed that will allow the problem to be worked in reverse. In this way, the largest allowable dispersions that achieve the required mission objectives can be determined quantitatively.
This report provides an overview of the Hyper-X research vehicle Monte Carlo analysis conducted with the six-degree-of-freedom simulation. The methodology and model uncertainties used for the Monte Carlo analysis are presented as permitted. In addition, the process used to select hardware validation test cases from the Monte Carlo data is described. The preflight Monte Carlo analysis indicated that the X-43A control system was robust to the preflight uncertainties and provided the Hyper-X project an important indication that the vehicle would likely be successful in accomplishing the mission objectives. The X-43A inflight performance is compared to the preflight Monte Carlo predictions and shown to exceed the Monte Carlo bounds in several instances. Possible modeling shortfalls are presented that may account for these discrepancies. The flight control laws and guidance algorithms were robust enough as a result of the preflight Monte Carlo analysis that the unexpected in-flight performance did not have undue consequences. Modeling and Monte Carlo analysis lessons learned are presented.
This report provides an overview of the Hyper-X research vehicle Monte Carlo analysis conducted with the six-degree-of-freedom simulation. The methodology and model uncertainties used for the Monte Carlo analysis are presented as permitted. In addition, the process used to select hardware validation test cases from the Monte Carlo data is described. The preflight Monte Carlo analysis indicated that the X-43A control system was robust to the preflight uncertainties and provided the Hyper-X project an important indication that the vehicle would likely be successful in accomplishing the mission objectives. The X-43A in-flight performance is compared to the preflight Monte Carlo predictions and shown to exceed the Monte Carlo bounds in several instances. Possible modeling shortfalls are presented that may account for these discrepancies. The flight control laws and guidance algorithms were robust enough as a result of the preflight Monte Carlo analysis that the unexpected in-flight performance did not have undue consequences. Modeling and Monte Carlo analysis lessons learned are presented.
Applications of Monte Carlo analysis to tungsten resonance absorption
The present analysis uses the Monte Carlo method to solve the problem of rarefied diffusion between parallel walls. The diffusing molecules are evaporated or emitted from one of two parallel walls and diffused through another molecular species. The analysis treats the diffusing molecule as undergoing a Markov random walk and the local macroscopic properties are found as the expected value of the random variable, the random walk payoff. By biasing the transition probabilities and changing the collision payoffs the expected Markov walk payoff is retained but its variance is reduced so that the M. C. result has a much smaller error.
The problem of rarefied diffusion between parallel walls is solved using the Monte Carlo method. The diffusing molecules are evaporated or emitted from one of the two parallel walls and diffuse through another molecular species. The Monte Carlo analysis treats the diffusing molecule as undergoing a Markov random walk, and the local macroscopic properties are found as the expected value of the random variable, the random walk payoff. By biasing the transition probabilities and changing the collision payoffs, the expected Markov walk payoff is retained but its variance is reduced so that the Monte Carlo result has a much smaller error.
Monte Carlo statistical analysis of spacecraft structural loads at lift-off
A concise stratospheric model was used in a Monte-Carlo analysis of the propagation of reaction rate uncertainties through the calculation of an ozone perturbation due to the addition of chlorine. Two thousand Monte-Carlo cases were run with 55 reaction rates being varied. Excellent convergence was obtained in the output distributions because the model is sensitive to the uncertainties in only about 10 reactions. For a 1 ppby chlorine perturbation added to a 1.5 ppby chlorine background, the resultant 1 sigma uncertainty on the ozone perturbation is a factor of 1.69 on the high side and 1.80 on the low side. The corresponding 2 sigma factors are 2.86 and 3.23. Results are also given for the uncertainties, due to reaction rates, in the ambient concentrations of stratospheric species.
A previous (Moss and Giuli, 1971) Monte Carlo analysis of the solar-wind modulation of galactic cosmic-ray rigidity spectra is extended to include particles in the C-N-O group. A solar cavity 'radius' of 7 AU is found to be consistent with observations of the C-N-O component at solar maximum. The variation in modulation between solar maximum and solar minimum may be explained solely by variation of the solar cavity size, with no change in the scattering mean free path.
The Transiting Exoplanet Survey Satellite (TESS) will be injected into a highly eccentric Earth orbit and fly 3.5 phasing loops followed by a lunar flyby to enter a mission orbit with lunar 2:1 resonance. Through the phasing loops and mission orbit, the trajectory is significantly affected by lunar and solar gravity. We have developed a trajectory design to achieve the mission orbit and meet mission constraints, including eclipse avoidance and a 30-year geostationary orbit avoidance requirement. A parallelized Monte Carlo simulation was performed to validate the trajectory after injecting common perturbations, including launch dispersions, orbit determination errors, and maneuver execution errors. The Monte Carlo analysis helped identify mission risks and is used in the trajectory selection process.
A comprehensive study is performed to investigate satellite debris impact point dispersion using a combination of Monte Carlo statistical analysis and parametric methods. The Monte Carlo technique accounts for nonlinearities in the entry point dispersion, which is represented by a covariance matrix of position and velocity errors. Because downrange distance of impact is a monotonic function of debris ballistic coefficient, a parametric method is useful for determining dispersion boundaries. The scheme is applied in the present analysis to estimate the Skylab footprint dispersions for a controlled reentry. A significant increase in the footprint dispersion is noticed for satellite breakup above a 200,000-ft altitude. A general discussion of the method used for analysis is presented together with some typical results obtained for the Skylab deboost mission, which was designed before NASA abandoned plans for a Skylab controlled reentry.
A method is presented for executing a direct simulation Monte Carlo (DSMC) analysis using parallel processing. The method is based on using domain decomposition to distribute the work load among multiple processors, and the DSMC analysis is performed completely in parallel. Message passing is used to transfer molecules between processors and to provide the synchronization necessary for the correct physical simulation. Benchmark problems are described for testing the method and results are presented which demonstrate the performance on two commercially available multicomputers. The results show that reasonable parallel speedup and efficiency can be obtained if the problem is properly sized to the number of processors. It is projected that with a massively parallel system, performance exceeding that of current supercomputers is possible.
An output error estimation algorithm was used to evaluate the effects of both static and dynamic instrumentation errors on the estimation of aircraft stability and control parameters. A Monte Carlo analysis, using simulated cruise flight data, was performed for a high performance military aircraft, a large commercial transport, and a small general-aviation aircraft. The effects of variations in the information content of the flight data, resulting from two different choices of control input maneuvers, were also determined. The results indicate that unmodeled instrumentation errors can cause inaccuracies in the estimated parameters which are comparable to their nominal values. Control input errors and angular accelerometer lags were found to be most significant of the instrumentation errors evaluated, and the perturbations they produce are much larger than those arising from the combined effects of static errors and white noise in the output response measurements.
This paper presents the results of statistical analyses performed to predict the thrust imbalance between two solid rocket motor boosters to be used on the Space Launch System (SLS) vehicle. Two legacy internal ballistics codes developed for the Space Shuttle program were coupled with a Monte Carlo analysis code to determine a thrust imbalance envelope for the SLS vehicle based on the performance of 1000 motor pairs. Thirty three variables which could impact the performance of the motors during the ignition transient and thirty eight variables which could impact the performance of the motors during steady state operation of the motor were identified and treated as statistical variables for the analyses. The effects of motor to motor variation as well as variations between motors of a single pair were included in the analyses. The statistical variations of the variables were defined based on data provided by NASA's Marshall Space Flight Center for the upgraded five segment booster and from the Space Shuttle booster when appropriate. The results obtained for the statistical envelope are compared with the design specification thrust imbalance limits for the SLS launch vehicle
The Transiting Exoplanet Survey Satellite (TESS) will be injected into a highly eccentric Earth orbit and fly 3.5 phasing loops followed by a lunar flyby to enter a mission orbit with lunar 2:1 resonance. Through the phasing loops and mission orbit, the trajectory is significantly affected by lunar and solar gravity. We have developed a trajectory design to achieve the mission orbit and meet mission constraints, including eclipse avoidance and a 30-year geostationary orbit avoidance requirement. A parallelized Monte Carlo simulation was performed to validate the trajectory after injecting common perturbations, including launch dispersions, orbit determination errors, and maneuver execution errors. The Monte Carlo analysis helped identify mission risks and is used in the trajectory selection process.
This paper presents the results of statistical analyses performed to predict the thrust imbalance between two solid rocket motor boosters to be used on the Space Launch System (SLS) vehicle. Two legacy internal ballistics codes developed for the Space Shuttle program were coupled with a Monte Carlo analysis code to determine a thrust imbalance envelope for the SLS vehicle based on the performance of 1000 motor pairs. Thirty three variables which could impact the performance of the motors during the ignition transient and thirty eight variables which could impact the performance of the motors during steady state operation of the motor were identified and treated as statistical variables for the analyses. The effects of motor to motor variation as well as variations between motors of a single pair were included in the analyses. The statistical variations of the variables were defined based on data provided by NASA's Marshall Space Flight Center for the upgraded five segment booster and from the Space Shuttle booster when appropriate. The results obtained for the statistical envelope are compared with the design specification thrust imbalance limits for the SLS launch vehicle.
Icarus is a three-dimensional, unstructured, finite-volume material response solver developed at NASA Ames Research Center and has been verified against other NASA material response tools like FIAT, which have a long history of successfully designing thermal protection system (TPS). Icarus solves a set of conservation equations for mass and energy and uses Darcy’s Law in place of momentum conservation. An ecosystem of material response tools has been built around a general-purposed Icarus library that in addition to the typical material response analysis also supports TPS sizing (1-D and multi-dimensional), uncertainty quantification, and has been successfully integrated into a multi-physics architecture built around US3D. In this paper, a brief overview of Icarus and its capabilities will be presented using an illustrative Monte Carlo analysis of the one-dimensional, in-depth material response of a representative Dragonfly trajectory.