Search NASA⌕ Search

SEARCH · Search NASA

Results for “Moon 2024”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The Flexible Lunar Architecture for Exploration (FLARE): Designed for the Artemis-3 Moon 2024 Mission and Beyond

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for 7 to 14 days and then return them safely to Earth by 2024. This meets NASA’s internal 2024 lunar landing deadline directed by President Trump (Trump, 2017) and the “5-year” goal set forth by Vice President Pence (Pence, 2019). FLARE is an alternative to NASA’s Human Landing System reference architecture from the Design Analysis Cycle (DAC) #2 (NASA, 2019b). The minimum FLARE concept uses one Space Launch System launch, one Orion, one European Service Module (ESM), and one human lander to deliver four crew to the Moon for a minimum surface duration of 7 days and return them to Earth. FLARE adds a new capability, called the SpaceTug, based upon the mature and successful United Launch Alliance “Common” Centaur Upper Stage vehicle, with modifications. In FLARE, the SpaceTug provides propulsion needed to return the Orion+ESM from the Moon to Earth. The SpaceTug also provides propulsion to deliver the human lander Descent Element (DE) and Ascent Element (AE) separately to lunar orbit. The Orion+ESM then completes a rendezvous with the mated DE+AE in lunar orbit. FLARE also offers optional phases to the Moon 2024 mission. The SpaceTug can also deliver components of the planned Gateway - including the Power and Propulsion Element and the Habitation and Logistics Outpost - to lunar orbit; however, the planned FLARE destination is a Low Lunar Frozen Polar Orbit unlike the NASA DAC2 plan for a Near Rectilinear Halo Orbit. FLARE also provides an option to deliver precursor equipment - including a habitation module, crew mobility devices and an In-Situ Resource Utilization demonstration - to the lunar surface for enhanced crew exploration and science with the extended 14-day surface mission.

Commercial Launch Vehicles (CLV)↗

NASA’s Artemis Human Landing Systems: Enabling Lunar Exploration

On March 26, 2019, in keeping with Space Policy Directive-1, NASA was charged with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by 2028. NASA’s Human Landing System (HLS) Program is responsible for the transportation in deep space to carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. On April 30, 2020, NASA announced the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement: A Blue Origin-led team including Lockheed Martin, Northrup Grumman, and Draper; Dynetics (a Leidos company); and SpaceX. The companies began work in a multi-month base period during which NASA teams will work with the companies to streamline requirements, to establish standards and methods, to review required products and to share the NASA’s expertise in human spaceflight systems development. Following the base period, which ends in the spring of 2021, NASA will determine which company or companies will develop Artemis human landing systems for the initial demonstration missions, including the goal of landing on the Moon in 2024.This paper examines how the Human Landing System program is at the center of NASA’s Artemis lunar exploration program, designed to yield groundbreaking science, develop and utilize lunar surface resources and leverage the Moon as a proving ground for future Mars missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability.

Lisa Watson-Morgan↗

NASA’s Initial and Sustained Artemis Human Landing Systems

On March 26, 2019, in keeping with President Trump’s Space Policy Directive-1, Vice President Pence charged NASA with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by 2028. NASA’s Human Landing System (HLS) Program is responsible for the final mode of transportation in deep space that will carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. This paper examines the approach for Artemis human landing systems for both the initial missions and future sustained missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability. The two approaches, however, are not mutually exclusive, as demonstrated by the HLS prime contractors’ integrated lander system proposals. On April 30, 2020, NASA announced that Blue Origin of Kent, Washington, Dynetics (a Leidos company) of Huntsville, Alabama, and SpaceX of Hawthorne, California, were the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement. The companies began work in a 10-month base period during which NASA teams worked with the companies to streamline the review of required products and to share the agency’s expertise in human spaceflight systems development. Following the base period, NASA will determine which company or companies will develop the human landers for the initial missions, including the 2024 landing, and which companies will develop landers for future sustained missions toward the end of the decade.

HLS↗

NASA's Initial and Sustained Artemis Human Landing Systems

On March 26, 2019, in keeping with President Trump’s Space Policy Directive-1, Vice President Pence charged NASA with landing the first woman and the next man on the South Pole of the Moon by 2024, followed by a sustained presence on and around the Moon by2028. NASA’s Human Landing System (HLS) Program is responsible for the final mode of transportation in deep space that will carry humans to and from the surface of the Moon, to be designed and developed by American companies for NASA’s Artemis lunar exploration program. This paper examines the approach for Artemis human landing systems for both the initial missions and future sustained missions. While achieving the 2024 goal requires a focus on speed and the use of mature technologies, planning toward sustained operations to and from the lunar surface requires a focus on reliability and reusability. The two approaches, however, are not mutually exclusive, as demonstrated by the HLS prime contractors’ integrated lander system proposals. On April 30, 2020, NASA announced that Blue Origin of Kent, Washington, Dynetics (a Leidos company) of Huntsville, Alabama, and SpaceX of Hawthorne, California, were the awardees for NASA’s Human Landing System contracts under Appendix H of the NextSTEP-2 Broad Agency Announcement. The companies began work in a 10-month base period during which NASA teams worked with the companies to streamline the review of required products and to share the agency’s expertise in human spaceflight systems development. Following the base period, NASA will determine which companies will develop the human landers for the initial missions, including the 2024 landing, and which companies will develop landers for future sustained missions toward the end of the decade.

Lisa Watson-Morgan↗

Space Communications in Support of the Artemis Program

NASA has been challenged to send the first woman and first person of color to the South Pole of the moon by 2024. Named the Artemis Program, this effort serves as a proving ground for the greater Moon-to-Mars campaign and establishes a lunar outpost by 2028. The Artemis Program relies on simultaneous operation of multiple flight assets separated by large angular distances that require a unique communication strategy and is a departure from the previous Apollo-era architecture. NASA’s Space Communications and Navigation (SCaN) Program is designing a scalable, extensible, and reusable network architecture to provide communication and navigation services in support of lunar exploration. This architecture serves at the foundational infrastructure, paving the way for future exploration of Mars. In pursuance of this new architecture, the SCaN Program is augmenting NASA’s space communications networks by upgrading the current 34-meter beam waveguide antenna systems and incorporating an 18-meter class subnet. This paper presents an overview of NASA’s plans to provide high data rate communication and navigation services for lunar exploration efforts including: operations concepts to support the lunar communications architecture, major network enhancements and new capabilities, and a Mars-forward approach that maximizes the reuse of these capabilities. Capabilities include:(1) Delay/Disruption Tolerant Networking (DTN), (2) Multiple Spacecraft Per Aperture (MSPA, also known as Multiple Spacecraft Per Antenna), and (3) Simultaneous Ka-band uplink and downlink. The mid-2020s era is a historic opportunity to advance NASA’s space communications infrastructure as humans return to the moon and continue to interplanetary exploration, starting with Mars. The space communication infrastructure is a lifeline that supports these endeavors, furthering humankinds’ exploration and understanding of the universe.

Philip A Baldwin↗

The Application of Advanced Electric Propulsion on the NASA Power and Propulsion Element (PPE)

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon by 2024. To meet this challenge, NASA's Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA's Power and Propulsion Element (PPE), the first planned element of NASA's cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to demonstrate a 2,500 kg xenon capacity, 50 kW-class SEP spacecraft that meets Gateway's needs, aligns with industry's heritage spacecraft buses, and allows extensibility for NASA's Mars exploration goals. Maxar's PPE concept design, is based directly on their high heritage, modular, highly reliable 1300-series bus architecture. The electric propulsion system features two 13 kW Advanced Electric Propulsion (AEPS) strings from Aerojet Rocketdyne and a Maxar-developed system comprised of four Busek 6 kW Hall-effect thrusters mounted in pairs on large range of motion pointing arms with four 6 kW-class, SPT-140-based PPUs. NASA is continuing to develop the 13 kW AEPS system through a contract with Aerojet Rocketdyne. In addition to the flight demonstration of an advanced electric propulsion system on PPE, a government-furnished plasma diagnostics package is planned to assess on-orbit performance characteristics and vehicle interactions. The paper will present overviews of NASA's Gateway and the PPE Project, the Maxar ion propulsion subsystem, the status of the two electric propulsion system developments, and the implementation of the plasma diagnostics package on the Maxar PPE spacecraft. The project is currently heading into SRR, with the propulsion build scheduled for 2021, and launch in 2022.

Herman, Daniel A.↗

Mass Spectrometer Observing Lunar Operations (MSoLo)

Introduction: In 2019, the National Aeronautics and Space Administration (NASA) announced that it would seek to have humans return to the moon by 2024 in the hopes of establishing a more sustainable lunar presence by 2028. This goal comes with many challenges, one of upmost importance will be to utilize resources that can be found on the moon. Water, which has been identified in the lunar Polar Regions, will be a key resource for in-situ resource utilization (ISRU), as it is capable of being processed for vehicular fuel, as well as life support systems materials such as oxygen. Upcoming Commercial Lunar Payload Services (CLPS) missions will be critical for these resource assessments. Methods: A modified commercial off-the-shelf (COTS) mass spectrometer developed at Kennedy Space Center known as MSolo, consisting of a quadrupole mass filter and space rated electronics undergoes testing and modifications in order to study operational parameters to unconventional approaches needed in flight situations. In general, MSolo operates in the 0-100 m/z range with the ability to detect with a faraday cup (FC) or an electron multiplier (EM) for enhanced detection. A crossbeam (XB) ionization source is used. Preliminary Data: Prior to construction, little information was available on how the MSolo system would perform at lunar like environments, factors such as temperatures (possible fluctuations from 70 to -45 °C), vibrations from launch and their side effects, the general ability to operate while the entire system (hardware and electronic components) were in a vacuum environment, were factors that while know to flight instruments, were something new to a modified COTS system. As components start to warm up, temperature becomes a key factor (ie. heat can no longer escape the electronics as no atmosphere is present), therefore it becomes crucial to find new ways to maintain stable signals and keep the instrument tuned. Calibration itself becomes an important parameter that needs to be performed while maintaining all flight like characteristics. Even the structure itself of MSolo’s sensor needed to be changed to survive the verification parameters needed to be approved for flight. Most important, all the modifications made to the COTS system have to keep the instrument working at the same specifications of the standard commercial systems. Novel Aspect: Results gathered provide key parameters that will assist to the unconventional mass spectrometry approaches of the upcoming CLPS missions to which MSolo has been selected to.

MSolo↗

Space Communications and Navigation

Presentation for public Getting to Know Goddard and our role in Artemis event. As part of the Artemis program, NASA will use innovative new technologies and systems to explore more of the Moon than ever before. Ahead of a human return, the agency will send dozens of new science investigations and technology experiments to the Moon beginning in 2021. NASA will land the first woman and next man on the Moon in 2024 and establish sustainable lunar exploration by the end of the decade. At NASA’s Goddard Space Flight Center, we’re leveraging our expertise across multiple areas and facilities to support the Artemis initiative, including sending instruments to the Moon through the agency’s Commercial Lunar Payload Services initiative. Along with commercial and international partners, NASA will establish a sustainable presence on the Moon in preparation to take humanity’s next giant leap – sending astronauts to Mars.

commercialization↗

NASA's Space Launch System Begins Moving To The Launch Site

NASA is accelerating plans for a human return to the Moon. NASA was directed by the White House in 2019 to land the first woman and next man on the Moon by 2024. NASA’s backbone for future deep space exploration is the Space Launch System (SLS), as well as the Orion crew spacecraft, Gateway outpost, and Human Landing System as part of the Artemis program. While the SLS upper stage, the Interim Cryogenic Propulsion Stage (ICPS), based on an existing commercial stage was shipped to Kennedy Space Center (KSC) in 2017, major completed components of SLS will soon begin their eastward journey that will see them at KSC in 2020 to be integrated for their history-making launch back to the Moon. Core Stage prime contractor Boeing completed the Artemis I core stage in 2019 at NASA’s Michoud Assembly Facility (MAF) and shipped it to NASA Stennis Space Center (SSC) for stage green run testing in 2020 and then to KSC. Northrop Grumman, prime contractor for the 5-segment solid rocket boosters, is scheduled to begin overland shipment of the Artemis I motor segments from Utah to KSC in 2020 to await integration. This paper will discuss SLS progress to date and planned 2020 milestones.

Bruce R Askins↗

NASA's Human Lunar Landing Strategy

In early 2020, NASA's Human Landing System Program made awards to a set of American companies to compete for the design, delivery and demonstration of an integrated human landing system to land the next Americans near the South Pole of the Moon by 2024. Awards were made utilizing the NextSTEP Broad Agency Announcement procurement mechanism and kicked off a seven-month Certification Baseline Review, leading up to a Continuation Review and possible down-select by NASA at the end of 2020. This paper discusses the work that has been done thus far for the rapid development of a human landing system to safely carry the first woman and the next man to the lunar surface. It will also provide a preview of the work that remains ahead for the program. Keywords: Artemis, Human Landing System, Mars, Moon, Propulsion

Lisa Watson-Morgan↗

Analytical Techniques for Assessing Gateway and Other Spacecraft Antenna Line-of-Sight

NASA’s Artemis program is committed to landing the next man and the first woman on the Moon by 2024. A critical piece of infrastructure for the mission, the Gateway will inaugurate a sustainable crewed presence beyond low-Earth orbit in cis-lunar space and serve as a staging point for a lunar landing system. The Near Rectilinear Halo Orbit of the Gateway offers numerous operational benefits in terms of its Earth access via the Orion Multipurpose Crew Vehicle, the degree of lunar visibility and surface access it provides, and favorable conditions for station-keeping. To minimize burns during station-keeping and conserve propellant, the Gateway will continually align itself to a solar pressure equilibrium attitude with the Sun; this is convenient for solar array orientation and power generation, but causes difficulties in terms of communication line-of-sight with the Earth, Moon, and visiting vehicles, which appear to be continually rotating about the Gateway’s local frame. A fixed antenna on the Gateway is continually subject to a moving target and can find itself obstructed by the Gateway’s own geometry frequently if not placed carefully. To understand the performance of either Earth-pointing or Moon-pointing antenna placements for a given Gateway geometry, a transient solar system simulation of the Gateway is used to step through orbital ephemeris data and determine the periods in which line-of-sight to a chosen target is achieved and lost. Antenna placements can be tested in the simulation and optimized to increase the average line-of-sight exposure to the target, while also minimizing the maximum duration cut-out in line-of-sight communication experienced; long durations without a successful communication link could pose threats to operations, safety, and mission success. It may be necessary to deviate from the Gateway’s solar pressure equilibrium attitude for short periods of time in order to continue a successful line-of-sight link to a chosen target. Communication coverage spheres can offer insight into what these necessary attitude adjustments may be and are generated by using a 3D mesh of the Gateway and an implementation of the Möller-Trumbore intersection algorithm. This paper outlines the analytical techniques used to perform such antenna placements on the Gateway, offering examples of how line-of-sight strength can be enhanced with an understanding of the Gateway geometry and attitude constraints. These techniques have had direct impact on the writing of communication requirements for NASA and international partner-owned Gateway elements.

Kennedy, William J.↗

Analytical Techniques for Assessing Gateway and Other Spacecraft Antenna Line-of-Sight

NASA’s Artemis program is committed to landing the next man and the first woman on the Moon by 2024. A critical piece of infrastructure for the mission, the Gateway will inaugurate a sustainable crewed presence beyond low-Earth orbit in cis-lunar space and serve as a staging point for a lunar landing system. The Near Rectilinear Halo Orbit of the Gateway offers numerous operational benefits in terms of its Earth access via the Orion Multipurpose Crew Vehicle, the degree of lunar visibility and surface access it provides, and favorable conditions for station-keeping. To minimize burns during station-keeping and conserve propellant, the Gateway will continually align itself to a solar pressure equilibrium attitude with the Sun; this is convenient for solar array orientation and power generation, but causes difficulties in terms of communication line-of-sight with the Earth, Moon, and visiting vehicles, which appear to be continually rotating about the Gateway’s local frame. A fixed antenna on the Gateway is continually subject to a moving target and can find itself obstructed by the Gateway’s own geometry frequently if not placed carefully. To understand the performance of either Earth-pointing or Moon-pointing antenna placements for a given Gateway geometry, a transient solar system simulation of the Gateway is used to step through orbital ephemeris data and determine the periods in which line-of-sight to a chosen target is achieved and lost. Antenna placements can be tested in the simulation and optimized to increase the average line-of-sight exposure to the target, while also minimizing the maximum duration cut-out in line-of-sight communication experienced; long durations without a successful communication link could pose threats to operations, safety, and mission success. It may be necessary to deviate from the Gateway’s solar pressure equilibrium attitude for short periods of time in order to continue a successful line-of-sight link to a chosen target. Communication coverage spheres can offer insight into what these necessary attitude adjustments may be and are generated by using a 3D mesh of the Gateway and an implementation of the Möller-Trumbore intersection algorithm. This paper outlines the analytical techniques used to perform such antenna placements on the Gateway, offering examples of how line-of-sight strength can be enhanced with an understanding of the Gateway geometry and attitude constraints. These techniques have had direct impact on the writing of communication requirements for NASA and international partner-owned Gateway elements.

Kennedy, William J.↗

2020 International Astronautical Congress Conference Presentation - ANALYTICAL TECHNIQUES FOR ASSESSING GATEWAY AND OTHER SPACECRAFT ANTENNA LINE-OF-SIGHT FOR THE ARTEMIS PROGRAM

NASA’s Artemis program is committed to landing the next man and the first woman on the Moon by 2024. The Gateway, a critical piece of infrastructure for the long-term Artemis mission profiles, will inaugurate a sustainable crewed presence beyond low-Earth orbit in cis-lunar space and serve as a staging point for a lunar landing system. The Near Rectilinear Halo Orbit of the Gateway offers numerous operational benefits in terms of its Earth access via the Orion Multipurpose Crew Vehicle, its degree of Earth and lunar visibility, the versatile surface access it provides, and favorable conditions for station-keeping. To minimize burns during station-keeping and conserve propellant, the Gateway will continually align itself to a solar pressure equilibrium attitude with the Sun; this is convenient for solar array orientation and power generation, but causes difficulties in terms of communication line-of-sight with the Earth, Moon, and visiting vehicles, which appear to be continually rotating about the Gateway’s local frame. A fixed antenna on the Gateway is continually subject to a moving target and can find itself obstructed by the Gateway’s own geometry frequently if not placed carefully. To understand the performance of either Earth-pointing or Moon-pointing antenna placements for a given Gateway geometry, a transient solar system simulation of the Gateway is used to step through orbital ephemeris data and determine the periods in which line-of-sight to a chosen target is achieved and lost. Antenna placements can be tested in the simulation and optimized to increase the average line-of-sight exposure to the target, while also minimizing the maximum duration drop-out in line-of-sight communication experienced; long durations without a successful communication link could pose threats to operations, safety, and mission success. It may be necessary to deviate from the Gateway’s solar pressure equilibrium attitude for short periods of time in order to continue a successful line-of-sight link to a chosen target. Communication coverage spheres can offer insight into what these necessary attitude adjustments may be and are generated by using a 3D mesh of the Gateway and an implementation of the Möller-Trumbore intersection algorithm. This paper outlines the analytical techniques used to perform such antenna placements on the Gateway, offering examples of how line-of-sight strength can be enhanced with an understanding of the Gateway geometry and attitude constraints. These techniques have had direct impact on the writing of communication requirements for NASA and international partner-owned Gateway elements.

Gateway↗

Higher Power Design Concepts for NASA's Kilopower Reactor

The successful testing of the Kilopower reactor during the KRUSTY (Kilopower Reactor Using Stirling TechnologY) experiment significantly reduced the risk to fly fission power systems by demonstrating stable reactor operation through nominal and severe simulated mission scenarios. The experiment validated the neutronics, heat transfer, and power conversion systems needed for 1 kilowatt of electrical power production from the Kilopower reactor. The need for higher power reactors to support human exploration missions to the moon and Mars has become increasingly important due to the urgency to put boots on the moon by 2024 and have a sustainable presence in the following years. This desire has prompted NASA to continue the development of the Kilopower reactor to extend the power up to 10 kilowatts of electricity in support of a lunar base. These 10 kilowatt units are expected to be used as standalone units or be ganged together to create a modular power grid for propellent production, human habitats, and robotic exploration to name a few. The Kilopower reactor was originally designed to produce electrical power from 1 to 10 kilowatts using the same highly enriched uranium fuel, sodium heat pipes, and Stirling convertors at the proper scale. Consideration has also been given to the use of low enriched uranium fuel for these missions and will be studied along with the other aspects of the reactor. This paper will focus on the design concepts and trades associated with the scale up of the Kilopower power conversion system and heat transfer system to support human exploration of the moon and Mars.

Gibson, Marc↗

Lunar Mega Project: Processes, Work Flow and Terminology of the Terrestrial Construction Industry versus the Space Industry

Recent developments around the world show an increased interest and international activity toward developing a lunar surface human and robotic presence with a long term, sustainable vision. In Europe, the construction of a "Moon Village" has been proposed, and China has stated its intention to build a research station with a crew at the lunar South Pole. Russia stated it will land cosmonauts on the Moon in the 2030's. India has sent an orbiter, a robotic lander, and rover to the Moon. The USA intends to land the first woman and a man on the Moon by 2024 to initiate a sustained human lunar presence.A lunar research station with associated commercial activities will require infrastructure to become a permanent capability. Landing and launch pads, propellant storage and distribution farms, spacecraft access and handling structures, cranes, blast protection berms or walls, roads, graded areas, dust stabilized areas, foundations, parking lots, radiation shelters, micro-meteorite protection hangars, habitats and other human shelters, greenhouse farms, utility trenches, power plants, industrial water and oxygen extraction plants, communications antenna towers, thermal protection, mining zones, crater access and sub-surface access will be required to create a safe and sustainable lunar operations capability. This infrastructure will require significant construction activities in an extreme environment, with risky and expensive operations. On Earth, there are similar large and expensive projects (>$1 Billion) in difficult locations that attract a lot of public attention. These are known as "Mega Projects" and examples include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems. Large consortiums consisting of public and private entities typically implement these infrastructure Mega-Projects.This paper will compare the typical design process, project management process, and work flow in the terrestrial construction industry to the space industry in order to create a better understanding between the terrestrial construction industry and the space industry, to further enable collaboration on a lunar Mega Project to build infrastructure on the Moon. In addition, a glossary of respective industry terminology with annotated linkages and definitions has been compiled. This information will enable contracts and business practices to be formulated for generating requests for proposals (RFP) by governments to consortiums consisting of construction and space industry companies that will bid on Lunar Infrastructure Projects that could lead to contracts to build the permanent capabilities.

Robert P Mueller↗

Development of Lunar Highland REgolith Simulants, NU-LHT-1M,-2M

As part of a collaborative agreement between the U.S, Geological Survey (USGS) and NASA's Marshall Space Flight Center (MSFC) lunar highland simulants are being produced to support engineers and scientists in developing the technologies required to put a base on the moon by 2024. Two simulants have been produced to date: NU-LHT-1M and -2M (NASA/USGS-Lunar Highlands Type-l & 2 Medium-grained). Using starting material chiefly collected from the Stillwater Mine, Nye, MT, blending protocols were developed based on normative mineralogy calculated from average chemistry, for the Apollo 16 regolith. New technologies using a high temperature remotely coupled plasma melter were developed to generate both high quality and agglutinitic glasses that simulate the glassy components of the regolith. Detailed chemical, mineralogical and physical properties analysis of NU-LHT-1M indicate that it is overall a good surrogate for highlands lunar regolith (our new simulant LHT-2M has not be analyzed yet). The primary difference between 1M and 2M was the inclusion of trace mineralogy (phosphates and sulfide). Plans will also be presented on the future direction of the simulant project.

Stoeser, D. B.↗

Biological CubeSats: What Have We Learned so Far and What Is Next?

Since Apollo 17 in 1972, NASA has sent no humans or other biological organisms outside of Earth's protective magnetosphere. Recently, NASA has set its sights on human exploration in deep space, with an ambitous plan to put astronauts back on the Moon by 2024 and to eventually land human missions on Mars. Such missions will require significant countermeasures, likely both technological and biomedical, to protect biology from chronic radiation exposure. CubeSats can inform these countermeasures by querying relevant space environments with model organisms.NASA has launched five biological CubeSat missions into low-Earth orbit (LEO). GeneSat-1 was launched in 2006 to study gene expression and increase our knowledge of how spaceflight affects microbes. Similar life-support technologies were then used in PharmaSat and O/OREOS, which launched in 2009 and 2010, respectively. PharmaSat contained optical systems to examine how yeast cells responded to an antifungal treatment. One of O/OREOS payloads, SESLO (Space Environment Survivability of Living Organisms), housed dormant microorganisms, which were rehydrated on orbit to track alterations to growth and metabolism induced by microgravity and radiation. In 2014, NASA launched SporeSat to study the mechanisms of plant cell gravity sensing using lab-on-a-chip devices. Most recently, in 2017, NASA launched EcAMSat (E. coli AntiMicrobial Satellite), which investigated the effects of microgravity on antibiotic resistance of a pathogenic bacterium. Each one of these missions increased our understanding of the biological effects of spaceflight in LEO, while refining technologies and imparting valuable lessons to the next generation of CubeSats.CubeSats housing translational biological models are therefore ideal for defining the hazards of deep space travel, as they can provide critical data over relevant durations. BioSentinel, a next-generation deep-space CubeSat, is planned to launch as a secondary payload on Artemis 1 in 2020. BioSentinel will study the DNA damage response to deep space radiation in yeast.

Santa Maria, Sergio R.↗