Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mount Desert Island”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Optimally sited microgrids for energy resilience in Mount Desert Island, ME

Mount Desert Island (MDI) (≈110 sq mi; ≈10,000 year‑round residents) is located on the eastern coast of Maine. Acadia National Park is located on the island, protecting 47,000+ acres of land which draws millions of visitors annually. The island is divided into four towns (Tremont, Southwest Harbor, Mount Desert, Bar Harbor). The island’s distribution system is supplied by a single 35‑kV mainland feeder and a mix of aging distribution components; outage exposure is not uniform across the island. Residents fear that outage events are starting to exceed resilience expectations. MDI community leaders asked Sandia National Laboratories to characterize energy system vulnerability and to develop conceptual microgrid solutions that improve community resilience while also producing co‑benefits for reliability, access, and sustainable development.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technical Assistance for Mount Desert Island, Maine

Mount Desert Island, Maine, worked with researchers in the Energy Technology Innovation Partnership Project (ETIPP) to evaluate microgrid siting and sizing to assess how this technology could measurably improve critical service reliability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Mineralogy of the Bagnold Dune Field in Gale Crater to Interpret Eolian Sediment Sorting on the Martian Surface

The Mars Science Laboratory Curiosity rover landed in Gale crater in August 2012 to characterize modern and ancient surface environments. Curiosity executed a two-phase campaign to study the morphology, activity, physical properties, and chemical and mineralogical composition of the Bagnold Dune Field, an active eolian dune field on the lower slopes of Aeolis Mons (Mount Sharp). Detectable aspects of dune sand mineralogy have been examined from orbit with the visible/short-wave infrared spectrometer CRISMand the thermal-infrared spectrometers THEMIS and TES. CRISM data demonstrate variations in plagioclase, pyroxene, and olivine abundances across the dune field. Curiosity analyzed sediments from two locations in the dune field to evaluate the causes of the mineralogical differences observed from orbit. The Gobabeb sample was collected from Namib Dune, a barchanoidal dune on the upwind margin of the dune field, and the Ogunquit Beach sample was collected from the Mount Desert Island sand patch located downwind from Namib. These samples were sieved to <150 μm and delivered to the CheMin X-ray diffraction instrument for quantitative mineralogical analysis. CRISM-derived mineralogy of the Namib Dune and Mount Desert Island and CheMin-derived mineralogy of the Gobabeb and Ogunquit Beach samples can be used in a value-added manner to interpret grain segregation at the bedform to dune-field scale and evaluate contributions from local sediment sources. Models of CRISM data demonstrate that Mount Desert Island is more enriched in olivine and less enriched in plagioclase than Namib dune, suggesting that fine-grained mafic sediments are preferentially mobilized downwind. Curiosity data indicate olivine also forms a coarse lag on the lee sides of barchanoidal dunes. Minor abundances of hematite, quartz, and anhydrite and small differences in the crystal chemistry of plagioclase and pyroxene derived from CheMin data suggest that sediments from the underlying lacustrine rocks also contribute to the Bagnold sands.

Rampe, E. B.↗

Jarosite in Gale Crater, Mars: The Importance of Temporal and Spatial Variability and Implications for Habitiability

The Curiosity rover has recently found evidence for small amounts of jarosite, a ferric sulfate, in the Pahrump Hills region at the base of Aeolis Mons (Mount Sharp), Gale crater. While jarosite has been described previously at other locations on Mars, including several sites at Meridiani Planum (explored by the Opportunity rover; and Mawrth Vallis (by remote MRO-CRISM observations; this is the first identification in Gale. Jarosite is interpreted to be a mineral indicator of acidic conditions (pH less than 4; on Earth, it is most commonly found in acid rock-drainage or acid sulfate soil environments. However, jarosite has also been described from a number of terrestrial environments where widespread acidic conditions are not prevalent. As a case study, we describe here an occurrence of sedimentary pyrite nodules that have been variably oxidized in situ to gypsum, schwertmannite, K-/Na-jarosite and iron oxides in a polar desert environment on Devon Island, Nunavut, Canada. Remarkably, these nodules occur in loosely consolidated carbonate sediments, which would have required a higher pH environment at their time of formation and deposition. Thus, acidic conditions may only exist at a small (sub-cm) scale or in a restricted temporal window in an otherwise well-buffered environment. On Devon Island, the jarosite occurs in the most oxidized nodules and is never associated directly with pyrite. Schwertmannite, a metastable iron oxyhydroxysulfate that can form at pH higher than that required for jarosite, occurs in association with partially oxidized pyrite. The paragenetic sequence observed here suggests initial formation of schwertmannite and late-stage precipitation of jarosite in restricted micro-environments, possibly forming via transformation of an amorphous schwertmannite-like phase. While the carbonate environment on Devon Island differs significantly from that of Gale crater, i.e., where we find predominantly basaltic sedimentary rocks, this terrestrial analog provides insight into the significance of jarosite with respect to habitability. For example, the variable abundance of jarosite on Mars and possibly in Gale crater points to potentially localized conditions favorable for jarosite formation. Interestingly, small amounts of sulfide minerals have also been detected by Curiosity at Yellowknife Bay; oxidation of sulfide minerals at Pahrump could explain the presence of small amounts of jarosite. The iron-rich rocks at Pahrump may also represent relatively altered basaltic sediments, or they could be sediments that were altered further by a fluid with a distinct, possibly more acidic, composition. In addition, the abundance of iron-rich amorphous material in Gale rocks allows for the possibility that pre-cursor, iron-bearing phases transform to jarosite post-depositionally. Thus, the occurrence of jarosite at Pahrump could reflect changing paleoenvironmental conditions, though continuing study of its context and textural relationships should provide a fuller understanding of the significance of this mineral to past fluid compositions and past habitability at Gale crater.

Leveille, R. J.↗

TRIDENT Drill Validation at Mars and Lunar Analog Field Sites

Drilling on Earth is typically a human-intensive activity. Drilling on other planets is further complicated by the lack of prior local field surveys of their target area, hence blindly drilling into uncertain target rocks. Field conditions on the Moon or Mars are also different than for shallow drilling on Earth: lower temperatures and pressures, less power available, low masses (hence less weight-on-bit). Given the cost of transport from Earth, no drilling muds or working fluids are likely to be available to carry away cuttings. And impact-gardened regolith and dust vary mechanically and texturally from most terrestrial soils. The Regolith and Ice Drill for Exploration of New Terrains (TRIDENT) is a rotary-percussive 1m-class drill from Honeybee Robotics. It is low-power (rotary and percussive actuators are 200 W each) and lightweight (<20 kg) with the maximum weight on bit limited to 200 N. TRIDENT has been manifested for the Volatiles Investigating Polar Exploration Rover (VIPER) and PRIME-1 lunar south pole missions in 2024, has previously been field tested at a hot, dry analog site in the Atacama Desert, and in lunar conditions in thermal vacuum chamber tests. TRIDENT was also part of the 2019 Icebreaker Mars Discovery proposal, as well as in the Mars Life Explorer concept. During ARADS tests, drill control and fault recovery automation software enabled hands-off operations of a rover-mounted TRIDENT drill. TRIDENT Drill Analog Site Validation: Past TRIDENT tests in thermal vacuum (TVAC) chambers targeted containers of manufactured lunar simulants with added volatiles. 2022 TRIDENT ambient testing at NASA Ames drilled into cemented lunar simulant materials. Low cuttings-permeability led to cuttings buildup, and drill choking and binding was observed. The Atacama analog site in ARADS had desiccated unconsolidated sediments that did not challenge the TRIDENT design. However, lunar polar regolith is expected to be diverse and heterogeneous with varying clast sizes, with abundant impactites and perhaps subsurface ice deposits. Neither the simulants nor Atacama testing had completely covered the TRIDENT-targeted field characteristics, motivating further analog tests prior to the planned lunar missions. To gain more insight into the behavior of the TRIDENT hardware in diverse impactites and subsurface ice, and to verify the software automation in that environment, in August 2023 TRIDENT was brought to Haughton Crater, a field analog site in the Canadian Arctic. In September 2023 the same drill was brought to the Bishop Tuff in southern California to verify whether drilling binding behaviors previously seen in lunar simulant testing would be observed in naturally occurring fine-grained massive layers. The ~22 Ma Haughton Crater impact structure is located at 75 ̊22’ N, 89 ̊41’ W, on northwestern Devon Island, Nunavut, Canada. Numerous deposits of pale-grey crater-fill polymictic impact-melt breccia are found within the crater with a typical thickness reaching ~125 m or greater and covering ~60 km -2 . An approximately 600m-thick permafrost layer is also present with ice typically found within 0.5-0.6m of the surface. The volcanic tableland north of Bishop, CA exposes densely welded tuff laid down during the eruption that created the Long Valley Caldera at approximately 0.76 Ma. Extensional faults and the Owens River gorge expose cross-sections across the plateau. The area is viewed as an analog site for Mars features believed to be of pyroclastic origin. Results: Haughton Crater.Drilling tests were conducted 8-13 August 2023 at a previously undisturbed area separated 5-10 m from past years’ Drill Hill test sites (75.4208, -089.7613). In six days, TRIDENT drilled 8 holes to nearly 1 m depth each, totaling 7.80 m. The active layer/ice boundary was at ~67 cm depth, with a total of approximately 2.4 m drilled into ice or ice-cemented impact breccia. During drilling, five drill fault states were observed and successfully recovered. Holes 23-1, 4 and 7 were drilled under manual control, using Honeybee’s Thorax user interface. Holes 23-5, 6, and 8 were drilled with the Ames IBexec automated drilling control software. TRIDENT was observed to have little difficulty in the thawed uncemented impact breccia above the active layer boundary, but required percussion to make slower headway in the ice-cemented breccia. In Hole 23-7 (Fig.1), drilling slowed down in a massive unit just above the active-layer boundary (perhaps a large rock extending into the ice-cementation?), with only 7cm progress made in 27 minutes of high auger torque and constant percussion, leading to a choking fault and then a binding fault. A similar pattern had been observed in TRIDENT Rio Tinto test data from 2017 [6] as well as in the 2022laboratory tests.Bishop Tuff.A team from NASA Ames and the US Geological Survey deployed the same TRIDENT drill to Bishop Sites 1B and 1C (37.4203, -118.4289; 37.4265, -118.4215) on 13-16 September 2023, on the Bishop Tuff plateau. A third drill site was used 17-18 September 2023(37.4598, -118.3667) in an abandoned pumice mine. Four holes (totaling 2.5m depth) were drilled into the fine-grained, meters-thick tuff units at Sites 1B and 1C, and a further two boreholes (totaling 1.98m depth) were made at the pumice site. Drill behavior in the tuff below 10 cm depth was similar to that seen at 65-74 cm depth in Haughton Hole 23-7 (Fig. 1) and that seen in the 2022 lab simulant drilling. Drill safety torque limits were exceeded multiple times resulting in drill stops downhole. These freezes then required external added torques (with a pipe wrench) to resume rotation, to unstick the drill for withdrawal. To prevent this choking and binding behavior we found that more-frequent cuttings removal was necessary, e.g., reducing the “drill bite” size from the nominal 10 cm to 2 cm per bite --bringing the auger up to the surface more frequently, as seen in Bishop Site 1C Hole 2 (Fig.2). This permitted slow progress without drill binding and without external interventions. Conversely, TRIDENT drilling in the more porous pumice target material showed no cuttings buildup issue, and single bites as large as 40 cm were demonstrated. Discussion: We observed that TRIDENT easily penetrated unconsolidated heterogeneous soils (both above the active layer boundary at Haughton and previously in the Atacama). Cemented or consolidated targets that were cuttings-permeable (icy impact breccia, pumice) required more energy applied and percussion. However, in non-cuttings-permeable targets (welded microporous tuff, cemented simulants, boulder) TRIDENT was observed to be prone to excessive cuttings accumulation leading to choking/binding faults and stalling. The wedge cutting bit, used by TRIDENT in field tests and in its flight versions, pulverizes the target rock and creates fine cuttings that ideally are transported up the auger spirals for removal. In porous, fractured or vesicular target materials (such as at the Bishop pumice site) a significant portion of the cuttings are pushed aside, but for non-fractured, microporous targets the cuttings remain in the borehole and accumulate. Rock powder is relatively incompressible as a working fluid at only 100-200N downward force (TRIDENT limits) and hence eventual drilling progress slows or stops. Our recommended strategy for improving TRIDENT cuttings removal in massive target units with low cuttings-permeability is to reduce TRIDENT bite sizes when encountering these units, from 10cm to as little as 1-2cm, to effectively bail the accumulating cuttings. This approach was demonstrated to reduce choking and allowed slow progress to continue in cuttings-impermeable microporous target units (viz. the Bishop tuff in our September 2023 tests or cemented simulants in 2022 ambient tests).

robotic drilling↗