Search NASA⌕ Search

SEARCH · Search NASA

Results for “Multi-Unit Probabilistic Risk Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Incorporating FLEX Strategies in Multi-Unit Probabilistic Risk Assessment

The catastrophic Fukushima nuclear accident reminded nuclear community about the possibilities of extreme accident scenarios, including those involving multiple reactor units on the same site. As the responses to the Fukushima accident, the nuclear power industry developed and implemented a series of strategies, including the Diverse and Flexible Coping Strategies (FLEX), to enhance the coping capacities of nuclear power plants (NPPs) under extreme accidents. This study intends to examine the impact of FLEX strategies on the risk from all the reactor units on the same NPP site, including risks from accidents involving a single unit and from accidents involving multiple units. The fundamental, methodological element of this study is Multi-Unit Probabilistic Risk Assessment (MUPRA), which requires a shift in Probabilistic Risk Assessment (PRA) from a “one-reactor-at-a-time” mindset to a “considering all reactors sharing a site as a unity” one. An integrated modeling approach for multi-unit event sequence development will be leveraged to develop MUPRA model and address the intra-unit and inter-unit dependencies. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), a PRA software developed and maintained by Idaho National Laboratory (INL) for the U.S. Nuclear Regulatory Commission (NRC), will serve as the platform for MUPRA modeling. This study selects Loss Of Offsite Power (LOOP) as a representative initiating event, which may occur on a generic two-unit NPP site and impacts both reactor units on the site. First, an MUPRA model, including multi-unit event trees, will be developed to obtain single-unit and multi-unit accident scenarios. Next, different FLEX strategies will be assumed, including FLEX equipment for a unit cannot be used for another unit, FLEX equipment for multiple units can be used in a cross-connected manner, etc. Lastly, the effectiveness of each postulated FLEX strategy will be evaluated by incorporating the corresponding FLEX equipment and deployment logic in the MUPRA model.

99 GENERAL AND MISCELLANEOUS↗

Impact of representative ground motion level on seismic PSA with the boundary between overestimation and underestimation

One commonly used approach in seismic probabilistic safety assessment (PSA) is the discrete method. This method follows the standard PSA framework and can be applied to various models, such as multi-unit models, while reducing computational costs using standard software. However, due to the inability to subdivide intervals infinitely, the discrete method approximates with a finite number of subintervals. In practice, different numbers of subintervals are applied, and the representative ground motion level is selected based on expert judgment. When employing a smaller number of subintervals, it is important to take caution to prevent underestimation. This study analyzes the impact of the representative ground motion level on seismic risk. It confirms that underestimation can occur with a small number of subintervals depending on the representative ground motion level. This study also proposes a method for determining the boundary of underestimation and overestimation. The method is demonstrated through examples, providing a mathematical foundation for selecting appropriate representative ground motion levels. By avoiding underestimation, this research helps prevent the oversight of significant risk contributors and enhances the understanding of seismic risk.

99 - GENERAL AND MISCELLANEOUS↗