Research, Development and Demonstration (RD&D) Needs for Light Water Reactor (LWR) Technologies A Report to the Reactor Technology Subcommittee of the Nuclear Energy Advisory Committee (NEAC) Office of Nuclear Energy U.S. Department of Energy

The LWR RD&D Working Group developed a detailed list of RD&D suggestions and recommendations, which are provided in Appendix D. The Working Group then undertook a systematic ranking process, described in Appendix E. The results of the ranking process are not meant to be a strict set of priorities, but rather should provide insight into how the items generally ranked within the Working Group. Future discussions and investigation into these items could provide information that would support a change in these priorities or in their emphasis. The results of this prioritization are provided below. Note that in general, many RD&D ideas are applicable to both new Advanced Light Water Reactor (ALWR) plants and currently operating plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NGNP Infrastructure Readiness Assessment: Consolidation Report

The Next Generation Nuclear Plant (NGNP) project supports the development, demonstration, and deployment of high temperature gas-cooled reactors (HTGRs). The NGNP project is being reviewed by the Nuclear Energy Advisory Council (NEAC) to provide input to the DOE, who will make a recommendation to the Secretary of Energy, whether or not to continue with Phase 2 of the NGNP project. The NEAC review will be based on, in part, the infrastructure readiness assessment, which is an assessment of industry's current ability to provide specified components for the FOAK NGNP, meet quality assurance requirements, transport components, have the necessary workforce in place, and have the necessary construction capabilities. AREVA and Westinghouse were contracted to perform independent assessments of industry's capabilities because of their experience with nuclear supply chains, which is a result of their experiences with the EPR and AP-1000 reactors. Both vendors produced infrastructure readiness assessment reports that identified key components and categorized these components into three groups based on their ability to be deployed in the FOAK plant. The NGNP project has several programs that are developing key components and capabilities. For these components, the NGNP project have provided input to properly assess the infrastructure readiness for these components.

42 ENGINEERING↗

Report of the Fuel Cycle Research and Development Subcommittee of the Nuclear Energy Advisory Committee

The Fuel Cycle (FC) Subcommittee of NEAC met February 7-8, 2012 in Washington (Drs. Hoffmann and Juzaitis were unable to attend). While the meeting was originally scheduled to occur after the submission of the President’s FY 2013 budget, the submission was delayed a week; thus, we could have no discussion on balance in the NE program. The Agenda is attached as Appendix A. The main focus of the meeting was on accident tolerant fuels, an important post Fukushima issue, and on issues related to the report of the Blue Ribbon Commission on America’s Nuclear Future (BRC) as related to the responsibility for used fuel disposal which was assigned to the FC program with the end of the Office of Civilian Radioactive Waste Management. In addition we heard an update on the systems study program which is aimed at helping chose the best options for advanced reactors, and possible new study on separation and waste form relevance to used fuel disposal (these two items are only discussed in this section of the report).

Fuel Cycle, NEAC, accident tolerance, used fuel di↗

Recommendations for NEAMS Engagement with the NRC: Preliminary Report

The vision of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program is to bring a new generation of analytic tools to the nuclear engineering community in order to facilitate students, faculty, industry and laboratory researchers in investigating advanced reactor and fuel cycle designs. Although primarily targeting at advance nuclear technologies, it is anticipated that these new capabilities will also become interesting and useful to the nuclear regulator Consequently, the NEAMS program needs to engage with the Nuclear Regulatory Commission as the software is being developed to ensure that they are familiar with and ready to respond to this novel approach when the need arises. Through discussions between key NEAMS and NRC staff members, we tentatively recommend annual briefings to the Division of Systems Analysis in the NRC's Office of Nuclear Regulatory Research. However the NEAC subcommittee review of the NEAMS program may yield recommendations that would need to be considered before finalizing this plan.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

VTR Startup Fuel Paper for NFSM

A 2017 report issued by the Department of Energy Office of Nuclear Energy’s (DOE-NE) Nuclear Energy Advisory Committee (NEAC) discussed needs and requirements for a new test reactor in the U.S. The report included a recommendation to “proceed immediately with pre-conceptual design planning activities to support a new test reactor (including cost and schedule estimates).”

99 GENERAL AND MISCELLANEOUS↗

High Temperature Gas-Cooled Reactor Projected Markets and Preliminary Economics

This paper summarizes the potential market for process heat produced by a high temperature gas-cooled reactor (HTGR), the environmental benefits reduced CO2 emissions will have on these markets, and the typical economics of projects using these applications. It gives examples of HTGR technological applications to industrial processes in the typical co-generation supply of process heat and electricity, the conversion of coal to transportation fuels and chemical process feedstock, and the production of ammonia as a feedstock for the production of ammonia derivatives, including fertilizer. It also demonstrates how uncertainties in capital costs and financial factors affect the economics of HTGR technology by analyzing the use of HTGR technology in the application of HTGR and high temperature steam electrolysis processes to produce hydrogen.

01 COAL, LIGNITE, AND PEAT↗

Basis for NGNP Reactor Design Down-Selection

The purpose of this paper is to identify the extent of technology development, design and licensing maturity anticipated to be required to credibly identify differences that could make a technical choice practical between the prismatic and pebble bed reactor designs. This paper does not address a business decision based on the economics, business model and resulting business case since these will vary based on the reactor application. The selection of the type of reactor, the module ratings, the number of modules, the configuration of the balance of plant and other design selections will be made on the basis of optimizing the Business Case for the application. These are not decisions that can be made on a generic basis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NGNP Risk Management through Assessing Technology Readiness

Throughout the Next Generation Nuclear Plant (NGNP) project life cycle, technical risks are identified, analyzed, and mitigated and decisions are made regarding the design and selection of plant and sub-system configurations, components and their fabrication materials, and operating conditions. Risk resolution and decision making are key elements that help achieve project completion within budget and schedule constraints and desired plant availability. To achieve this objective, a formal decision-making and risk management process was developed for NGNP, based on proven systems engineering principles that have guided aerospace and military applications.

42 ENGINEERING↗

NGNP Research and Development Status

At the inception of the Next Generation Nuclear Plant (NGNP) project, experts from the Department of Energy (DOE) national laboratories, gas reactor vendors, and universities collaborated to establish technology research and development (R&D) roadmaps. These roadmaps outlined the testing and computational development activities needed to qualify the materials and validate the modeling and simulation tools to be used in the design and safe operation of the NGNP, a helium-cooled, high temperature gas reactor (HTGR).

99 GENERAL AND MISCELLANEOUS↗

NGNP Engineering Status

The objectives of Phase 1 Engineering and Design scope are to: 1) complete the initial design activities for a prototype nuclear reactor and plant that is capable of co-generating electricity, hydrogen, and process heat; 2) identify technological aspects of the NGNP that need further advancement by research and development activities; and 3) provide engineering support to the early licensing process, including technical input to white papers and developing the basis for future safety analyses.

42 ENGINEERING↗

High Temperature Gas-cooled Reactor Projected Markets and Scoping Economics

The NGNP Project has the objective of developing the high temperature gas-cooled reactor (HTGR) technology to supply high temperature process heat to industrial processes as a substitute for burning of fossil fuels, such as natural gas. Applications of the HTGR technology that have been evaluated by the NGNP Project for supply of process heat include supply of electricity, steam and high-temperature gas to a wide range of industrial processes, and production of hydrogen and oxygen for use in petrochemical, refining, coal to liquid fuels, chemical, and fertilizer plants.

42 ENGINEERING↗

Basis for NGNP Reactor Design Down-Selection

The purpose of this paper is to identify the extent of technology development, design and licensing maturity anticipated to be required to credibly identify differences that could make a technical choice practical between the prismatic and pebble bed reactor designs. This paper does not address a business decision based on the economics, business model and resulting business case since these will vary based on the reactor application. The selection of the type of reactor, the module ratings, the number of modules, the configuration of the balance of plant and other design selections will be made on the basis of optimizing the Business Case for the application. These are not decisions that can be made on a generic basis.

42 ENGINEERING↗

Summary of Differences in Approach to Executing the NGNP Project

The following discuss the summary differences between the NGNP Industry Alliance’s approach to execution of the NGNP Project as described in its Project Execution Strategy, and that included in the DOE’s Report to Congress on the Next Generation Nuclear Plant dated April 2010. These summary differences are not a comprehensive description of the results of a detailed gap analysis, but rather are those differences that warrant discussion in meetings between DOE executives and the private sector represented by the Alliance. In practical fact, the full range and content of the differences will not be understood until such time as detailed discussions are engaged between the DOE and the Alliance to develop a mutually agreed-to project execution plan.

42 ENGINEERING↗

Summary for the Next Generation Nuclear Plant Project in Review

This paper reports on the major progress that the NGNP Project has made toward developing and commercializing the HTGR technology. Significant R&D progress has been made in addressing key technical issues for qualification of the HTGR fuel and graphite, codification of high temperature materials and verification and validation of design codes. Work is also progressing in heat transfer/transport design and testing and in development of the high temperature steam electrolysis hydrogen production process. A viable licensing strategy has been formulated in coordination with the NRC and DOE. White papers covering key licensing issues have been and will continue to be submitted and necessary discussions of these key issues have begun with the NRC. Continued government support is needed to complete the Project objectives as established in the 2005 Energy Policy Act.

99 GENERAL AND MISCELLANEOUS↗

Summary for the Next Generation Nuclear Plant Project in Review

This paper reports on the major progress that the NGNP Project has made toward developing and commercializing the HTGR technology. Significant R&D progress has been made in addressing key technical issues for qualification of the HTGR fuel and graphite, codification of high temperature materials and verification and validation of design codes. Work is also progressing in heat transfer/transport design and testing and in development of the high temperature steam electrolysis hydrogen production process. A viable licensing strategy has been formulated in coordination with the NRC and DOE. White papers covering key licensing issues have been and will continue to be submitted and necessary discussions of these key issues have begun with the NRC. Continued government support is needed to complete the Project objectives as established in the 2005 Energy Policy Act.

99 GENERAL AND MISCELLANEOUS↗