Search NASA⌕ Search

SEARCH · Search NASA

Results for “NEXT-C”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

The NEXT-C Power Processing Unit: Lessons Learned from the Design, Build, and Test of the NEXT-C PPU for APL's DART Mission

NASA’s Double Asteroid Redirection Test (DART) will be the first-ever planetary defense mission to demonstrate asteroid deflection using kinetic impactor technology. The DART spacecraft will utilize the NASA Evolutionary Xenon Thruster (NEXT), which is a successor to the NSTAR ion propulsion system that successfully propelled NASA’s Deep Space 1 and Dawn spacecraft. In 2015, NASA partnered with Aerojet Rocketdyne and ZIN Technologies on the NEXT-Commercial (NEXT-C) effort to manufacture a Flight-Qualified (TRL 8) power processing unit (PPU). The NEXT-C PPU was based on the heritage gridded ion thruster PPU from NSTAR and NEXT, but with significant improvements in performance and manufacturability. The design goals of the NEXT-C PPU were to achieve the technical performance goals of the PPU in size, mass, and efficiency over a wide range of input voltage and output power. This paper discusses the lessons learned from the design, build, and test of the NEXT-C PPU, and how challenges were overcome to deliver a Flight PPU.

NEXT-C↗

The NEXT-C Power Processing Unit: Lessons Learned from the Design, Build, and Test of the NEXT-C PPU for APL's DART Mission

NASA’s Double Asteroid Redirection Test (DART) will be the first-ever planetary defense mission to demonstrate asteroid deflection using kinetic impactor technology. The DART spacecraft will utilize the NASA Evolutionary Xenon Thruster (NEXT), which is a successor to the NSTAR ion propulsion system that successfully propelled NASA’s Deep Space 1 and Dawn spacecraft. In 2015, NASA partnered with Aerojet Rocketdyne and ZIN Technologies on the NEXT-Commercial (NEXT-C) effort to manufacture a Flight-Qualified (TRL 8) power processing unit (PPU). The NEXT-C PPU was based on the heritage gridded ion thruster PPU from NSTAR and NEXT, but with significant improvements in performance and manufacturability. The design goals of the NEXT-C PPU were to achieve the technical performance goals of the PPU in size, mass, and efficiency over a wide range of input voltage and output power. This paper discusses the lessons learned from the design, build, and test of the NEXT-C PPU, and how challenges were overcome to deliver a Flight PPU.

NEXT-C↗

Current Status of NASA's NEXT-C Ion Propulsion System Development Project

NASA's Evolutionary Xenon Thruster (NEXT) is a 7-kW class gridded ion thruster-based propulsion system that was initially developed from 2002 to 2012 under NASAs In-Space Propulsion Technology Program to meet future science mission requirements. In 2015, a contract was awarded to Aerojet Rocketdyne, with subcontractor ZIN Technologies, to design, build and test two NEXT flight thrusters and two power processing units that would be available for use on future NASA science missions. Because an additional goal of this contract is to take steps towards offering NEXT as a commercialized system, it is called the NEXT-Commercial project, or NEXT-C. This paper reviews the capabilities of the NEXT-C system, status of the NEXT-C project, and the forward plan to build, test, and deliver flight hardware in support of future NASA and commercial applications. It also briefly addresses some of the potential applications that could utilize the hardware developed and built by the project.

Shastry, Rohit↗

Status of the Development of Flight Power Processing Units for the NASAs Evolutionary Xenon Thruster - Commercial (NEXT-C) Project

A pathfinder prototype unit and two flight power processing units (PPUs) are being developed by the Aerojet Rocketdyne Corporation in Redmond, Washington and ZIN Technologies in Cleveland, Ohio, in support of the NEXT-C Project. This project is being led by the NASA Glenn Research Center in Cleveland, Ohio, and will also yield two flight thrusters. This hardware is being considered to be provided as Government Furnished Equipment for the New Frontiers Program, and is applicable to a variety of planetary science missions and astrophysics science missions. The design of the NEXT-C PPU evolves from the hardware fabricated under the NEXT technology development project. The power processing unit operates from two sources: a wide input 80 to 160 V high-power bus and a nominal 28 V low-power bus. The unit includes six power supplies. Four power supplies (beam, accelerator, discharge, and neutralizer keeper) are needed for steady state operation, while two cathode heater power supplies (neutralizer and discharge) are utilized during thruster startup. The unit in total delivers up to 7 kW of regulated power to a single gridded-ion thruster. Significant modifications to the initial design include: high-power adaptive-delay control, upgrade of design to EEE-INST-002 compliance, telemetry accuracy improvements, incorporation of telemetry to detect plume-mode operation, and simplification of the design in select areas to improve manufacturability and commercialization potential. The project is presently in the prototype phase and preparing for qualification level environmental testing.

NASAaEuro(TM)s Evolutionary Xenon Thruster↗

Heater Validation for the NEXT-C Hollow Cathodes

Swaged cathode heaters whose design was successfully demonstrated under a prior flight project are to be provided by the NASA Glenn Research Center for the NEXT-C ion thruster being fabricated by Aerojet Rocketdyne. Extensive requalification activities were performed to validate process controls that had to be re-established or revised because systemic changes prevented reuse of the past approaches. A development batch of heaters was successfully fabricated based on the new process controls. Acceptance and cyclic life testing of multiple discharge and neutralizer sized heaters extracted from the development batch was initiated in August, 2016, with the last heater completing testing in April, 2017. Cyclic life testing results substantially exceeded the NEXT-C thruster requirement as well as all past experience for GRC fabricated units. The heaters demonstrated ultimate cyclic life capability of 19050 to 33500 cycles. A qualification batch of heaters is now being fabricated using the finalized process controls. A set of six heaters will be acceptance and cyclic tested to verify conformance to the behavior observed with the development heaters. The heaters for flight use will be then be provided to the contractor. This paper summarizes the fabrication process control activities and the acceptance and life testing of the development heater units.

hollow cathodes↗

Heater Validation for the NEXT-C Hollow Cathodes

Swaged cathode heaters whose design was successfully demonstrated under a prior flight project are to be provided by the NASA Glenn Research Center for the NEXT-C ion thruster being fabricated by Aerojet Rocketdyne. Extensive requalification activities were performed to validate process controls that had to be re-established or revised because systemic changes prevented reuse of the past approaches. A development batch of heaters was successfully fabricated based on the new process controls. Acceptance and cyclic life testing of multiple discharge and neutralizer sized heaters extracted from the development batch was initiated in August, 2016, with the last heater completing testing in April, 2017. Cyclic life testing results substantially exceeded the NEXT-C thruster requirement as well as all past experience for GRC-fabricated units. The heaters demonstrated ultimate cyclic life capability of 19050 to 33500 cycles. A qualification batch of heaters is now being fabricated using the finalized process controls. A set of six heaters will be acceptance and cyclic tested to verify conformance to the behavior observed with the development heaters. The heaters for flight use will be then be provided to the contractor from the remainder of the qualification batch. This paper summarizes the fabrication process control activities and the acceptance and life testing of the development heater units.

Verhey, Timothy R.↗

Qualification of the Flight Heaters for the NEXT-C Hollow Cathodes

After successful validation of the design, swaged cathode heaters have been delivered by the NASA Glenn Research Center to Aerojet Rocketdyne for the fabrication of the NEXT-C ion thruster. NASA Glenn Research Center re-established and validated process controls as well as completed cyclic life testing of development heaters. Following an extensive requalification program, fabrication of a flight batch of heaters was executed using the qualified process controls. Of the 28 heaters fabricated in this flight batch, a set of six heaters were acceptance and cyclic tested to verify conformance with operational requirements. Upon completion of 200 percent of the NEXT-C cyclic requirement, the heater batch was certified by NASA for use in the flight hollow cathodes. Nine heaters from the batch of 28 were provided to Aerojet Rocketdyne in early 2018 for cathode fabrication. This paper summarizes the acceptance and cyclic life testing of the flight heaters and preliminary findings of post-test analyses.

Arthur, Neil↗

Qualification of the Flight Heaters for the NEXT-C Hollow Cathodes

After successful validation of the design, swaged cathode heaters have been delivered by the NASA Glenn Research Center to Aerojet Rocketdyne for the fabrication of the NEXT-C ion thruster . NASA Glenn Research Center re-established and validated process controls as well as completed cyclic life testing of development heaters. Following an extensive requalification program, fabrication of a flight batch of heaters was executed using the qualified process controls. Of the 28 heaters fabricated in this flight batch, a set of six heaters were acceptance and cyclic tested to verify conformance with operational requirements. Upon completion of 200 percent of the NEXT-C cyclic requirement, the heater batch was certified by NASA for use in the flight hollow cathodes. Nine heaters from the batch of 28 were provided to Aerojet Rocketdyne in early 2018 for cathode fabrication. This paper summarizes the acceptance and cyclic life testing of the flight heaters and preliminary findings of post-test analyses.

Arthur, Neil↗

QualifiCation of the Flight Heaters for the NEXT-C Hollow Cathodes

After successful validation of the design, swaged cathode heaters have been delivered by the NASA Glenn Research Center to Aerojet Rocketdyne for the fabrication of the NEXT-C ion thruster . NASA Glenn Research Center re-established and validated process controls as well as completed cyclic life testing of development heaters. Following an extensive requalification program, fabrication of a flight batch of heaters was executed using the qualified process controls. Of the 28 heaters fabricated in this flight batch, a set of six heaters were acceptance and cyclic tested to verify conformance with operational requirements. Upon completion of 200 percent of the NEXT-C cyclic requirement, the heater batch was certified by NASA for use in the flight hollow cathodes. Nine heaters from the batch of 28 were provided to Aerojet Rocketdyne in early 2018 for cathode fabrication. This paper summarizes the acceptance and cyclic life testing of the flight heaters and preliminary findings of post-test analyses.

Arthur, Neil↗

Investigation of Rectifier Diode Failures in the NEXT-C Power Processing Unit

NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) project is tasked with developing flight electric propulsion systems, including both thrusters and power processing units (PPUs). In 2018, the beam supply in a NEXT-C engineering prototype PPU experienced an output rectifier diode failure during development thermal-vacuum testing. A failure investigation led by NASA GRC identified the root cause of the failure as a thermal runaway caused by increased reverse recovery losses in the diodes when the PPU was run at its maximum operating temperature. Significant reverse recovery performance variations were identified in diodes with the same part number but manufactured by different vendors. The failure investigation was able to collect evidence of the increased reverse recovery and replicate the diode failures in a controlled laboratory environment.

George L Thomas↗

Investigation of Rectifier Diode Failures in the NEXT-C Power Processing Unit

NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) project is tasked with developing flight electric propulsion systems, including both thrusters and power processing units (PPUs). In 2018, the beam supply in a NEXT-C engineering prototype PPU experienced an output rectifier diode failure during development thermal-vacuum testing. A failure investigation led by NASA GRC identified the root cause of the failure as a thermal runaway caused by increased reverse recovery losses in the diodes when the PPU was run at its maximum operating temperature. Significant reverse recovery performance variations were identified in diodes with the same part number but manufactured by different vendors. The failure investigation was able to collect evidence of the increased reverse recovery and replicate the diode failures in a controlled laboratory environment.

George L. Thomas↗

Diagnostic for Verifying the Thrust Vector Requirement of the AEPS Hall-Effect Thruster and Comparison to the NEXT-C Thrust Vector Diagnostic

A diagnostic has been designed and fabricated to verify the thrust vector requirement for the Advanced Electric Propulsion System (AEPS) Hall Effect Rocket with Magnetic Shielding (HERMeS) thruster. This diagnostic will be used to verify that the propulsion system thrust vector offset from the mounting surface normal vector does not exceed 1.5 degrees over the entire throttling range and over the course of 23,000 hours of thruster testing. The diagnostic will also not violate the thruster's required voltage standoff capability in the presence of carbon backsputter by being minimally intrusive and not significantly adding to the facility backsputtered rate. Based on these requirements, an appropriate diagnostic design was determined to comprise of an array of 23 Faraday probes swept through the plume in an arc 1m from the thruster to map the beam current density. The beam current density centroid of the plume is assumed to track the thrust vector within an acceptable level of uncertainty. Additionally, a reference system, including optical alignment to the mounting surface normal vector and tilt sensors, was devised to periodically calibrate the probe position and motion throughout the long duration wear test campaign. Initial measurements of the thruster plume have been acquired to demonstrate the diagnostics functionality, verify procedures, and assess any necessary improvements prior to implementation of the diagnostic during the AEPS Engineering Development Unit (EDU) long duration wear test. To illustrate the merits of differing approaches to thrust vector determination for different classes of electric propulsion thrusters, NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) thrust vector diagnostic design details and recent data are also discussed (Appendix A).

Benavides, Gabriel F.↗

Diagnostic for Verifying the Thrust Vector Requirement of the AEPS Hall-Effect Thruster and Comparison to the NEXT-C Thrust Vector Diagnostic

A diagnostic has been designed and fabricated to verify the thrust vector requirement for the Advanced Electric Propulsion System (AEPS) Hall Effect Rocket with Magnetic Shielding (HERMeS) thruster. This diagnostic will be used to verify that the propulsion system thrust vector offset from the mounting surface normal vector does not exceed 1.5 degrees over the entire throttling range and over the course of 23,000 hours of thruster testing. The diagnostic will also not violate the thruster's required voltage standoff capability in the presence of carbon backsputter by being minimally intrusive and not significantly adding to the facility backsputtered rate. Based on these requirements, an appropriate diagnostic design was determined to comprise of an array of 23 Faraday probes swept through the plume in an arc 1m from the thruster to map the beam current density. The beam current density centroid of the plume is assumed to track the thrust vector within an acceptable level of uncertainty. Additionally, a reference system, including optical alignment to the mounting surface normal vector and tilt sensors, was devised to periodically calibrate the probe position and motion throughout the long duration wear test campaign. Initial measurements of the thruster plume have been acquired to demonstrate the diagnostics functionality, verify procedures, and assess any necessary improvements prior to implementation of the diagnostic during the AEPS Engineering Development Unit (EDU) long duration wear test. To illustrate the merits of differing approaches to thrust vector determination for different classes of electric propulsion thrusters, NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) thrust vector diagnostic design details and recent data are also discussed (Appendix A).

Benavides, Gabriel F.↗

Diagnostic for Verifying the Thrust Vector Requirement of the AEPS Hall-Effect Thruster and Comparison to the NEXT-C Thrust Vector Diagnostic

A diagnostic has been designed and fabricated to verify the thrust vector requirement for the Advanced Electric Propulsion System (AEPS) Hall Effect Rocket with Magnetic Shielding (HERMeS) thruster. This diagnostic will be used to verify that the propulsion system thrust vector offset from the mounting surface normal vector does not exceed 1.5 degrees over the entire throttling range and over the course of 23,000 hours of thruster testing. The diagnostic will also not violate the thruster's required voltage standoff capability in the presence of carbon backsputter by being minimally intrusive and not significantly adding to the facility backsputtered rate. Based on these requirements, an appropriate diagnostic design was determined to comprise of an array of 23 Faraday probes swept through the plume in an arc 1m from the thruster to map the beam current density. The beam current density centroid of the plume is assumed to track the thrust vector within an acceptable level of uncertainty. Additionally, a reference system, including optical alignment to the mounting surface normal vector and tilt sensors, was devised to periodically calibrate the probe position and motion throughout the long duration wear test campaign. Initial measurements of the thruster plume have been acquired to demonstrate the diagnostics functionality, verify procedures, and assess any necessary improvements prior to implementation of the diagnostic during the AEPS Engineering Development Unit (EDU) long duration wear test. To illustrate the merits of differing approaches to thrust vector determination for different classes of electric propulsion thrusters, NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) thrust vector diagnostic design details and recent data are also discussed (Appendix A).

Advanced Electric Propulsion System (AEPS)↗

Rocket Propulsion 21 Steering Committee Meeting (RP21) NASA In-Space Propulsion Update

In-house Support of NEXT-C Contract Status Thruster NEXT Long Duration Test post-test destructive evaluation in progress Findings will be used to verify service life models identify potential design improvements Cathode heater fabrication initiated for cyclic life testing Thruster operating algorithm definition verification initiated to provide operating procedures for mission users High voltage propellant isolator life test voluntarily terminated after successfully operating 51,200 h Power processor unit (PPU) Replaced all problematic stacked multilayer ceramic dual inline pin capacitors within PPU Test bed Rebuilt installed discharge power supply primary power board Completed full functional performance characterization Final test report in progress Transferred PPU Testbed to contractor to support prototype design effort.

Electric Propulsion↗

Overview of Electric Propulsion Projects at NASA Glenn Research Center

NASA Glenn Research Center (GRC) is currently leading the development of multiple electric propulsion systems to flight readiness. The Advanced Electric Propulsion System is a 12.5 kW Hall thruster system that is being developed by the Solar Electric Propulsion Technology Demonstration Mission (SEP TDM) project, under the sponsorship of the Space Technology Mission Directorate. NASA's Evolutionary Xenon Thruster-Commercial (NEXT-C) is 7 kW class gridded ion thruster system that being developed under the sponsorship of the Science Mission Directorate. NASA GRC is also providing electric propulsion discipline support to the Power and Propulsion Element and the Double Asteroid Redirection Test (DART) missions, which will be the first applications for these technologies, respectively. Lower technology readiness level (TRL) projects are underway for applications including CubeSats, small spacecraft and Mars exploration vehicles. Under the sponsorship of the Small Spacecraft Technology Program, NASA GRC has performed numerous independent verification and validation tests of CubeSat class electric propulsion systems in support of a growing number of small US businesses that are developing these systems. Lastly, three technology development efforts focused on 100 kW EP strings led by Aerojet Rocketdyne, Ad Astra and MSNW were recently completed.

Smith, Bryan K.↗