Search NASA⌕ Search

SEARCH · Search NASA

Results for “NPR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Multi-Center Implementation of NPR 7123.1A: A Collaborative Effort

Collaboration efforts between MSFC and GRC Engineering Directorates to implement the NASA Systems Engineering (SE) Engine have expanded over the past year to include other NASA Centers. Sharing information on designing, developing, and deploying SE processes has sparked further interest based on the realization that there is relative consistency in implementing SE processes at the institutional level. This presentation will provide a status on the ongoing multi-center collaboration and provide insight into how these NPR 7123.1A SE-aligned directives are being implemented and managed to better support the needs of NASA programs and projects. NPR 7123.1A, NASA Systems Engineering Processes and Requirements, was released on March 26, 2007 to clearly articulate and establish the requirements on the implementing organization for performing, supporting, and evaluating SE activities. In early 2009, MSFC and GRC Engineering Directorates undertook a collaborative opportunity to share their research and work associated with developing, updating and revising their SE process policy to comply and align with NPR 7123.1A. The goal is to develop instructions, checklists, templates, and procedures for each of the 17 SE process requirements so that systems engineers will be a position to define work that is process-driven. Greater efficiency and more effective technical management will be achieved due to consistency and repeatability of SE process implementation across and throughout each of the NASA centers. An added benefit will be to encourage NASA centers to pursue and collaborate on joint projects as a result of using common or similar processes, methods, tools, and techniques.

Hall, Phillip B.↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

Reducing NPR 7120.5D to Practice: Transitioning from Design Reviews to the SIR Hardware Review

The Gravity Recovery And Interior Laboratory (GRAIL) mission was the first Jet Propulsion Laboratory (JPL) project initiated under NASA's revised rules for space flight project management, NPR 7120.5D, "NASA Space Flight Program and Project Management Requirements." NASA selected GRAIL through a competitive Announcement of Opportunity process and funded its Phase B Preliminary Design effort. The team's first major milestone was a JPL institutional milestone, the Project Mission System Review (PMSR), which proved an excellent tune-up for the end-of-Phase-B NASA life-cycle review, the Preliminary Design Review (PDR). Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. For the Project Critical Design Review (CDR), lessons learned from the PDR and updated Standing Review Board (SRB) practices from the Agency were factored into the review preparation effort. Additionally, the review was held at the Principal Investigator's institution, the Massachusetts Institute of Technology, rather than at the project management center (JPL), which necessitated additional cross-country coordination steps. The PMSR, PDR, and CDR were design reviews and largely paper-oriented. For the System Integration Review (SIR), the project needed to transition to a hardware review and deal with paper in a very different manner. While many of the practices employed for the design reviews were modified and retained (e.g., review preparation team, gate products management, pre-reviews, SRB coordination), the review agenda, presentation style, and slide templates were significantly changed. A key success factor concerned the handling of project open paper, which was succinctly and effectively communicated to the SRB in presentations.This paper provides a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project SIR preparation and execution activities, including positive and negative lessons learned and identifies recommendations for future NASA (and non- NASA) project teams.

NPR 7120.5D↗

Analytic Calculation of Noise Power Robbing, NPR, and Polarization Isolation Degradation

Three Geostationary Operational Environmental Satellite (GOES) R transponders (services) required analysis and measurements to develop an accurate link budget. These are a) Search and Rescue transponder which suffers from power robbing due to thermal uplink noise, b) the Data Collection Platform Report which suffers from degradation due to NPR (Noise Power Ratio), and c) GOES Rebroadcast transponder which uses a dual circular downlink L band for which there was no depolarization data. The first two services required development of extended link budget to analytically calculate the impact of these degradations which are shown to have a significant impact on the link budget. The third service required measurements of atmospheric L band CP depolarization as there were no known previous measurements and results are reported her

Peters, Robert↗

NASA Risk Management Handbook

The purpose of this handbook is to provide guidance for implementing the Risk Management (RM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements [1], with a specific focus on programs and projects, and applying to each level of the NASA organizational hierarchy as requirements flow down. This handbook supports RM application within the NASA systems engineering process, and is a complement to the guidance contained in NASA/SP-2007-6105, NASA Systems Engineering Handbook [2]. Specifically, this handbook provides guidance that is applicable to the common technical processes of Technical Risk Management and Decision Analysis established by NPR 7123.1A, NASA Systems Engineering Process and Requirements [3]. These processes are part of the \Systems Engineering Engine. (Figure 1) that is used to drive the development of the system and associated work products to satisfy stakeholder expectations in all mission execution domains, including safety, technical, cost, and schedule. Like NPR 7123.1A, NPR 8000.4A is a discipline-oriented NPR that intersects with product-oriented NPRs such as NPR 7120.5D, NASA Space Flight Program and Project Management Requirements [4]; NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements [5]; and NPR 7120.8, NASA Research and Technology Program and Project Management Requirements [6]. In much the same way that the NASA Systems Engineering Handbook is intended to provide guidance on the implementation of NPR 7123.1A, this handbook is intended to provide guidance on the implementation of NPR 8000.4A. 1.2 Scope and Depth This handbook provides guidance for conducting RM in the context of NASA program and project life cycles, which produce derived requirements in accordance with existing systems engineering practices that flow down through the NASA organizational hierarchy. The guidance in this handbook is not meant to be prescriptive. Instead, it is meant to be general enough, and contain a sufficient diversity of examples, to enable the reader to adapt the methods as needed to the particular risk management issues that he or she faces. The handbook highlights major issues to consider when managing programs and projects in the presence of potentially significant uncertainty, so that the user is better able to recognize and avoid pitfalls that might otherwise be experienced.

Dezfuli, Homayoon↗

Effect of a transparent water-cooled cathode on the neutron production rate in the glow discharge-type fusion neutron source

In glow discharge-type deuterium–deuterium fusion neutron sources, fusion reactions occurring on the cathode surface contribute significantly to the neutron production rate (NPR); therefore, cathode design plays a crucial role in enhancing NPR. Although the NPR generally increases with discharge current, deuterium desorption caused by cathode heating tends to stagnate it in the high-current regime. Water cooling has been shown to mitigate this stagnation for nontransparent cathodes, but its effectiveness for transparent cathodes has not been experimentally clarified. Here, in this study, a transparent cathode with active water cooling and a spherical geometry was designed and fabricated using stainless steel tubing. Neutron production experiments were conducted with and without water cooling: with water cooling, applied voltages of 20–40 kV were investigated, while without water cooling, the applied voltage was limited to 25 kV. The results showed that the NPR increased continuously with discharge current without stagnation when water cooling was applied. A maximum NPR of (1.8 ± 0.02) × 10 6 n/s was achieved at 40 kV and 50 mA. Compared with our previously reported disk cathode and nontransparent water-cooled cathode of the same diameter, the transparent water-cooled cathode exhibited a significantly enhanced NPR. These findings indicate that combining cathode transparency with active cooling is an effective strategy for improving neutron production in glow discharge-type fusion neutron sources.

43 PARTICLE ACCELERATORS↗

Preliminary dynamic tests of a flight-type ejector

A thrust augmenting ejector was tested to provide experimental data to assist in the assessment of theoretical models to predict duct and ejector fluid-dynamic characteristics. Eleven full-scale thrust augmenting ejector tests were conducted in which a rapid increase in the ejector nozzle pressure ratio was effected through a unique facility, bypass/burst-disk subsystem. The present work examines two cases representative of the test performance window. In the first case, the primary nozzle pressure ration (NPR) increased 36 percent from one unchoked (NPR = 1.29) primary flow condition to another (NPR = 1.75) over a 0.15 second interval. The second case involves choked primary flow conditions, where a 17 percent increase in primary nozzle flowrate (from NPR = 2.35 to NPR = 2.77) occurred over approximately 0.1 seconds. Although the real-time signal measurements support qualitative remarks on ejector performance, extracting quantitative ejector dynamic response was impeded by excessive aerodynamic noise and thrust stand dynamic (resonance) characteristics. It does appear, however, that a quasi-steady performance assumption is valid for this model with primary nozzle pressure increased on the order of 50 lb(sub f)/s. Transient signal treatment of the present dataset is discussed and initial interpretations of the results are compared with theoretical predictions for a similar Short Takeoff and Vertical Landing (STOVL) ejector model.

Drummond, Colin K.↗

Preliminary dynamic tests of a flight-type ejector

A thrust augmenting ejector was tested to provide experimental data to assist in the assessment of theoretical models to predict duct and ejector fluid-dynamic characteristics. Eleven full-scale thrust augmenting ejector tests were conducted in which a rapid increase in the ejector nozzle pressure ratio was effected through a unique bypass/burst-disk subsystem. The present work examines two cases representative of the test performance window. In the first case, the primary nozzle pressure ration (NPR) increased 36 percent from one unchoked (NPR = 1.29) primary flow condition to another (NPR = 1.75) over a 0.15 second interval. The second case involves choked primary flow conditions, where a 17 percent increase in primary nozzle flowrate (from NPR = 2.35 to NPR = 2.77) occurred over approximately 0.1 seconds. Transient signal treatment of the present dataset is discussed and initial interpretations of the results are compared with theoretical predictions for a similar STOVL ejector model.

Drummond, Colin K.↗

Computational Simulations of Convergent Nozzles for the AIAA 1st Propulsion Aerodynamics Workshop

Computational Fluid Dynamics (CFD) simulations were completed for a series of convergent nozzles in participation of the American Institute of Aeronautics and Astronautics (AIAA) 1st Propulsion Aerodynamics Workshop. The simulations were performed using the Wind-US flow solver. Discharge and thrust coefficients were computed for four axisymmetric nozzles with nozzle pressure ratios (NPR) ranging from 1.4 to 7.0. The computed discharge coefficients showed excellent agreement with available experimental data; the computed thrust coefficients captured trends observed in the experimental data, but over-predicted the thrust coefficient by 0.25 to 1.0 percent. Sonic lines were computed for cases with NPR >= 2.0 and agreed well with experimental data for NPR >= 2.5. Simulations were also performed for a 25 deg. conic nozzle bifurcated by a flat plate at NPR = 4.0. The jet plume shock structure was compared with and without the splitter plate to the experimental data. The Wind-US simulations predicted the shock structure well, though lack of grid resolution in the plume reduced the sharpness of the shock waves. Unsteady Reynolds-Averaged Navier-Stokes (URANS) simulations and Detached Eddy Simulations (DES) were performed at NPR = 1.6 for the 25 deg conic nozzle with splitter plate. The simulations predicted vortex shedding from the trailing edge of the splitter plate. However, the vortices of URANS and DES solutions appeared to dissipate earlier than observed experimentally. It is believed that a lack of grid resolution in the region of the vortex shedding may have caused the vortices to break down too soon

DES↗

NASA Space Flight Program and Project Management Handbook

This handbook is the companion document to NPR 7120.5F, NASA Space Flight Program and Project Management Requirements. It represents the accumulation of knowledge on managing program and projects derived from NASA’s human, robotic, and scientific missions. It incorporates the “corporate knowledge” for existing and future NASA space flight programs and projects, including NASA’s Artemis missions to establish a sustainable human presence on the Moon through collaboration with commercial and international partners, NASA’s James Webb Space Telescope (JWST) mission, and NASA’s robotic missions on Mars. The practices discussed have evolved as a function of NASA’s core values of safety, integrity, teamwork, excellence, and inclusion, and may also prove a resource for other agencies, the private sector, and academia. The knowledge gained from the Agency’s victories and defeats, including the checks and balances and initiatives to better control cost and risk, provides a foundation for continuing an exciting and healthy space program. This handbook provides implementation guidance for NPR 7120.5F and includes the changes and updates to key procedural requirements in NPR 7120.5F since NPR 7120.5E. The goal of the NPR requirements is to ensure programs and projects are developed and successfully executed in the most cost-effective and efficient manner possible. This handbook provides context, rationale, and explanation to facilitate the application of requirements and to pass on some of the hard-won best practices and lessons learned.

Tracy L Osborne↗

Study of a Plug Nozzle for Supersonic Aircraft Concepts

A plug nozzle with a cylindrical cowl is studied. The geometry is adopted following commercial supersonic aircraft concepts considered in an ongoing NASA program. For the given cowl, the plug geometry is varied that includes shapes developed by a numerical optimization study as well as porous plugs. Experimental data on noise and flow field are discussed with an eye for minimum noise at low nozzle pressure ratios (NPR2) representing landing and takeoff (LTO) conditions. NPR up to about 4.7 is covered in the experiments. Limited thrust data with accompanying numerical simulation results are also presented. Results show that a plug designed for optimum thrust at cruise is noisier while a plug designed for optimum thrust at LTO has less noise, throughout the NPR range covered. The results also show that a plug nozzle can generate transonic tones and excess broadband noise (EBBN) at lower NPR, apart from well-known screech tones and broadband shock associated noise (BBSN) at higher NPR. A long porous plug is found to effectively suppress all these aberrant noise components while suffering less than 1% loss in thrust coefficient.

Jets↗

Study of a Plug Nozzle for Supersonic Aircraft Concepts

A plug nozzle with a cylindrical cowl is studied. The geometry is adopted following commercial supersonic aircraft concepts considered in an ongoing NASA program. For the given cowl, the plug geometry is varied that includes shapes developed by a numerical optimization study as well as porous plugs. Experimental data on noise and flow field are discussed with an eye for minimum noise at low nozzle pressure ratios (NPR2) representing landing and takeoff (LTO) conditions. NPR up to about 4.7 is covered in the experiments. Limited thrust data with accompanying numerical simulation results are also presented. Results show that a plug designed for optimum thrust at cruise is noisier while a plug designed for optimum thrust at LTO has less noise, throughout the NPR range covered. The results also show that a plug nozzle can generate transonic tones and excess broadband noise (EBBN) at lower NPR, apart from well-known screech tones and broadband shock associated noise (BBSN) at higher NPR. A long porous plug is found to effectively suppress all these aberrant noise components while suffering less than 1% loss in thrust coefficient.

Jets↗

Performance characteristics of two multiaxis thrust-vectoring nozzles at Mach numbers up to 1.28

The thrust-vectoring axisymmetric (VA) nozzle and a spherical convergent flap (SCF) thrust-vectoring nozzle were tested along with a baseline nonvectoring axisymmetric (NVA) nozzle in the Langley 16-Foot Transonic Tunnel at Mach numbers from 0 to 1.28 and nozzle pressure ratios from 1 to 8. Test parameters included geometric yaw vector angle and unvectored divergent flap length. No pitch vectoring was studied. Nozzle drag, thrust minus drag, yaw thrust vector angle, discharge coefficient, and static thrust performance were measured and analyzed, as well as external static pressure distributions. The NVA nozzle and the VA nozzle displayed higher static thrust performance than the SCF nozzle throughout the nozzle pressure ratio (NPR) range tested. The NVA nozzle had higher overall thrust minus drag than the other nozzles throughout the NPR and Mach number ranges tested. The SCF nozzle had the lowest jet-on nozzle drag of the three nozzles throughout the test conditions. The SCF nozzle provided yaw thrust angles that were equal to the geometric angle and constant with NPR. The VA nozzle achieved yaw thrust vector angles that were significantly higher than the geometric angle but not constant with NPR. Nozzle drag generally increased with increases in thrust vectoring for all the nozzles tested.

Wing, David J.↗

Three-Dimensional Computational Model for Flow in an Over-Expanded Nozzle With Porous Surfaces

A three-Dimensional computational model is used to simulate flow in a non-axisymmetric, convergent-divergent nozzle incorporating porous cavities for shock-boundary layer interaction control. The nozzle has an expansion ratio (exit area/throat area) of 1.797 and a design nozzle pressure ratio of 8.78. Flow fields for the baseline nozzle (no porosity) and for the nozzle with porous surfaces of 10% openness are computed for Nozzle Pressure Ratio (NPR) varying from 1.29 to 9.54. The three dimensional computational results indicate that baseline (no porosity) nozzle performance is dominated by unstable, shock-induced, boundary-layer separation at over-expanded conditions. For NPR less than or equal to 1.8, the separation is three dimensional, somewhat unsteady, and confined to a bubble (with partial reattachment over the nozzle flap). For NPR greater than or equal to 2.0, separation is steady and fully detached, and becomes more two dimensional as NPR increased. Numerical simulation of porous configurations indicates that a porous patch is capable of controlling off design separation in the nozzle by either alleviating separation or by encouraging stable separation of the exhaust flow. In the present paper, computational simulation results, wall centerline pressure, mach contours, and thrust efficiency ratio are presented, discussed and compared with experimental data. Results indicate that comparisons are in good agreement with experimental data. The three-dimensional simulation improves the comparisons for over-expanded flow conditions as compared with two-dimensional assumptions.

Abdol-Hamid, K. S.↗

NASA Schedule Management Handbook

The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

Source record↗