Search NASA⌕ Search

SEARCH · Search NASA

Results for “NSD”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

On the Current Trend of Tropical Cyclone Activity and the Lengthening of the Tropical Cyclone Season in the North Atlantic Basin

In this TP, the trend in North Atlantic basin TC activity, especially as related to the determination of the length of season (LOS) and its possible association with warming surface-air and sea-surface temperature, is revisited. In particular, examined are: (1) the trend in TC activity for the yearly intervals 1945-1965, 1966-1994, and 1995-2012 for TCs having duration NSD greater or equal to 0.25 day, less than 2 days, greater than or equal to 2 days, greater than or equal to 4 days, and greater than or equal to 8 days; (2) the latitudinal and longitudinal genesis locations of the short-lived TC (defined herein as those TCs having duration NSD less than 2 days) for the three yearly intervals; (3) the first storm day (FSD), last storm day (LSD), and LOS based on TCs having duration NSD greater than or equal to 0.25 day and NSD greater than or equal to 2 days; (4) the relationship between FSD, LSD, and LOS for TCs having duration NSD greater than or equal to 0.25 day and NSD greater than or equal to 2 days; (5) the surface-air and sea-surface temperature, wind, and North Atlantic Oscillation (NAO) during the interval 1945-2012; (6) the relationship of FSD, LSD, and LOS against surface-air and sea-surface temperature, wind, and the NAO; (7) the relationship of TC activity against surface-air and sea-surface temperature, wind, and the NAO; and (8) the relationship of TC activity against FSD and LOS. This TP represents an update to an earlier study by Wilson concerning the length of the yearly hurricane season.

Wilson, Robert M.↗

Ignition-and-Growth Modeling of NASA Standard Detonator and a Linear Shaped Charge

The main objective of this study is to quantitatively investigate the ignition and shock sensitivity of NASA Standard Detonator (NSD) and the shock wave propagation of a linear shaped charge (LSC) after being shocked by NSD flyer plate. This combined explosive train was modeled as a coupled Arbitrary Lagrangian-Eulerian (ALE) model with LS-DYNA hydro code. An ignition-and-growth (I&G) reactive model based on unreacted and reacted Jones-Wilkins-Lee (JWL) equations of state was used to simulate the shock initiation. Various NSD-to-LSC stand-off distances were analyzed to calculate the shock initiation (or failure to initiate) and detonation wave propagation along the shaped charge. Simulation results were verified by experimental data which included VISAR tests for NSD flyer plate velocity measurement and an aluminum target severance test for LSC performance verification. Parameters used for the analysis were obtained from various published data or by using CHEETAH thermo-chemical code.

Oguz, Sirri↗

Estimated capital costs of fish exclusion technologies for hydropower facilities

Hydropower is a reliable source of renewable energy, and its future expansion is likely to be in the form of either smaller new stream development (NSD) projects or powering existing non-powered dams. Thresholds for entrainment risk to fish and the requirements for fish exclusion at hydropower facilities often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders, but little quantitative information is present within the literature regarding the specific costs of fish exclusion measures. Cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening were identified using keyword searches of an existing environmental mitigation cost data set and manual extraction from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 p.m.&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens and represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with NSD projects. Results indicate highly variable costs are associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1–2 in.). These data provide an initial baseline for estimating exclusion costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects.

13 HYDRO ENERGY↗

2019 Quantum Materials Young Investigators Workshop Report

The fourth edition of the workshop “Quantum Materials Young Investigators” was held June 6-7, 2019 at the Oak Ridge National Laboratory (ORNL). This workshop followed up on previous meetings that took place at ORNL starting in 2016. This important series of annual workshops, organized by Adam Aczel and Stuart Calder, ensures continuous engagement with the early career principal investigators (PIs) of the quantum materials neutron scattering community. Through a series of short scientific talks presented by the external PIs, members of the Neutron Scattering Division (NSD) learn about their scientific interests and needs. Presentations from ORNL staff members also help to inform the external PIs about the current state of ORNL’s quantum materials neutron scattering program. Topics covered include the current instrument suites, sample environment, data reduction, visualization, and analysis, and future neutron scattering and complementary capabilities. Feedback is solicited from the external PIs in all these key areas and communicated to NSD management in the form of a workshop report. This workshop series also helps to foster collaborations between NSD scientists and the research groups of the external PIs and plays an important role in attracting new neutron scattering users.

43 PARTICLE ACCELERATORS↗

2022 Quantum Materials Young Investigators Workshop Report

The fifth edition of the workshop “Quantum Materials Young Investigators” was held August 18-19, 2022 at the Oak Ridge National Laboratory (ORNL). This workshop followed up on previous meetings that took place at ORNL starting in 2016. This important series of annual workshops, organized by Adam Aczel and Stuart Calder, ensures continuous engagement with the early career principal investigators (PIs) of the quantum materials neutron scattering community. Through a series of short scientific talks presented by the external PIs, members of the Neutron Scattering Division (NSD) learn about their scientific interests and needs. Presentations from ORNL staff members also help to inform the external PIs about the current state of ORNL’s quantum materials neutron scattering program. Topics covered include neutron scattering instruments, sample environment, neutron polarization, data reduction, visualization, and analysis, and future neutron scattering and complementary capabilities. Feedback is solicited from the external PIs in some or all of these key areas and communicated to NSD management in the form of a workshop report. This workshop series also helps to foster collaborations between NSD scientists and the research groups of the external PIs and plays an important role in attracting new neutron scattering users.

36 MATERIALS SCIENCE↗

Hydropower Development Opportunities for Alaska Native Villages

As a part of the Department of Energy’s (DOE) 2014 study on hydropower new stream-reach development (NSD) opportunities in the U.S., Oak Ridge National Laboratory (ORNL) coordinated with the Alaskan Energy Authority (AEA) and the United States Army Corps of Engineers to assess Alaska’s undeveloped hydropower potential at sites where no dams currently exist. That study identified 437 feasible sites with a combined capacity of 4,723 MW (Kao et al., 2014). In 2016, ORNL met with the U.S. Department of Energy-Alaska Office to discuss hydropower development opportunities to support Alaska Native villages. ORNL, with AEA’ collaboration is evaluating opportunities to increase renewable energy generation for these villages based on the NSD assessment, recent project license applications, and candidate Alaska Renewable Energy Fund projects.Using data for village location, population, diesel consumption, generation and cost, and proximity to existing hydropower and transmission, an initial NSD site feasibility study was performed. To screen out villages and potential hydropower sites that did not meet high-level feasibility criteria, seven filters were used. Based on these filter values, only eleven villages passed all criteria. These eleven hydropower sites have a combined potential capacity of 2.95MW and could supply an estimated 12,934 MWh of renewable hydropower annually. Results indicate that these eleven villages could potentially reduce their total diesel usage by 520,000 gallons per year, which amounts to a present-day value of 50-year diesel savings totaling more than $57 million by tapping into this potential. Follow-up data collection, reconnaissance studies, and pre-feasibility analyses could provide more insight into hydropower development opportunities for Alaska Native villages and focus on the most promising development opportunities identified through this initial study.

Hadjerioua, Boualem↗

Theoretical examination of nuclear spin diffusion in light-induced spin coherences in photosystem I

Microsecond coherence times are predicted in spin dynamics calculations of a donor–acceptor electron spin pair P + A 1A - created upon light excitation of photosystem I (PSI). The effects of nuclear spin diffusion (NSD) due to the anisotropic protein environment on the predicted coherence times T M are studied. Closely positioned pairs and triples of protons located 5–8 Å from the electron spin are shown to largely control T M . Additionally, knowledge of the crystal structure of PSI allows for spin dynamics calculations where specific cofactors and amino acid residues are removed or replaced and the identification of anisotropic environmental features controlling electronic decoherence. Finally, we show that NSD alone cannot explain the >3× shorter experimentally observed coherence times and suggest that methyl groups at key protein sites may explain this discrepancy.

74 ATOMIC AND MOLECULAR PHYSICS↗

Cost of Fish Exclusion and Passage Technologies for Hydropower

Hydropower represents a reliable source of renewable energy and accounts for approximately 7% of the total electrical generation in the United States. Future expansion of hydropower is likely to be in the form of either smaller new stream development projects or powering existing non-powered dams. For these new projects to be successful, careful analysis of risks, costs, and uncertainty to offset reduced power production as well as ensuring the protection and safe passage of migratory fish to gain public support, will be required. Exclusion and passage are two common approaches to protect fish from entrainment and impingement at hydropower facilities. The thresholds for entrainment risk and requirements for exclusion and passage often differ depending on the species involved, the characteristics of the facility, and the goals of stakeholders. While the costs associated with environmental mitigations represent a large proportion of the total costs required for the licensing of hydropower facilities, little quantitative information is present within the literature regarding the specific costs of fish exclusion and passage. Working with FOA awardee Natel Energy, scientists at Oak Ridge National Laboratory were tasked with assessing the capital construction costs for downstream fish exclusion and passage infrastructure. This report used keyword searches of an existing environmental mitigation cost data set and manual extraction of additional cost data associated with protection, mitigation, and enhancement (PM&E) measures related to positive barrier screening and passage from regulatory licensing documents available in the Federal Energy Regulatory Commission (FERC) eLibrary. This approach yielded a total of 50 PM&E mitigation measures with estimated capital construction costs pertaining to positive barrier screens, 142 pertaining to passage studies, and 26 pertaining to passage-related studies. PM&E measures associated with positive barrier screens represented <10% of the 171 total FERC project dockets available in the data set. These data were highly skewed toward conventional relicensing projects, as <7% were associated with new stream development (NSD) projects. Results from these data indicate highly variable costs associated with fish screening, with flow-normalized costs one to two orders of magnitude higher for screening with the highest exclusion capability (≤0.09 in. spacing) compared with coarser screening (1 to 2 in.). Furthermore, estimated capital costs of passage infrastructure were positively related to the scale of the project based on installed capacity for some, but not all, types of passage. These data provide an initial baseline for estimating exclusion and passage costs for hydropower development and may help developers consider options for more fish-friendly generation technologies, though gaps remain relating to a lack of data, particularly for NSD projects. More data may still be available within the FERC eLibrary, but significant effort will be required to manually identify and extract the data for future analyses.

13 HYDRO ENERGY↗

HydroBio: Hydropower Capacity and Freshwater Biodiversity in Conterminous United States Sub-basins

This dataset summarizes existing and potential hydropower capacity and freshwater biodiversity at the sub-basin level throughout the conterminous United States (CONUS). It contains descriptive information regarding each sub-basin (e.g., 8-digit hydrologic unit code identifier, name, states, and size) along with sub-basin-level summaries of: 1) existing hydropower capacity (MW), 2) potential nominal non-powered dam (NPD) capacity (MW), 3) potential capacity of new stream reach development (NSD) (MW), and 4) freshwater biodiversity, including the total richness of fish, crayfish, and mussels and metrics that account for how rare and threatened those species tend to be. Hydropower data were obtained from Oak Ridge National Laboratory data resources (Existing Hydropower Assets, Non-Powered Dam Technical Potential, and New Stream Reach Development). Freshwater biodiversity data were obtained from NatureServe. Sub-basin characteristic information was obtained from the United States Geological Survey. Additionally, long data that provide lists of unique elements within each sub-basin for each constituent data resource (e.g., NatureServe, Existing Hydropower Assets) are provided to enhance dataset utility for users. The dataset provides, for the first time, a national-level assessment of existing and potential hydropower capacity in the context of freshwater biodiversity and is a valuable resource for stakeholders tasked with providing affordable, reliable energy to the American public while maintaining or enhancing invaluable freshwater resources. The dataset contains six data files in comma separated (*.csv) format that are within a zipped file.

Bozeman, Bryan [Oak Ridge National Laboratory (ORN↗

From pandemic preparedness to biofuel production: Tobacco finds its biotechnology niche in North America

As part of my NSD Innovation awarded funds (95470 Powell Innovation: charge code N38540) one my deliverables was a review article for journal submission summarizing my work on this project. My NSD Innovation project is expressing Ebola antibodies in tobacco plants. I've attached abstract below Title: From pandemic preparedness to biofuel production: tobacco finds its biotechnology niche in North America Abstract: Abstract: In 2012 scientists funded by the U.S. Defense Advanced Research Projects Agency (DARPA) produced 10 million doses of influenza vaccine in tobacco in a milestone deadline of one month. Recently the experimental antibody cocktail Zmapp™, also produced in tobacco, has shown promise as an emergency intervention therapeutic against Ebola. These two examples showcase how collaborative efforts between government, private industry and academia are applying plant biotechnology to combat pathogenic agents. Opportunities now exist repurposing tobacco expression systems for exciting new applications in synthetic biology, biofuels production and industrial enzyme production. Lastly, as plant-produced biotherapeutics become more mainstream, government funding agencies need to be cognizant of the idea that many plant-produced biologicals are often safer, cheaper and just as efficacious as their counterparts that are produced using traditional expression systems.

60 APPLIED LIFE SCIENCES↗

Design exploration of a Symmetric Pass Gate Adiabatic Logic for energy-efficient and secure hardware

Adiabatic logic is one of the circuit design techniques for designing energy-efficient hardware. In recent years, it has also been proved that this technique is suitable for designing secure hardware. In the existing literature, a Secured Quasi-Adiabatic Logic Family (SQAL) has recently been proposed in designing Differential Power Analysis (DPA)-resistant and energy-efficient hardware. SQAL shows improvement over all other existing DPA-resistant adiabatic logic in terms of energy dissipation and area-overhead. However, the drawback is, SQAL suffers from non-adiabatic energy loss during the evaluation of the outputs. To minimize the non-adiabatic loss, we propose in this paper a novel Symmetric Pass Gate Adiabatic Logic (SPGAL). SPICE simulations show that the bit-parallel cellular multiplier over GF(2 4 ) that we implemented using SPGAL saves up to 81% of energy as compared to SQAL at 12.5 MHz. Calculated values of Normalized Energy Deviation (NED) and Normalized Standard Deviation (NSD) show that the proposed logic gates based on SPGAL consume uniform energy for every cycle of operation irrespective of their input transition. Finally, the uniform energy rate and low power operation shows that the proposed SPGAL is energy-efficient in nature and would be resistant to DPA attack at the circuit level.

97 MATHEMATICS AND COMPUTING↗

Summary Report of Advanced Hydropower Innovations and Cost Reduction Workshop at Arlington, VA, November 5 & 6, 2015

On behalf of the U.S. Department of Energy (DOE) Wind and Water Power Technology Office (WWPTO), Oak Ridge National Laboratory (ORNL), hosted a day and half long workshop on November 5 and 6, 2015 in the Washington, D.C. metro area to discuss cost reduction opportunities in the development of hydropower projects. The workshop had a further targeted focus on the costs of small, low-head1 facilities at both non-powered dams (NPDs) and along undeveloped stream reaches (also known as New Stream-Reach Development or “NSD”). Workshop participants included a cross-section of seasoned experts, including project owners and developers, engineering and construction experts, conventional and next-generation equipment manufacturers, and others to identify the most promising ways to reduce costs and achieve improvements for hydropower projects.

13 HYDRO ENERGY↗

Hydropower Development Opportunities for Alaska Native Villages

This report consolidates efforts among Oak Ridge National Laboratory (ORNL), the United States Department of Energy's (DOE) Office of Indian Energy Policy and Programs, and the Alaska Energy Authority (AEA) to evaluate opportunities for hydropower development among 171 Alaska Native villages. This research builds upon new stream -reach development (NSD) research [3] conducted by DOE/ORNL and geospatial modelling provided by the Bureau of Indian Affairs (BIA) [ 2 ]. Based on that information, ORNL has developed a model that evaluates village diesel (gallons) consumption, cost, price per gallon, and kilowatt-hours produced and purchased [4], in conjunction with the past analyses of DOE and BIA, to identify potential benefits of diesel offset from hydropower development on a yearly and 50-year (assumed hydro project lifespan) basis.

13 HYDRO ENERGY↗

An Assessment of Hydropower Environmental Mitigation Costs

This report provides an assessment of environmental mitigation costs for hydropower projects across the United States (U.S.) based on data extracted from Environmental Assessments (EA) submitted to the Federal Energy Regulatory Commission (FERC). EAs are required by the Federal Power Act (FPA) for hydropower license and relicense applications to weigh the “power” and “non-power” (i.e. environmental) benefits of their development and operation. For this analysis, we collected data from 184 EA documents reviewed by FERC between 1996 and 2018, and created a database of environmental protection, mitigation, and enhancement (PM&E) measures with their associated economic information. The data cover two hydropower relicense categories—103 Relicensed Conventional Hydropower Dams (RCHD) and 6 Relicensed Pumped Storage Hydropower (RPSH) projects—and three new development categories—57 hydropower retrofits at Non-Powered Dams (NPD), 11 New Stream-Reach Development (NSD) projects and 6 Pumped Storage Hydropower (NPSH) projects. For the analysis, we classify the PM&E measures into 11 Tier 1 categories. We evaluated capital and operations & maintenance (O&M) costs of PM&E measures on a $\$$/kW basis by project type and mitigation category, as well as their share in the total project levelized cost of energy (LCOE).

13 HYDRO ENERGY↗

Hydropower Investment and Public-Private Ecosystem Assessment

The U.S. Department of Energy's (DOE's) Water Power Technologies Office (WPTO) commissioned this Report to evaluate the primary challenges in raising investment in medium-sized hydropower and PSH, defined as projects with five (5) to 30 megawatts (MW) of installed capacity, and to understand potential opportunities to increase mobilization of private sector investment in hydropower and PSH projects in the future. Based on stakeholder interviews, a market survey, and industry reports, this Report considers the investment and development trends and future opportunities for five hydropower project types: capacity additions, conduits, PSH (both open and closed loop), non-powered dams (NPDs), and new stream-reach development (NSD).

13 HYDRO ENERGY↗

A Novel Sediment Passage Module Design in Support of Standard Modular Hydropower

This document is the Final Technical Report (FTR) for University of Minnesota (UMN) project on the development of a novel sediment (e.g., sand) bypass technology for new stream reach development (NSD). The project duration was slightly over four years and organized over two budget periods (BPs), i.e., BP1 and BP2, with a Go/No-Go review at the end of BP1. The initial technology had a Technology Readiness Level (TRL) of two (2) and, over the life of the project, advanced substantially to TRL 3 or 4.

13 HYDRO ENERGY↗

Baseline Cost Model for Hydropower: Documentation (2025)

Hydropower currently contributes about 80 GW of conventional and 23 GW of pumped storage capacity to the United States (US) power grid. Previous studies have estimated a considerable amount of remaining US hydropower resources, including non-powered dams (NPD) (Hadjerioua et al., 2012), new stream-reach developments (NSD) (Kao et al., 2014), pumped storage hydropower (PSH) and canal/conduit (Kao et al., 2022). The combined theoretical capacity potential of these various hydropower resources is comparable to the existing US hydropower capacity. There is a continuing interest in developing this hydropower potential, particularly to help meet the increasing demand for electricity. However, available data (Sasthav and Oladosu, 2022) show that the rate of new hydropower development has slowed considerably over time despite the interest of industry stakeholders. This is partly due to the competition from other energy resources and from the highly dispersed nature of remaining hydropower resources, which lead to high information requirements for evaluating the feasibility of potential projects. Cost information provides the most succinct summary of the feasibility of a potential hydropower project required by stakeholders, including developers, investors, policymakers, consumer groups, etc., considering investment options. The best estimates of hydropower costs can be obtained through detailed engineering design and cost assessments of individual projects. However, this approach has high data and resource (time, funds, cross-disciplinary expertise) requirements that render it inapplicable for rapid cost estimation with limited data. Although innovative approaches can overcome some of these impediments (see Oladosu and Ma, 2024 for such an application to potential NPD projects), the development of such approaches still requires significant amounts of resources and are not generally applicable to all hydropower project types. Therefore, statistical and parametric methods using simpler cost specifications remain of significant utility to hydropower stakeholders and are, at the least, complementary to more detailed approaches, particularly when evaluating many potential projects.

13 HYDRO ENERGY↗