Search NASA⌕ Search

SEARCH · Search NASA

Results for “NUREG/CR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

MELCOR 2.2 Benchmarks of Peach Bottom NUREG/CR 7155 Uncertainty Analysis

The U.S. Nuclear Regulatory Commission (NRC) performed a first-of-a-kind uncertainty analysis (UA) of the accident progression, radiological releases, and offsite consequences for the State-of- the-Art Reactor Consequence Analyses (SOARCA) of an unmitigated long-term station blackout (LTSBO) severe accident scenario at the Peach Bottom Atomic Power Station. The objective of the UA was to evaluate the robustness of the SOARCA deterministic "best estimate results and conclusions documented in NUREG-1935, and to develop insight into the overall sensitivity of the SOARCA results to uncertainty in key modeling inputs. The study was completed in 2015 and documented in NUREG/CR-7155. Since 2015, two other SOARCA UAs were completed for two pressurized water reactor (PWR) plants. The PWR UAs incrementally updated the approach and methodology, including using the latest release of the MELCOR 2.2 computer code. There were also advances made in the state-of-the-art modeling related to NRC efforts using the Peach Bottom model in NUREG-2206, which provided the technical basis for the containment protection and release reduction rulemaking for boiling water reactors with Mark I and Mark II containments. This report documents the input model changes from the NUREG/CR-7155 study and performs a small number of reference calculations to assess the changes of the new computer code and the model input updates. The objective of the work is to verify whether the updated Peach Bottom MELCOR model and updated version of MELCOR support the conclusions formed in the Peach Bottom SOARCA UA by performing these representative calculations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modeling Common Cause Failures of Thrusters on ISS Visiting Vehicles

This paper discusses the methodology used to model common cause failures of thrusters on the International Space Station (ISS) Visiting Vehicles. The ISS Visiting Vehicles each have as many as 32 thrusters, whose redundancy makes them susceptible to common cause failures. The Global Alpha Model (as described in NUREG/CR‐5485) can be used to represent the system common cause contribution, but NUREG/CR‐5496 supplies global alpha parameters for groups only up to size six. Because of the large number of redundant thrusters on each vehicle, regression is used to determine parameter values for groups of size larger than six. An additional challenge is that Visiting Vehicle thruster failures must occur in specific combinations in order to fail the propulsion system; not all failure groups of a certain size are critical.

Haught, Megan↗

An Overview of the State-of-the-Art Reactor Consequence Uncertainty Assessment Accident Progression Insights

The U.S. Nuclear Regulatory Commission (NRC) with Sandia National Laboratories (Sandia) have completed three uncertainty analyses (UAs) as part of the State-of-the-Art Reactor Consequence Analyses (SOARCA) program. The SOARCA UAs included an integrated evaluation of uncertainty in accident progression, radiological release, and offsite health consequence projections. The UA for Peach Bottom, a boiling-water reactor (BWR) with a Mark I containment located in the State of Pennsylvania, analyzed the unmitigated long-term station blackout SOARCA scenario. The UA for Sequoyah, a 4-loop Westinghouse pressurized-water reactor (PWR) located in the State of Tennessee, analyzed the unmitigated short-term station blackout SOARCA scenario, with a focus on issues unique to the ice condenser containment and the potential for early containment failure due to hydrogen deflagration. The UA for Surry, a 3-loop Westinghouse PWR with a sub-atmospheric large dry containment located in the State of Virginia, analyzed the unmitigated short-term station blackout SOARCA scenario including the potential for thermally-induced steam-generator tube rupture. These three UAs are currently documented in three NUREG/CR reports. This report provides input to planned NRC documentation on the insights and findings from the SOARCA UA program. The purpose of the summary report is to provide a useful reference for regulatory applications that require the evaluation of offsite consequence risk from beyond design basis event severe accidents. This report focuses on the accident progression and source term insights developed from the MELCOR analyses. MELCOR is the NRC's best-estimate, severe accident computer code used in the SOARCA UAs. In anticipation of the SOARCA UA insights work, NRC and Sandia benchmarked the response of the Peach Bottom model to selected reference calculations from the Peach Bottom SOARCA UA. Peach Bottom was the first SOARCA UA performed and was completed in 2015 using the MELCOR 1.8.6 code. The PWR SOARCA UAs evolved the original methodology and utilized the updated MELCOR 2.2 computer code. The Peach Bottom model has been systematically updated for other NRC research efforts and has been updated to MELCOR 2.2. computer code. The findings from the new reference calculations using the updated model with the MELCOR 2.2 code are also integrated into the report. A second objective is an assessment of the applicability of the results to the other nuclear reactors in the U.S. As the key findings are reviewed, judgments are presented on the applicability of the results to other U.S. nuclear power plants. An important objective of the SOARCA program relied on high- fidelity plant-specific modeling. However, the nature of the insights and conclusions allowed judgements to be made on the applicability of the various insights to the same general classification of plant (i.e., BWR or PWR) or the entire fleet of plants. Finally, the results from the SOARCA UA accident progression calculations contain a wealth of information not previously documented in the NUREG/CRs. This report includes new but related information that can be used to benchmark past or support future regulatory decisions related to severe accidents. The new work includes a benchmark of the NUREG-1465 licensing source term definitions, the variability of key accident progression events and timing to radionuclide release, and an improved understanding of the timing and source terms from consequential steam generator tube ruptures. iii ACKNOWLEDGEMENTS The Sandia authors gratefully acknowledge the significant technical and programmatic contributions from the NRC SOARCA team which are reflected throughout the report. Dr. Tina Ghosh has been involved throughout the SOARCA UAs, providing the primary managerial and technical oversight. The long lists of NRC and Sandia contributors from the SOARCA UAs are cited in the three NUREG/CRs and are also gratefully acknowledged by the small team of authors compiling the results of their efforts. Significant technical contributions, advice, and reviews were provided by Dr. Hossein Esmaili, Dr. Alfred Hathaway, and Dr. Edward Fuller (retired) of the NRC. Dr. Randal Gauntt (retired), Mr. Patrick Mattie, Mr. Joseph Jones (retired), and Dr. Doug Osborn from Sandia are recognized as the SOARCA UA managers guiding the past efforts. There is a comparable list of project managers at the NRC including Ms. Patricia Santiago, Dr. Salman Haq, and Mr. Jon Barr. Sadly, we have lost Mr. Charlie Tinkler and Mr. Robert Prato, who were important contributors to the original SOARCA project. Finally, Mr. Kyle Ross and Mr. Mark Leonard have also retired but were significant technical contributors. Mr. Kyle Ross was the technical lead on all three SOARCA UAs and the original pressurized water reactor SOARCA study. Mr. Leonard was the technical lead on the original boiling water reactor SOARCA study and a key contributor to the first Peach Bottom SOARCA UA. iv

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Updated Guidance on Sensitivity/Uncertainty Methods Use for Nuclear Criticality Safety Validation

The use of sensitivity/uncertainty (S/U) methods in nuclear criticality safety (NCS) was established more than 25 years ago and has been increasing ever since. Recent interest in commercial applications involving uranium enrichments above 5 wt% 235 U has increased focus on demonstrating the applicability of existing critical experiments to this enrichment range. S/U techniques can also be particularly useful in assessing the similarity of new fuel forms in relation to those documented in existing published evaluations of benchmark critical experiments. Publishing updated recommendations for the use of these methods is thus important to ensure that new S/U practitioners can benefit from the years of development and application invested in generating a set of best practices to maximize the utility of these tools.

NCS↗