At least 19 records

Solar, Wind, and Load Forecasting Dataset for MISO, NYISO, and SPP Balancing Areas

The Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program is an initiative intended to foster "a fundamental shift in grid management rooted in an understanding of asset risk and system risk" (ARPA-E 2020). Launched by the Advanced Research Projects Agency-Energy (ARPA-E), the program supports efforts to incorporate uncertainty in electric power decision making. In support of PERFORM, the National Renewable Energy Laboratory (NREL) has produced a set of time-coincident forecasts of solar, wind, and load profiles. As part of Phase I of the PERFORM effort, NREL created a dataset that consists of one year of time-coincident load, wind, and solar actuals and probabilistic forecasts based on data from the Electric Reliability Council of Texas (ERCOT) (Bryce et al. 2023). In Phase II, NREL developed similar datasets for three other U.S. Independent System Operators (ISO): the Midcontinent Independent System Operator (MISO), the New York Independent System Operator (NYISO), and the Southwest Power Pool (SPP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Maximizing Revenue from Electrical Energy Storage Paired with Community Solar Projects in NYISO Markets

The New York State Public Service Commission recently made significant changes to the compensation mechanisms for distributed energy resources, such as solar generation. The new mechanisms, called the Value of Distributed Energy Resources (VDER), alter the value proposition of potential installations. In particular, multiple time-of-generation based pricing alternatives were established, which could lead to potential benefits from pairing energy storage systems with solar installations. This paper presents the calculations to maximize revenue from a solar photovoltaic and energy storage system installation operating under the VDER pricing structures. Two systems in two different zones within the New York Independent System Operator area were modeled. The impact of AC versus DC energy storage system interconnections with solar generation resources was also explored. The results show that energy storage systems could generate significant revenue depending on the pricing alternative being targeted and the zone selected for the project.

14 SOLAR ENERGY↗

A Technical and Economic Assessment of LWR Flexible Operation for Generation and Demand Balancing to Optimize Plant Revenue

With increased penetration of subsidized variable renewable energy (VRE) resources and competition from low natural gas prices, existing light water reactor (LWR) nuclear power plants (NPPs) are struggling to remain economically competitive. This work examines the potential economic competitiveness of various thermal energy storage (TES) technologies when coupled directly or indirectly with a NPP. To highlight their relative economic competitiveness, we contrast several energy storage solutions in stochastic dispatch optimization. We leverage data from recent work analyzing a range of TES technologies with varying capital costs, performance, and technology readiness level (TRL) to establish our case. We explore inserting these technologies into an electricity market with existing nuclear generation and large projected variable renewable energy (VRE) penetration. Although these technologies' projected capital costs may make them unlikely candidates in their current state, this analysis demonstrates a high-fidelity techno-economic analysis of energy storage. Furthermore, as the projected cost of energy storage technologies evolves, this analysis sets a precedent for similar future investigations. One region with projected trends that may be unfavorable for existing nuclear capacity is the New York Independent System Operator (NYISO) market. New York state’s baseload generation has been historically provided by fossil-fired and nuclear assets. However, amid economic pressures from subsidized VREs and low natural gas prices, the state has recently deactivated Indian Point nuclear power plant units 2 and 3. Furthermore, the state plans to meet its zero-emission generation target by 2040 by replacing fossil-fired capacity with significant investments in VRE resources like wind and solar photovoltaic (PV) and battery storage. Increased intermittent resource penetration lowers the baseload power requirement, adding further economic pressure to the state’s three remaining NPPs still in operation. With three NPPs still in operation in New York, this work analyzes potential economic benefits to NPPs on the New York grid when directly or indirectly coupled with various TES technologies. This work requires two modeling steps to analyze the potential economic benefits of various system configurations of the TES directly or indirectly coupled with nuclear. First, this analysis leverages capacity expansion modeling by experts at the Electric Power Research Institute (EPRI). Using their deterministic capacity expansion model, U.S. Regional Economy, Greenhouse Gas, and Energy (US-REGEN), EPRI analysts evaluated the capacity and generation evolution of the New York state energy market under four projection scenarios. These four projection scenarios were developed to represent the potential evolution of the capacity and generation in NYISO from 2015 to 2050 under various economic, technology, and policy constraints. The results from these capacity expansion models are then used as boundary conditions in the second modeling step. The second modeling step uses the Holistic Energy Resource Optimization Network (HERON) for a set of stochastic techno-economic analyses (STEAs) to investigate the potential increase in the economic viability of various configurations of the TES. With no current capacity expansion capabilities, HERON takes the data generated from US-REGEN for 2050 to generate synthetic load, solar, and wind data. Then HERON economically optimizes the capacity and dispatch of the various TES configurations. The potential economic benefit is the differential net present value (NPV) of the TES configurations from the no-TES baseline. As a stochastic techno-economic analysis package, HERON introduces uncertainty into the economic metrics, while US-REGEN trades resolution for reduced computational complexity. Using HERON also allows the modeling of direct thermal coupling, a feature not common in capacity and dispatch models. As expected, with high capital costs, the costs of introducing energy storage for all the technologies considered outweighed the potential economic benefit of this strategy for flexible plant operation. The benefit of this analysis is primarily in demonstrating a workflow that examines innovative solutions to increase NPP revenue via TES coupling. HERON’s stochastic capacity and dispatch optimization process used in this work has proven an effective tool in observing and evaluating the impact of introducing storage technologies in a grid energy system.

25 ENERGY STORAGE↗

Variability in Wind Energy Generation across the Contiguous United States

ERA5 provides high-resolution, high-quality hourly wind speeds at 100 m and is a unique resource for quantifying temporal variability in likely wind-derived power production across the United States. Gross capacity factors (CF) in seven independent system operators (ISOs) are estimated using the location and rated power of each wind turbine, a simplified power curve, and ERA5 output from 1979 to 2018. Excluding the California ISO, the marginal probability of a calm (zero power production) is less than 0.1 in any ERA5 grid cell. When a calm occurs, the mean co-occurrence across wind-turbine-containing grid cells ranges from 0.38 to 0.39 for ISOs in the Midwest and central plains [Midcontinent (or Midwest) ISO (MISO), Southwest Power Pool (SPP), and the Electric Reliability Council of Texas (ERCOT) region], increasing to 0.54–0.58 for ISOs in the eastern United States [Pennsylvania–New Jersey–Maryland interconnection (PJM), New York ISO (NYISO), and New England ISO (NEISO)]. Periods with low gross CF have a median duration of ≤6 h, except in California, and are most likely during summer. Additionally, gross CF exhibit highest variance at periods of 1 day in ERCOT and SPP; on synoptic scales in MISO, NEISO, and NYISO; and on interannual time scales in PJM. This implies differences in optimal strategies for ensuring resilience of supply. Theoretical scenarios show adding wind energy capacity near existing wind farms is advantageous even in areas with high existing installed capacity (IC), while expanding into areas with lower IC is more beneficial to reducing ramps and the probability of gross CF falling below 20%. These results emphasize the benefits of large balancing areas and aggregation in reducing wind power variability and the likelihood of wind droughts.

17 WIND ENERGY↗

ARPA-E PERFORM datasets

Time-coincident load, wind, and solar data including actual and probabilistic forecast datasets at 5-min resolution for ERCOT, MISO, NYISO, and SPP. Wind and solar profiles are supplied for existing sites as well as planned sites based on interconnection queue projects as of 2021. For ERCOT actuals are provided for 2017 and 2018 and forecasts for 2018, and for the remaining ISOs actuals are provided for 2018 and 2019 and forecasts for 2019. There datasets were produced by NREL as part of the ARPA-E PERFORM project, an ARPA-E funded program that aim to use time-coincident power and load seeks to develop innovative management systems that represent the relative delivery risk of each asset and balance the collective risk of all assets across the grid. For more information on the datasets and methods used to generate them see https://github.com/PERFORM-Forecasts/documentation.

5-min data↗

Operation-adversarial scenario generation

This paper proposes a modified conditional generative adversarial network (cGAN) model to generate net load scenarios for power systems that are statistically credible, conditioned by given labels (e.g., seasons), and, at the same time, “stressful” to the system operations and dispatch decisions. The measure of stress used in this paper is based on the operating cost increases due to net load changes. The proposed operation-adversarial cGAN (OA-cGAN) internalizes a DC optimal power flow model and seeks to maximize the operating cost and achieve a worst-case data generation. The training and testing stages employed in the proposed OA-cGAN use historical day-ahead net load forecast errors and has been implemented for the realistic NYISO 11-zone system. In conclusion, our numerical experiments demonstrate that the generated operation-adversarial forecast errors lead to more cost-effective and reliable dispatch decisions.

42 ENGINEERING↗

Regulatory Policy and Markets for Energy Storage in North America

The last 5 years have been one of the most exciting times for the energy storage industry. We have seen significant advancements in the regulatory process to make accommodations for valuing and monetizing energy storage for what it provides to the grid. The most impactful regulatory decision for the energy storage industry has come from California, where the California Public Utilities Commission issued a decision that mandates procurement requirements of 1.325 GW for energy storage to 3 investor-own utilities in 4 stages: in 2014, 2016, 2018, and 2020. Furthermore, at the Federal level, FERC’s Order 755, requires the transmission operators to develop pay for performance tariffs for ancillary services. This has had direct impact on the market design of US competitive wholesale markets and the monetization of fast responding grid assets. While this order is technology neutral, it clearly plays into the fast-responding capability of energy storage technologies. Today PJM, CAISO, MISO, NYISO, and NE-ISO have implemented Order 755 and offer new tariff for regulation services based on pay-for-performance principles. Furthermore, FERC Order 784, issued in July 2013 requires transmission providers to consider speed and accuracy in determining the requirements for ancillary services. In November 2013, FERC issued Order 972, which revises the small generator interconnection agreement which declares energy storage as a power source. This order puts energy storage on par with existing generators. This paper will discuss the implementation of FERC’s Pay for Performance Regulation order at all ISOs in the U.S. under FERC regulatory authority (this excludes ERCOT). Also discussed will be the market impacts and overall impacts on the NERC regulation performance indexes. The paper will end with a discussion on the California and Ontario, Canada procurement mandates and the opportunity that it may present to the energy storage industry.

Kintner-Meyer, Michael CW↗

Revealing Decision Conservativeness Through Inverse Distributionally Robust Optimization

This paper introduces Inverse Distributionally Robust Optimization (I-DRO) as a method to infer the conservativeness level of a decision-maker, represented by the size of a Wasserstein metric-based ambiguity set, from the optimal decisions made using Forward Distributionally Robust Optimization (F-DRO). By leveraging the Karush-Kuhn-Tucker (KKT) conditions of the convex F-DRO model, we formulate I-DRO as a bi-linear program, which can be solved using off-the-shelf optimization solvers. Additionally, this formulation exhibits several advantageous properties. We demonstrate that I-DRO not only guarantees the existence and uniqueness of an optimal solution but also establishes the necessary and sufficient conditions for this optimal solution to accurately match the actual conservativeness level in F-DRO. Furthermore, we identify three extreme scenarios that may impact I-DRO effectiveness. Our case study applies F-DRO for power system scheduling under uncertainty and employs I-DRO to recover the conservativeness level of system operators. Numerical experiments based on an IEEE 5-bus system and a realistic NYISO 11-zone system demonstrate I-DRO performance in both normal and extreme scenarios. An extended version of this paper with additional analyses is available at li2024revealing.

distributionally robust optimization↗

Hybrid Power Plant Bidding in Models of Future Electricity Systems

This paper proposes a stochastic model for hybrid power plants participation in day-ahead electricity markets, considering uncertainty in market prices and renewable generation. Additionally, it presents a methodology to incorporate this hybrid participation into existing production cost models (PCM), allowing the analysis and market design of future systems with high penetration of hybrids. These developments are illustrated using a wind-battery hybrid located in New York Independent System Operator (NYISO) footprint.

Kemp, Julie Mulvaney↗

Analysis of Wind Power and Load Data at Multiple Time Scales

In this study we develop and apply new methods of data analysis for high resolution wind power and system load time series, to improve our understanding of how to characterize highly variable wind power output and the correlations between wind power and load. These methods are applied to wind and load data from the ERCOT region, and wind power output from the PJM and NYISO areas. We use a wavelet transform to apply mathematically well-defined operations of smoothing and differencing to the time series data. This approach produces a set of time series of the changes in wind power and load (or ?deltas?), over a range of times scales from a few seconds to approximately one hour. A number of statistical measures of these time series are calculated. We present sample distributions, and devise a method for fitting the empirical distribution shape in the tails. We also evaluate the degree of serial correlation, and linear correlation between wind and load. Our examination of the data shows clearly that the deltas do not follow a Gaussian shape; the distribution is exponential near the center and appears to follow a power law for larger fluctuations. Gaussian distributions are frequently used in modeling studies. These are likely to over-estimate the probability of small to moderate deviations. This in turn may lead to an over-estimation of the additional reserve requirement (hence the cost) for high penetration of wind. The Gaussian assumption provides no meaningful information about the real likelihood of large fluctuations. The possibility of a power law distribution is interesting because it suggests that the distribution shape for of wind power fluctuations may become independent of system size for large enough systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NYSEG Seneca Compressed Air Energy Storage (CAES) Demonstration Project

Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant construction with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $\$$125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $\$$2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.

25 ENERGY STORAGE↗