Search NASA⌕ Search

SEARCH · Search NASA

Results for “New England demand response”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

A Look Ahead at Demand Response in New England

The paper describes the demand response programs developed and in operation in New England, and the revised designs for participation in the forward capacity market. This description will include how energy efficiency, demand-side resources, and distributed generation are eligible to participate in this new forward capacity market. The paper will also discuss various methods that can be used to configure and communicate with demand response resources and important concerns in specifying interfaces that accommodate multiple technologies and allow technology choice and evolution.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Challenges to retail demand response program participation in ISO New England wholesale markets: Technical assistance provided to the New England Conference of Public Utilities Commissioners

Berkeley Lab provided technical assistance to the New England Conference of Public Utilities Commissioners on challenges that participants in retail demand response programs face to accessing ISO-NE wholesale markets. This report summarizes findings from the technical assistance and includes actions that New England regulators can take to address the challenges to wholesale market access.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Demand Response Compensation Methodologies: Case Studies for Mexico

This report examines various compensation methodologies for demand response programs in Mexico. This report presents three case studies, including New England, California, and Hawaii. Demand response (DR) can refer to a variety of approaches to changing the amount and timing of customers' electricity use, allowing the electricity supplier to more easily balance electricity supply and demand. The level of compensation for a DR program will depend greatly upon both the regulatory context of the electricity supplier, as well as the economic circumstances of the DR providers. For a regulated utility, a proposed compensation level may need to pass regulatory approval. To determine the value of DR resources, a regulatory body typically seeks to determine the costs that the utility would avoid if demand-side resources 'produce' energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Physically Realistic Estimates of Electric Water Heater Demand Response Resource

Multiple grid integration studies have examined the value of demand response, including from water heaters, to bulk power systems. Common shortcomings of these studies include physically unrealistic assumptions. For example, studies often assume that all electric water heater load can be shed for up to an hour to provide capacity or contingency service, that all electric water heater load is shiftable, and that round-trip efficiencies for shifting service are 100%. Another issue is that simply summing up estimates of individual water heaters' flexibility bounds, an attractive idea for constructing the MW-scale resources necessary for direct inclusion in grid investment and operational models, can result in significant overestimates of actual resource, because, e.g., a water heater with the ability to reduce load may not be able sustain the reduction for as long as the aggregate model suggests is possible. This presentation demonstrates the impact of estimating the flexibility of electric water heaters with physically realistic models suitable for grid service analysis. Electric water heater flexibility representations are constructed based on ResStock simulations of New England. Specifically, we examine contingency resource (related to capacity, shed, and contingency reserve services) and energy shifting resource from electric resistance and heat pump water heaters. Different estimation methods are compared; and the surrogate models' event responses are validated against events directly simulated in EnergyPlus. We also demonstrate the impact of using electric water heaters for contingency reserves and energy shifting in detailed models of possible future ISO New England power systems.

building energy modeling↗

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

How Improved Forecasting Can Increase the Bulk Power System Value of Price-Responsive Electric Vehicle Managed Charging

Personal light-duty vehicle (LDV) electric vehicle managed charging (EVMC) can reduce power system costs by better aligning electric vehicle (EV) charging with locations and times of low energy cost or infrastructure use. The need to coordinate charging demand across thousands to millions of vehicles while preserving mobility service is a barrier to realizing the value of EVMC. Price-responsive dispatch mechanisms like time-of-use rates (TOU) and hourly real-time prices (RTP) are attractive compared to direct load control (DLC) because they only require one-way communications and local controls. However, increasing participation in price responsive mechanisms can induce costly-to-serve spikes in load and otherwise increase, rather than decrease, production costs. We quantify the ability of improved EVMC forecasting to sustain savings from price responsive mechanisms beyond the limit of 14% of LDVs actively participating observed in previous work. Perfect forecasting of price-responsive EV load makes TOU and RTP value-competitive with a low-error DLC formulation with up to 27% (within-week flexibility) to 45% or more (within-session flexibility) of LDVs participating in EVMC in an envisioned New England power system with 84% clean energy. Additional costs of implementing DLC should be no more than tens of dollars per vehicle-year if DLC is to be value-competitive with accurately forecast price-responsive EVMC for double-digit percentage shares of LDVs participating.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flexibility Reserve Reductions from an Energy Imbalance Market with High Levels of Wind Energy in the Western Interconnection

The anticipated increase in variable generation in the Western Interconnection (WI) over the next several years has raised concerns about how to maintain system balance, especially in smaller Balancing Areas (BAs). Given renewable portfolio standards in the West, it is possible that more than 50 gigawatts (GW) of wind capacity will be installed by 2020. Significant quantities of solar generationare likely to be added as well. The consequent increase in variability and uncertainty that must be managed by the conventional generation fleet and responsive load make it attractive to consider ways in which Balancing Area Authorities (BAAs) can pool their variability and response resources, thus taking advantage of geographic and temporal diversity to increase overall operational efficiency.Our analysis considers several alternative forms of an Energy Imbalance Market (EIM) that have been proposed in the non-market areas of the WI. The proposed EIM includes two changes in operating practices that independently reduce variability and increase access to responsive resources: BAA cooperation and sub-hourly dispatch. As proposed, the EIM does not consider any form of coordinated unitcommitment; however, over time it is possible that BAAs would develop formal or informal coordination plans. This report examines the benefits of several possible EIM implementations, both separately and in concert.

17 WIND ENERGY↗

Tokamak Energy’s pre-concept design for a fusion power plant: an overview of ST-E1

Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $\$$ 12–14k/kW of net electric power, and high availability (targeting > 80%). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

ST-E1↗